
http://www.advancedactuators.com
NextBolt User Manual
For support contact us a 1-800-408-7101 ext. 102
Table of Contents
Preface………………………………………………………………1
Installation Manual
1. Parts ........................................................................................3
2. Required Tools........................................................................5
3. Pre-installation........................................................................5
3.1 Mark and bore holes on the door..................................5
3.2 Deadbolt Latch Selection..............................................8
4. Installation ..............................................................................9
4.1 Installation of Deadbolt ................................................9
4.2 Installing Strike and Strike Lining Box (on the door
jamb).................................................................................10
4.3 Sizing Tail Piece (to the right length).........................11
4.4 Installation of the Outdoor Unit..................................13
4.5 Installation of the Indoor Unit ....................................16
5. Trouble Shooting ..................................................................23
Operation Manual.....................................................................25
Section I - Enrolling Administrators: ...............................29
Section II - Enrolling Fingerprint Users 2 thru 99:...........31
Section III –Deleting Individual Fingerprint Users:........35
Section IV –Deleting ALL Fingerprint Users: ................37
Section V –Unlocking the Actuator Systems NextBolt
from outside:.....................................................................39
Section VI –Locking the Actuator Systems NextBolt from
Outside:.............................................................................41
Section VII –Locking and Unlocking the Actuator
Systems Nextbolt from Inside: .........................................42
APPENDIX A …………………………………………..44
USER ENROLLMENT TABLE:.....................................47
Special THANKS from Actuator Systems……………....52