
Installation Guide — Doc. 9338A
TST-1080 Installation (with TST-1080-DSW)
Use the following procedures to install the TST-1080 touch screen with the TST-1080-DSW.
NOTE: The TST-1080-DSW wall dock is designed for flush-mount installation in a flat, vertical wall
structure. Installation of the wall dock requires additional mounting hardware (not included):
•The TST-902-DSW-BB and TST-902-DSW-BBI back boxes are available for both framed and
masonry construction.
•The TST-902-DSW-PMK, TST-902-DSW-WMKM, and TST-902-DSW-WMKT mounting kits
are available for preconstruction and postconstruction applications that do not require a back
box.
In the Box (TST-1080-DSW)
TST-1080-DSW, Wall Dock for TST-1080
Connector, 2-Pin (2003574)
Screw, 6-32 x 1-1/2 in., Flat Head, Phillips (2031703)
Plug, 0.35 x 0.50 in., Black (2042641)
Screw, 6-32 x 1 in., Flat Head, Phillips, Black
(2060660)
Key, Release Lock (4522222)
Install the Mounting Hardware
One of the available TST-1080-DSW mounting accessories (not included) must be installed prior to
installing the TST-1080-DSW. Refer to the following installation procedures depending on the chosen
mounting hardware:
NOTE: Ensure the chosen mounting location allows for an air gap of at least 12 in. (305 mm) in the
wall cavity above and below the TST-1080-DSW for heat dissipation.
•For preconstruction applications where a back box will be fastened to the left or right-hand stud of
a framed wall prior to drywall installation, refer to TST-902-DSW-BB Installation.
•For preconstruction applications where mounting hardware (without a back box) will be fastened to
the left or right-hand stud of a framed wall prior to drywall installation, refer to TST-902-DSW-PMK
Installation.
•For postconstruction applications where a back box will be installed into masonry or concrete, refer
to TST-902-DSW-BBI Installation.