ATX VersAtive Pro Mondo Manuale utente

Hardware Interface Manual
Patent Pending
License-
free
End-of-Sale as of
March 31, 2017

General Guide Notes
Manual Release Date April 6 2015
Cross Reference Hyperlink Usage
Hyperlinks are used liberally throughout the guide to assist the reader in nding related information if the reader is viewing the
Adobe PDF le directly. Hyperlinks may be identied by their blue text. Most links are to related pages within the document,
but some reference outside documents if the reader needs that additional information. The Table of Contents is entirely
hyperlinked and bookmarks are available but the bookmark feature must be turned on in your Reader application.
Symbol Usage
Throughout the manual, some symbols are used to call the readers attention to an important point. The following symbols are
in use:
NOTE: This symbol usage will call the reader’s attention to an important operation feature of the
equipment which may be safety related or may cause a service outage.
FYI: This symbol indicates that there is helpful related information available in this note or
elsewhere in the guide.
DigiVu®II, DigiVu®, DigiVu®, UCrypt® and VersAtive®Pro are registered trademarks of ATX in the United States and/or other countries. Products or features contained herein may be covered by one or
more U.S. or foreign patents. Adobe®Flash®, Microsoft® Windows® and other non-ATX product and company names mentioned in this manual are the property of their respective companies.
Although every effort has been taken to ensure the accuracy of this document it may be necessary, without notice, to make amendments or correct omissions.
Specications subject to change without notice.

VersAtive®Pro Mondo – Hardware Interface Manual i
TABLE OF CONTENTS
1. SYSTEM OVERVIEW ................................................... 1-1
1.1 Chapter Contents ................................................. 1-1
1.2 Node Initial Conguration ........................................... 1-1
1.3 Node Interface Panel .............................................. 1-1
1.4 Front and Rear Panels ............................................. 1-2
1.5 System Power Supplies ............................................ 1-3
1.6 Rear I/O Ports ................................................... 1-3
1.7 Unit Identier Switches (UID) ........................................ 1-3
1.8 Support for IPMI .................................................. 1-4
2. INSTALLATION........................................................ 2-1
2.1 Chapter Contents ................................................. 2-1
2.2 Preparation for Installation .......................................... 2-1
2.3 Precautions ...................................................... 2-1
2.4 General Mechanical ............................................... 2-2
2.5 Power Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
2.6 Gigabit Ethernet Ports ............................................. 2-4
2.7 Installing the Chassis into a Rack ..................................... 2-4
3. STARTUP ............................................................ 3-1
3.1 Chapter Contents ................................................. 3-1
3.2 Management Computer ............................................ 3-1
3.3 Connecting to Your Computer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.4 Streaming Network Conguration ..................................... 3-2
4. SAFETY ............................................................. 4-1
5. SERVICE & SUPPORT.................................................. 5-1
5.1 Contact ATX Networks ............................................. 5-1
5.2 Warranty Information .............................................. 5-1
End-of-Sale as of
March 31, 2017

GENERAL GUIDE NOTES
ii VersAtive®Pro Mondo – Hardware Interface Manual
This page intentionally left blank.

CHAPTER 1: SYSTEM OVERVIEW
VersAtive®Pro Mondo – Hardware Interface Manual 1-1
SYSTEM OVERVIEW
1. System Overview
The VersAtive®Pro Mondo is four separate and independent transcoders called Nodes. As independent nodes, each may be
powered off and on without affecting the others. In addition,each node is a hot-swappable unit that may be removed from the
rear of the chassis.
1.1 Chapter Contents
• “Node Initial Conguration”
• “Node Interface Panel”
• “Front and Rear Panels”
• “System Power Supplies”
• “Rear I/O Ports”
• “Unit Identier Switches (UID)”
• “Support for IPMI”
1.2 Node Initial Conguration
NOTE: Each individual Node must have default Management (MGMT) port IP addresses
changed from 192.168.0.23 before connecting them to the management switch.
Each of the four nodes in a Mondo chassis are factory congured identically. It is important to understand that the standard
ATX Networks default IP address of 192.168.0.23 for the MGMT port is assigned to all nodes. Before connecting each node
management port MGMT (ETH0) to the management switch, the IP addresses must be re-congured.
Refer to chapter “STARTUP” on page 3-1 for further guidance.
1.3 Node Interface Panel
The Mondo chassis includes four front control panels on the handles, Figure 1-1, which interface to each of the nodes. Each
control panel is identical and provides you with system monitoring and control for one server node. LEDs indicate system
power, HDD activity, network activity, system overheat and power supply failure. A main power button and a system reset
button are also included. There are several LEDs on the front control panel to keep you constantly informed of the overall
status of each node. This section explains the meanings of LED indicators and the appropriate response you may need to
take.
Power
Switch
NIC LED
UID Sw/LED
Alert LED
Figure 1-1: Front Panel - Typical for all Nodes

CHAPTER 1: SYSTEM OVERVIEW
1-2 VersAtive®Pro Mondo – Hardware Interface Manual
1.3.1 Control Panel Buttons
Power
The main power button on each of the four control panels is used to apply or remove power from the power supply
to each of the four nodes in the chassis. Turning power to the node off with this button removes the main power,
but keeps standby power supplied to the system. Therefore, you must unplug the AC power cord from any external
power source before servicing. The power button has a built-in LED which will turn green when the power is on.
UID
The UID button is used to turn on or off the blue light function of the LED. This is built into the front side of the UID
button and at the rear end of each node. Once the blue light is activated, the unit can be easily located in very large
racks and server banks.
1.3.1 Control Panel LEDs
The four control panels located on the front handles of the Mondo chassis each have two LEDs. These LEDs provide you with
critical information related to its related node. This section explains what each LED indicates when illuminated.
Alert
This LED is illuminated when an alert condition occurs.
• A solid red light indicates an overheat condition in the system.
• A ashing red light which ashes in one second intervals indicates a fan failure.
• A ashing red light which ashes in four second intervals indicates a power supply failure.
When notied of an alert, check the power cables and supplies and make sure all fans are operating normally.
This LED will remain ashing as long as the fan does not function properly or remain on steady for as long as the
temperature is too high.
NIC
This LED indicates network activity on either MGMT (ETH0) or ETH1 when ashing. These are not indicators for
eth2, 3, 4 or 5.
1.4 Front and Rear Panels
Node B Control Panel
Node A Control Panel Node C Control Panel
Node D Control Panel
Figure 1-2: Front Panel
eth2 eth3 eth4 eth5
Power Indicator 1
Power Indicator 2
Node A
Node B
Node C
Node D
UID Sw/LED
UID Sw/LED
Node A MGMT
192.168.0.23
Node B MGMT
192.168.0.23
eth2 eth3 eth4 eth5eth1
eth1
Node D MGMT
192.168.0.23
Node C MGMT
192.168.0.23
Figure 1-3: Rear Panel - Four Identical Independent Nodes

CHAPTER 1: SYSTEM OVERVIEW
VersAtive®Pro Mondo – Hardware Interface Manual 1-3
1.5 System Power Supplies
Each Mondo chassis includes a high-efciency power supply, Figure 1-4, rated at 1620 Watts, and optionally, one similar
redundant backup power supply. In the unlikely event your power supply fails, replacement is simple and can be accomplished
without tools.
The power supply is used to provide the power for all four Nodes. Each Node however, can be shut down independently of the
other with the power button on its own control panel.
1.6 Rear I/O Ports
See Figure 1-5 for locations of the ports. This layout is typical of the four independent nodes.
1. IPMI Dedicated LAN
2. USB Port 0
3. USB Port 1
4. MGMT (ETH0)
5. ETH1
6. (Not Used)
7. VGA
8. UID Switch/L
9. ETH2
10. ETH3
11. ETH4
12. ETH5
1.7 Unit Identier Switches (UID)
Two Unit Identier (UID) Switch/LED Indicators are available on each node. The Front Panel UID Switch/LED is located at the
control panel adjacent each node, see Figure 1-1. The Rear UID Switch is located next to the VGA Connector of each node,
see Figure 1-3. When the user presses a UID switch on the front panel or back panel, both rear and front UID LED Indicators
will be turned on. Press the UID switch again to turn off both LED Indicators. These UID Indicators provide easy identication
of a node in a large rack installation that may be in need of service. Note: UID LED is supported by the physical switch or the
Baseboard Management Controller (BMC) which is a function related to IPMI. When it is controlled by the physical switch, it
will stay on solid. When it is controlled by the BMC, it will blink.
Power Indicator
Latch Lever
Figure 1-4: Redundant Power Supplies
Figure 1-5: Rear Panel Node Ports - Typical for all Nodes

CHAPTER 1: SYSTEM OVERVIEW
1-4 VersAtive®Pro Mondo – Hardware Interface Manual
1.8 Support for IPMI
The Intelligent Platform Management Interface is an standards based interface used by some system administrators to remotely
manage server hardware in an out of band fashion, that is irrespective of the installed operating system or BIOS of the sever.
Each VersAtivePro platform has a dedicated IPMI network port enabled with DHCP. IPMI Version 2.0 has been implemented
on all VersAtivePro products. More information may be obtained from the SuperMicro support site or the following links to the
available IPMI software and manuals.
• SuperMicro IPMIview software ftp://ftp.supermicro.com/utility/IPMIView/
• The IPMI User Guides http://www.supermicro.com/manuals/other/Embedded_BMC_IPMI.pdf
http://www.supermicro.com/manuals/other/SMT_IPMI_Manual.pdf
• IPMIView Software Manual http://www.supermicro.com/manuals/other/IPMIView20.pdf
• Command Line Interface tool ftp://ftp.supermicro.com/utility/SMCIPMITool/SMCIPMITool_User_Guide.pdf
NOTE: Security measures should be taken if trafc from IPMI managed equipment is connected
with Internet access. For more information see https://www.us-cert.gov/ncas/alerts/TA13-207A
1.8.1 IPMI Dedicated LAN LEDs
In addition to the Gigabit Ethernet ports, an IPMI Dedicated LAN is also located above the
Backplane USB ports 0/1, see Figure 1-5. The amber LED on the right of the IPMI LAN port
indicates activity, while the green LED on the left indicates the speed of the connection.
Figure 1-6: IPMI LAN Indicator

CHAPTER 2: INSTALLATION
VersAtive®Pro Mondo – Hardware Interface Manual 2-1
INSTALLATION
2. Installation
This chapter provides a guide to get your VersAtivePro Mondo machine up and running. Following these steps should enable
you to have the system operational within a minimum amount of time.
2.1 Chapter Contents
• “Preparation for Installation”
• “Precautions”
• “General Mechanical”
• “Power Considerations”
• “Gigabit Ethernet Ports”
• “Installing the Chassis into a Rack”
2.2 Preparation for Installation
Carefully unpack the equipment from the shipping box. If the box or equipment is damaged, notify the freight company to make
a damage claim. If you suspect that there is a problem with the equipment that may preclude safe operation, do not install or
operate it. Contact ATX Networks immediately for instructions.
NOTE: This equipment is intended for installation in a RESTRICTED ACCESS LOCATION only.
NOTE: This equipment is NOT for use in a computer room as dened in the Standard for Protection
of Electronic Computer/Data Processing Equipment, ANSI/NFPA 75.
NOTE: This equipment is intended for use in a xed position and should be installed securely
before operation is initiated.
The box that the chassis was shipped in includes two sets of rail assemblies, two rail mounting brackets and the mounting
screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process
in a minimum amount of time.
2.3 Precautions
2.3.1 Electrical Precautions
Basic electrical safety precautions should be followed to protect yourself from harm and the VersAtivePro Mondo chassis from
damage:
• Be aware of the locations of the power on/off switch on the chassis as well as the room’s emergency power-off switch,
disconnection switch or electrical outlet. If an electrical accident occurs, you can then quickly remove power from the
system.
• Power should always be disconnected from the system when servicing. When disconnecting power, you should rst
power down the operating system rst and then unplug the power cords. The unit has more than one power supply
cord. Disconnect two power supply cords before servicing to avoid electrical shock.
• When working around exposed electrical circuits, another person who is familiar with the power-off controls should
be nearby to switch off the power if necessary.
• Use only one hand when working with powered-on electrical equipment. This is to avoid making a complete circuit,
which will cause electrical shock. Use extreme caution when using metal tools, which can easily damage any electrical
components or circuit boards they come into contact with.
• Do not use mats designed to decrease static electrical discharge as protection from electrical shock. Instead, use
rubber mats that have been specically designed as electrical insulators.

CHAPTER 2: INSTALLATION
2-2 VersAtive®Pro Mondo – Hardware Interface Manual
• The power supply power cords must include a grounding pin and must be plugged into grounded electrical outlets.
• Remove any jewelry or metal objects from your body, which are excellent metal conductors that can create short
circuits and harm you if they come into contact with printed circuit boards or areas where power is present.
• This product may be connected to an IT power system. In all cases, make sure that the unit is also reliably connected
to Earth (ground).
2.3.2 General Precautions
• The server weighs approximately 85 lbs (38.6kg) when fully loaded. When lifting the system, two people at either
end should lift slowly with their feet spread out to distribute the weight. Always keep your back straight and lift with
your legs.
• While working on the system, do not wear loose clothing such as neckties and unbuttoned shirt sleeves, which can
come into contact with electrical circuits or be pulled into a cooling fan.
• After accessing the inside of the node, close the chassis back up and secure it to the rack unit with the retention
screws and ensure that all connections have been made.
2.3.3 Chassis Precautions
• Determine the placement of each component in the rack before you install the rails.
• Install the heaviest components on the bottom of the rack rst, and then work up.
• Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to
keep your system operating in case of a power failure.
• Allow any power supply modules to cool before touching them.
2.3.4 Rack Precautions
• Ensure that the leveling jacks on the bottom of the rack are fully extended to the oor with the full weight of the rack
resting on them.
• In single rack installation, stabilizers should be attached to the rack. In multiple rack installations, the racks should
be coupled together.
• Always make sure the rack is stable and secured before extending a Mondo chassis from the rack.
• You should extend only one Mondo chassis at a time - extending two or more simultaneously may cause the rack to
become unstable.
2.4 General Mechanical
• The equipment will require 2RU of vertical rack space and may be mounted directly above or below other equipment
without providing space between, however, 1RU space should be maintained from other equipment which generates
signicant heat. Leave enough clearance in front of the rack to enable you to extend the Mondo Chassis completely
(~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for sufcient airow and ease
of servicing.
• Be sure to maintain freedom of air movement around equipment. Installation of the equipment in enclosed racks
is not recommended due restricted air ow. The equipment is designed to operate to specication in an ambient
temperature of +10°C to +35°C (+50°F to +95°F). Normal room temperature is recommended to ensure proper long
term operation of the equipment.
• Consideration should be given to the connection of the equipment to the mains power and the effect that any possible
overloading of circuits might have on over current protection and wiring.
• A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular
attention should be given to power supply connections other than the direct connections to the branch circuit (i.e. the
use of power strips, etc.).
• Rear support of the unit is mandatory and rails for attachment to rear supports are provided. Do not use the unit
chassis to support other equipment. Alternately, if rear support rails are unavailable or impractical, install the unit on
a well supported shelf.
Indice
Manuali Transcodificatore popolari di altre marche

ASTRO
ASTRO U 224 Manuale utente

scope
scope Connexions CX5 Manuale di istruzioni

Hangzhou Dibsys Technologies Co., Ltd.
Hangzhou Dibsys Technologies Co., Ltd. Caster-T322 Manuale utente

scope
scope LARYNGOSCOPE Manuale utente

scope
scope Connexions CX5E Manuale di istruzioni

Kramer
Kramer FC-404NETxI Manuale utente











