Contela LoRa Manuale utente

Installation manual for LoRa Gateway
Contela, Inc.
Version 1.0
Contela, Inc. Confidential –Restricted Access
This document and the confidential information it contains
shall be distributed, routed or made available solely to
authorized persons having a need to know within Contela,
except with written permission of Contela.

Installation manual for LoRa Gateway
2(12)
[Change History]
Version
Changes
Remark
1.0
Draft

Installation manual for LoRa Gateway
3(12)
Table of Contents
1. HARDWARE INSTALLATION MANUAL...................................................................................5
1.1 Packing accessories................................................................................................................................... 5
Check packaging................................................................. 5
Descriptions about Internal, external components and Interface ...................... 5
Hardware Specification ........................................................... 6
Definition of LED Status .......................................................... 7
1.2 Hardware Installation ................................................................................................................................ 8
Check lists for LoRa Gateway installation ........................................... 8
Installation of LoRa Gateway ...................................................... 8
1.3 Cautions before installation.................................................................................................................... 11

Installation manual for LoRa Gateway
4(12)
Figures of Contents
Figure 1.1-1 Components and Interface of LoRa Gateway................................ 6
Figure 1.2 Example of pole installation for LoRa Gateway ................................ 9
Figure 1.2-7 AC Power connector Pin map............................................. 10

Installation manual for LoRa Gateway
5(12)
1. Hardware Installation Manual
1.1 Packing accessories
Check packaging
Check the LoRa Gateway for damage during transport and unpack it to check its contents.
LoRa Gateway : 1EA
AC Input cable connector : 1EA
Mounting bracket : 1EA
Assembly screws for mounting bracket : 4EA
Antenna
Reverse N-Type Cable
Descriptions about Internal, external components and Interface
6
1
2
3
4
5

Installation manual for LoRa Gateway
6(12)
Figure 1.10-1 Components and Interface of LoRa Gateway
1
Hardware Specification
•Supporting Band
- 900MHz(UL : 902.3MHz ~ 914.9MHz , DL : 923.3MHz ~ 927.5MHz)
•Transmitted Power
- 23dBm(200mW)
•Channel BW & Capacity
- Channel BW : UL 125KHz , DL 500KHz
- Channel : 8CH(Rx) , 1CH(Tx)
•Synchronization
- GPS
•Backhaul
- 10/100/1000 Base-T Ethernet
•Environment
- Natural convection
- Operating Temperature & Humidity : -30℃~ 50℃, 10% ~ 90%
- Storage Temperature & Humidity : -40℃~ 70℃, 10% ~ 95%
•Power
-Power Supply : AC100V ~ 120V , 50Hz / 60Hz
•Mechanical
-Dimension : 175.0 x 250.0 x 55.4(W x H x D mm)
-Weight : approximately 1.36kg
-Mount type : Pole / Wall mounting
-Dust & Water Protection : IEC529-IP54
-GR-63-Core Earthquake Zone 4

Installation manual for LoRa Gateway
7(12)
Definition of LED Status
A. LED operation
LED
Name
LED
Color
LED ACTION
Status
STATUS
OFF
-
Power off
Green
ON
In Service
Blink
Start-up
Red
ON
Error on LoRa gateway
Blink
Communication error with Network Server (Blinking every
second)
Orange
Blink
Communication error with G-EMS (Blinking every second)
B. Actions/measures depending on LED operation status
(1) In case the LED is permanently red
Open ‘LED Status panel’and press the Reset Button (RST) for at least 1 second.
If the LED operation is not restored by Reset Button, unplug the power from the
distribution box and wait until the discharge is complete (when the STATUS LED

Installation manual for LoRa Gateway
8(12)
is off), then apply power. (It takes about 20 ~ 30 seconds)
(2) In case the red LED flashes repeatedly
Through G-EMS, check the IP address of Network Server is registered in LoRa
Gateway.
Check if the LoRa gateway is registered as a LoRa gateway that can be
interworked to the Network Server.
If the current state continues after checking all above, check with the local NOC
for the circuit configuration status.
(3) In case the orange LED flashes repeatedly
Check if MMC command execution from G-EMS to LoRa Gateway is working.
In case MMC command from G-EMS is executed
Check if the G-EMS address registered in LoRa Gateway is correct.
Check if the Gateway’s request is processed normally on the G-EMS.
In case MMC command from G-EMS is not executed
Check the configuration of the line to make sure that there is no problem in
network connection with G-EMS.
1.2 Hardware Installation
Check lists for LoRa Gateway installation
A. Check the installation materials of LoRa Gateway
Check the contents of LoRa Gateway (AC input cable connector etc.)
Identification of facility materials (main installation bolt/nut, facility structure, etc.)
B. Check the external condition of LoRa Gateway before installation.
Make sure that the tightening screws of the LoRa Gateway are tightened and there is no
problem with the waterproof structure.
Make sure that there is no apparent problem during the movement of each external port.
C. Check the installation direction of the LoRa Gateway. (Ports are always downward)
LoRa Gateway should be installed in a position where the upper side of the LoRa
Gateway is open to see the sky so that the GPS antenna can receive the satellite
signals smoothly with the built-in GPS antenna.
Installation of LoRa Gateway
Check that all the installation materials of LoRa Gateway are prepared.
The following figure is an example of installing a pole, and it can be installed using a U-bolt
(or pole mounting device, pole fixing band, etc.) as shown.

Installation manual for LoRa Gateway
9(12)
Figure 1.20 Example of pole installation for LoRa Gateway 2
Once LoRa Gateway is installed, proceed with the RF service antenna connection, Backhaul
connection, AC power connection and grounding work.
3
A. RF service antenna connection
The RF service antenna connection connector uses N-type Reverse (N-50Ω) connector.
After connecting the antenna cable, finish it with a waterproof shrink tube to make it
waterproof. Fix the cables so that they do not shake in vibration or wind.
B. Backhaul Connection
RJ45 connector is used for backhaul connector, and Cable grand (DAM25, Dong-A) is
used for connector external waterproof connector. The Ethernet cable for Backhaul is
constructed by connecting method that can be waterproofed by using corrugated pipe
fitting to the cable grand.
After connection, waterproof finishing is done to prevent moisture from entering into the
enclosure by using waterproof shrink tube or waterproof silicone. Fix the cable so that it
does not shake with vibration or wind.
C. AC power connection
Be careful not to install this LoRa Gateway inside the
building because it is a GPS receiver embedded.
Cautions

Installation manual for LoRa Gateway
10(12)
Connect the AC power to the LoRa Gateway through an external power distribution box.
The AC power cable is not provided separately. Only the connector that is connected to
the LoRa Gateway is provided, and connect the AC power cable by assembling the
waterproof connector that comes with LoRa Gateway.
The figure below shows the pin map of the AC input connector.
When working on AC input cable in the field, make sure to use it according to the pin map
shown below.
Figure 1.20-7 AC Power connector Pin map 4
5
The AC power connector specification conforms to the MS3106A-10SL-3 (MIL-C-5015)
And the connector connected to the cable is MS3106A-10SL-3 (MIL-C-5015).
When installing, prepare the MS3106A-10SL-3 (MIL-C-5015) (supplied) and make the cable
according to the pin map above.
After connecting the power cable, be sure to finish using a waterproof shrink tube to make it
waterproof and fix the cable to prevent it from being shaken by wind and vibration.
D. Grounding
Connect the ground wire through the ground terminal located on the right side (or left side)
of the enclosure.
A : AC_H
B : AC_N
C : GND
When connecting the power connector, make sure
that it is aligned with the erroneous insertion
protrusion, and be careful not to forcibly force the
connector or damage the connector.
Cautions
Indice
Manuali Portale popolari di altre marche

LST
LST M500RFE-AS Manuale utente

Kinnex
Kinnex Media Gateway Manuale utente

2N Telekomunikace
2N Telekomunikace 2N StarGate Manuale utente

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Manuale utente

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE Manuale utente

Telsey
Telsey CPVA 500 - SIP Manuale utente











