4. PLACEMENT CONCRETE BASE (optional)
Positioning concrete base
The Allimex concrete base is placed under
the full length of the connected base units.
This means that a base is placed at the end
and at the beginning of each connecter base
unit, as well as between the premounted
brackets. Rubber protection is placed
underneath each Allimex concrete foot to
protect the roof surface.
On a green roof or pebble roof you must remove the planting and/or pebbles where the concrete
bases should be placed.
ATTENTION! Concrete bases must be placed on all places as described above. In the absence of one
or multiple footings/bases, this could lead to serious stability problems.
Concrete base + impact anchor Protective rubber
Placement base-units
Once the Allimex concrete bases have been positioned correct-
ly, the connected base units can be placed on the bases and
attached. This attachment is done by SS rivets HPS-I 8/10x40.
This plug is punched into the provided holes with a hammer.
Next, the nail is screwed or punched into the plug. When pun-
ching the nail, it’s convenient to use a screwdriver so the Solar-
Speed base units won’t be damaged.