Danelec DM800 Manuale utente

Installation manual for
DM800 ECDIS G2
Document Number DBS11427
Version Number 2.1
Date December 2016
P/N (hard copy) 9303423-21

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 2/67
Revision record
Version
Date
Description
1.0
November 2015
Original issue of document
2.0
September 2016
Updated for DM800 ECDIS G2 version 3.xx and IEC61174
Ed.4
2.1
2016-12-02
Updated with new keyboard drawings, and DM700 ECDIS
related information

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 3/67
Contents
REVISION RECORD...........................................................................................................2
1SCOPE AND PURPOSE ..........................................................................................6
1.1 References................................................................................................................6
1.2 Terms and Abbreviations ..........................................................................................6
2SYSTEM OVERVIEW...............................................................................................7
2.1 Main cabinet..............................................................................................................8
2.1.1 DPU...................................................................................................................8
2.1.2 DVD drive with USB port....................................................................................8
2.1.3 USB hardware key.............................................................................................8
2.2 Monitor......................................................................................................................8
2.3 Keyboard...................................................................................................................8
2.4 Alarm panel...............................................................................................................9
2.5 ECDIS cluster..........................................................................................................10
2.5.1 Specification of cables for the ECDIS cluster...................................................12
3INSTALLATION......................................................................................................13
3.1 List of parts .............................................................................................................13
3.2 Installation kit ..........................................................................................................14
3.3 Power requirements................................................................................................15
3.4 Grounding of data cables........................................................................................15
3.5 Fixing of other cables..............................................................................................15
3.6 Tool for opening the wire clamps inside the Wago connectors ...............................15
3.7 Termination resistors for IEC 61162-2 ....................................................................16
4RECOMMENDED STANDARD CONFIGURATION...............................................17
5SYSTEM CONFIGURATION..................................................................................18
5.1 Power up of ECDIS.................................................................................................18
5.2 Initial configuration of the Master ECDIS ................................................................19
5.2.1 Configuration of monitor type...........................................................................20
5.2.2 Configuration of mouse/trackball......................................................................22
5.2.3 Configuration of cluster size.............................................................................22
5.2.4 Initial configuration of network ports.................................................................23
5.2.5 Initial configuration of external equipment........................................................24
5.2.6 Configuration of local serial ports.....................................................................25
5.2.7 Saving the initial configuration .........................................................................27
5.3 Finalizing the configuration .....................................................................................29
5.3.1 Configuration of access to remote port ............................................................29
5.4 Configuration of USB hardware key........................................................................31
6CONFIGURATION OF THE ECDIS SOFTWARE ..................................................33

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 4/67
6.1 Main Screen............................................................................................................33
6.2 Main Menu ..............................................................................................................34
6.3 Service Technician Access .....................................................................................34
6.4 Sensors (Input/Output)............................................................................................35
6.4.1 Creating a new sensor.....................................................................................35
6.4.2 Line monitor.....................................................................................................37
6.4.3 Deleting a sensor.............................................................................................38
6.4.4 Available sensors.............................................................................................38
6.5 Vessel Particulars Setup.........................................................................................40
6.5.1 Conning station position...................................................................................40
6.6 Static Ship and Voyage Data ..................................................................................41
6.7 Initial data installation..............................................................................................43
6.8 Displaying of chart data...........................................................................................43
7ADVANCED CONFIGURATION.............................................................................44
7.1 Configuration of access to external data networks..................................................44
7.2 Configuration of External Equipment.......................................................................45
7.2.1 IEC61162-450 Image output............................................................................45
7.2.2 NavBox chart update .......................................................................................46
7.3 Configuration of virtual data lines via TCP/IP..........................................................47
8SERVICE MENU.....................................................................................................48
8.1 Service panel ..........................................................................................................49
8.2 Replacement of defective DPU...............................................................................50
8.2.1 Replacement of defective DPU with intact SSD...............................................50
8.2.2 Replacement of defective DPU with defective SDD.........................................50
8.3 Dump for support ....................................................................................................50
8.3.1 From within the ECDIS software......................................................................50
8.3.2 From the Service Menu....................................................................................51
9RE-INSTALLATION OF ECDIS..............................................................................52
9.1 Install ECDIS...........................................................................................................53
10 DETAILED SPECIFICATION OF THE IEC 61162-450 INTERFACE.....................55
10.1 Maximum data rate .................................................................................................55
10.2 Maximum datagram size.........................................................................................55
10.3 Default parameters..................................................................................................55
10.4 Supported transmission groups...............................................................................55
10.5 Description of other network function, ONF ............................................................55
10.5.1 NavBox interface (chart data) ..........................................................................55
10.5.2 TCP IEC61162-1 data......................................................................................55
10.5.3 IP addresses used internally by the ECDIS .....................................................55
10.6 Specification for Interface, connectors and cables..................................................56
11 INSTALLATION PLAN...........................................................................................57

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 5/67
12 COMMISSIONING..................................................................................................59
13 MAINTENANCE SCHEDULE.................................................................................59
14 LIST OF SPARE PARTS........................................................................................59
15 APPENDIX A - INSTALLATION DRAWING FOR MAIN UNIT ..............................60
16 APPENDIX B - INSTALLATION DRAWINGS FOR EK 03-001 KEYBOARD........61
17 APPENDIX C - INSTALLATION DRAWINGS FOR CORTRON KEYBOARD.......63
18 APPENDIX D - INSTALLATION DRAWINGS FOR ALARM PANEL ....................67

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 6/67
1 Scope and purpose
Installation manual for DM800 ECDIS G2.
1.1 References
DBS11425 User manual for Danelec Marine ECDIS software P/N 9303396
DBS11426 User manual for DM800 ECDIS G2 hardware P/N 9303424
1.2 Terms and Abbreviations
CF-SSD Compact Flash Solid State Disk
ECDIS Electronic Chart Display and Information System

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 7/67
2 System overview
A DM800 ECDIS G2 system consists of the following parts:
ECDIS DM800 G2 DPU
Monitor
Keyboard
DVD drive and
External USB port
Alarm
panel
USB 5
USB 6
USB 7
AP
DVI
HW-KEY
USB 8
2 x IEC
61162-2
10 x IEC
61162-1
For sensors
4 x
Ethernet
To other
ECDIS’s, VDR
or NavBox
COM1
USB port
DVD drive

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 8/67
2.1 Main cabinet
The main cabinet must be installed on a bulkhead that can easily carry the weight (8kg/17lbs) of the
cabinet.
Consult Appendix A - Installation drawing for main unit for details
The main cabinet contains the following parts:
2.1.1 DPU
The data processing unit contains the computer for the ECDIS software and a communication I/O
interface.
Indicator LED’s and other features are described in DBS11426 “User manual for DM800 ECDIS
G2 hardware”.
DPU front panel
2.1.2 DVD drive with USB port
The DVD drive is used when installing software and updating charts. The USB port on the DVD
enclosure may also be used for updating charts. There must be easy user access to the DVD drive
and the USB port.
2.1.3 USB hardware key
The USB hardware key contains the keys needed for enabling access to charts.
The hardware key must be installed in USB port 8 on the DPU
2.2 Monitor
The monitor must be installed on a table top using the stand, or flush-mounted in the console.
Consult the installation manual supplied with the monitor.
2.3 Keyboard
The keyboard must be installed on a table top using the brackets supplied with the product.
Consult “Appendix B - Installation drawings for EK 03-001 keyboard”or “Appendix C -
Installation drawings for Cortron keyboard”for details.

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 9/67
Some of the most important functions on the ECDIS are also located on the [F1] - [F10] function-
keys (see DBS11425 “User manual for Danelec Marine ECDIS software”).
A sticker showing symbols for the hot key functionality is mounted on the keyboard.
.
E.g. sticker mounted on Cortron keyboard.
2.4 Alarm panel
The alarm panel includes:
A buzzer
Keys for controlling the volume of the buzzer
Keys for setting the computer for the ECDIS software in standby and starting it up again.
The alarm panel must be installed on a table top adjacent to the monitor.
Consult “Appendix D - Installation drawings for Alarm panel”for details.

Installation manual for DM800 ECDIS G2
Copyright Danelec Marine A/S
DBS11427-21 Page 10/67
2.5 ECDIS cluster
A complete ECDIS installation will in most cases consist of a number of systems (a cluster). In
order to ensure redundancy, each ECDIS must be connected to two other systems if the cluster
contains more than two systems.
Cluster containing 2 x DM800 ECDIS G2
Cluster with 3 x DM800 ECDIS G2
1 2
1 2
1 2
Backup
Planning
Master
1 2
1 2
Backup
Master
Altri manuali per DM800
1
Indice
Altri manuali Danelec Equipaggiamento marittimo




















