FP3000 RAID
USER'S
MANUAL
10
CROSS T.E.C www.crossups.com
3.2.2. Pre-installation Requirement
All the circuitry and the control panel are very delicate parts.
Hence, the careful handling is required. Sufficient space (about 20cm
distance) is necessary for the ventilation intake and outlet which are
placed in front and back of the equipment for air cooling.
3.2.3. Connection of Power
First of all, the size of the cable needs to be calculated according to the
necessary capacity of current, and then ensure the position where the cables
are connected. Make sure that all the circuit breakers are at "OFF"
position, and rearrange the input transformer wiring, as appropriate,
depending on AC input power. After completing the wiring of input
cables to the relevant terminal, battery cables need to be connected as
well with enough care and concern about the positive and the negative cables.
Note
:All the connections are to be made FIRM.
4.
OPERATION
PROCEDURE
4.1. Preoperational Requirement
4.1.1. Before starting the operation of the system, the operator (or whoever
wants to instruct the machine) is supposed to obtain enough
information and knowledge about start-up, shut-off, repair, routine
check, maintenance, and all other relevant system operation.
4.1.2. Make sure that cables are all at the appropriate places.
4.1.3. During the maintenance, if the UPS needs to be stopped, check and
ensure that the power is disconnected at least at the service required
section, in order to avoid the possible an electric shock.
4.2. Preparations
4.2.1. Check and verify that the input circuit breaker(CB1) and the output
circuit breaker(CB3) are in "OFF" position.
4.2.2. Check and verify that all the connectors and the circuit boards are at