
4
II. Unpacking
The MicroTron™ Model RT has been shipped as a complete package, ready for installation.
If the shipping carton shows any signs of damage, notify the shipping company immediately
upon receipt. Advantage Controls cannot be held responsible for damage from shipping.
Unpack the carton and insure the following items are present:
1. Model RT pump/controller 4. Injection tting
2. Suction, discharge and bleed tubing 5. Instruction manual
3. Foot valve and weight 6. A two wire cable
III. Safety Considerations
NOTE: All MicroTron™ pumps are primed with water before leaving the factory. If the
solution to be pumped is not compatible with water, disassemble the pump uid end before
use. After disassembly, thoroughly dry the pump head, valves, and seals before pump is
reassembled and used.
A. Chemical Compatibility
MicroTron™ metering pumps are designed to work with most liquid chemicals depending upon
your pump’s liquid end materials of construction. A chemical resistance chart is available for
determining specic compatibility with a wide variety of chemicals. If you have further
compatibility questions, contact Advantage Controls service department at 1-800-743-7431.
B. Safety and Preparation
Always wear the proper protective clothing and gear when working around chemicals and
chemical metering pumps. Safety glasses, gloves, and aprons are critical in preventing accidental
exposure to dangerous chemicals. Liquids under pressure can present a special hazard when
a line or seal is punctured resulting in the spraying of chemical many yards away. If a chemical
spillage occurs, consult the Material Safety Data Sheet (MSDS) for specic instructions regarding
the chemical being used.
IV. Installation
A. Mounting
The standard Model RT is prewired for easy installation. Select a secure mounting
location convenient to electrical and plumbing connections that is accessible by the
operator. Do not install the pump in a location where the ambient temperature
exceeds 120°F (50°C). The pump is suitable for most outdoor installations, shielding from
direct exposure to the elements is recommended. The properties of solutions to be
metered should also be considered concerning temperature changes and effects to poly tubing.
Accessory item R00225 (plastic mounting bracket) is recommend for a secure installation.