ATS VDO Manuale utente

This manual contains important operating and safety information. Carefully read and
understand the contents of this manual prior to the operation of this equipment.
www.atspa.com
INSTRUCTION MANUAL
VDO
Vacuum Degassing Oven

2
REVISED JANUARY 2024
Information in this document is subject to change without notice and does
not represent a commitment on the part of:
Applied Test Systems (ATS)
154 East Brook Lane
Butler, PA 16002
USA
Telephone: +1.724.283.1212
For assistance with set-up or operation, contact the ATS Service
Department. Please have this manual and product serial number readily
available when you call.
© Copyright Applied Test Systems 2024

3
Table Of Contents
Introduction.................................................................................................................................................. 5
A.1 – Unpacking ..................................................................................................................................... 5
A.2 – Warranty Information................................................................................................................... 5
A.3 – After Sale Support ....................................................................................................................... 5
Safety ........................................................................................................................................................... 6
B.1 – For Owners, Operators, and Maintenance .............................................................................. 6
B.2 – Cautions & Warnings................................................................................................................... 6
B.3 – Caution & Warning Locations .................................................................................................... 9
System Overview ..................................................................................................................................... 10
C.1 Equipment Parts............................................................................................................................ 10
Front of Unit....................................................................................................................................... 10
Back of Unit....................................................................................................................................... 11
Interior Chamber............................................................................................................................... 12
Interior Controls ................................................................................................................................ 13
C.2 Product Description ...................................................................................................................... 14
C.3 Environmental Conditions............................................................................................................ 15
Verification Kit ........................................................................................................................................... 16
Installation ................................................................................................................................................. 17
D.1 Assembling the VDO .................................................................................................................... 17
D.2 Connecting and Powering Up ..................................................................................................... 18
D.3 Vacuum Adjustment ..................................................................................................................... 18
Verification................................................................................................................................................. 20
E.1 Verify Temperature ....................................................................................................................... 20
E.2 Verify Vacuum ............................................................................................................................... 23
F. Operation............................................................................................................................................... 24
F.1 Operation of VDO.......................................................................................................................... 25
G. Troubleshooting................................................................................................................................... 27
G.1 Preface ........................................................................................................................................... 27
G.2 No Power ....................................................................................................................................... 27
G.3 System Will Not Hold Vacuum.................................................................................................... 27

4
G.4 Controller Error.............................................................................................................................. 28
G.5 Pump Error..................................................................................................................................... 28
H. Maintenance......................................................................................................................................... 29
H.1 Cleaning and Preventative Maintenance .................................................................................. 29
H.2 Spare Parts .................................................................................................................................... 29
APPENDIX A: Warranty .......................................................................................................................... 30
Appendix B: Wiring Diagram .................................................................................................................. 31
Appendix C: Image Glossary.................................................................................................................. 34

5
NO.
AMP VAC
PH HZ
DWG
iFigure A.3.1 - ATS Sample Data Tag
Introduction
A.1 – Unpacking
Retain all cartons and packing materials until the unit is in operation. If
damage has occurred during shipping, notify Applied Test Systems (ATS) and the
carrier immediately. If it is necessary to file a damage claim, retain ALL the
packing materials for inspection by the carrier.
A.2 – Warranty Information
All new ATS systems are shipped with a warranty. Units have a warranty
against defective parts and workmanship for one calendar year from the date of
shipment. Please see APPENDIX A of this manual for complete details on the
warranty.
A.3 – After Sale Support
If there are any questions concerning the operation of the unit or software,
Before emailing, please obtain the software revision number and the serial
number from the unit’s data tag. A sample data tag is illustrated below, and can
be completed with the unit’s information for easy reference. Please be prepared
to give a complete description of the problem to the ATS Service Department.

6
Safety
B.1 – For Owners, Operators, and Maintenance
All ATS equipment is designed to be operated with the highest level of
safety. This manual uses note, caution, and warning symbols throughout, to draw
attention to important operational and safety information.
Read and understand all instructions and safety precautions listed in this
manual before installing or operating your unit. If you have any questions
regarding the operation of the unit or instructions in this manual, contact the ATS
Service Department at +1.724.283.1212.
Read and follow these important instructions. Failure to observe these
instructions can result in permanent damage to the unit, significant property
damage, personal injury or death.
B.2 – Cautions & Warnings
Burn Hazard / Hot Surface
Electrical Shock / Electrocution. Dangerous high voltages present. Do not
attempt to open the enclosure or gain access to areas where you are not
instructed to do so. Refer any possible servicing to qualified service
personnel only.
Hand Crush / Force From Above
Protective Earth (Ground) / Obey all national and local electric code
requirements.

7
General Danger. Thoroughly understand the safety features and operation
of the equipment. This manual will provide operators with safety concerns
and general procedures. Be familiar with correct operating principals and
use good judgment. Also, refer to the appropriate manuals for system
component safety manuals.
No Access For Unauthorized Personal
Read Operator’s Manual. Read and understand all instructions and safety
precautions listed in this manual before installing or operating your unit. If
you have any questions regarding operation of the unit or instructions in
this manual, contact our Service Department.
Disconnect power prior to performing maintenance. Turn off the unit and
disconnect the line cord from the power source before performing any
maintenance procedures.
Hot / Burn surface, use Personal Protective Equipment (PPE) when
operating the VDO, and handling materials associated with the testing
procedure.
Pinch Hazard

8
Do not open the panel
Unpack and operate on a stable surface.
Installation of electrical devices must be accomplished by competent
personnel and done in accordance with any current local and national
codes. Equipment grounding is a MUST.
Before energizing the electrical power to the Vacuum Degassing Oven,
turn off all power switches and place all controls in an OFF position. Check
that your power source is of the appropriate voltage and is surge-
protected. Use appropriate power adapters based upon your region.

9
iiFigure B.3.1 - Overhead View of Labels
iiiFigure B.3.2 - Side View of Labels
B.3 – Caution & Warning Locations

10
2
3
4
6
5
1
ivFigure C.1.1 - Front of VDO Unit
System Overview
C.1 Equipment Parts
Front of Unit
1. Vacuum Gauge
4. Process Complete Indicator
2. Vacuum Lid with View Port 5. Vacuum Relief Valve
3. In Process Indicator
6. Controller
Indice
Altri manuali ATS Forno



















