Dauphin PHONE CUBE Manuale utente


1
https://www.kctoolco.com/hazet-863p-1-4-reversible-ratchet/
REVERSIBLE RATCHET 1/4“ DRIVE FOR
CORNER SCREWS ON TOP TRAVERSE BEAMS
ALTERNATIVE : 5MM ALLEN KEY
TOOLS REQUIRED:
HARDWARE INCLUDED:
BOTTOM FEET FILLERS
SCREWS FOR DOOR
COVERS FOR DOOR FRAME HOLES
ROOF CLIPS TO SECURE CEILING
8MM HEX BOLT SCREWS TO SECURE
PANELS TO TOP TRAVERSE
DESK KIT THREADED INSERTS
AND LOCK NUTS
TO SECURE DESK TO PANEL
RUBBER MALLET FOR INSERTING PANELS
1/8 DRILL BIT FOR DOOR HOLES
CORNER SQUARE TO ALIGN FRAME
FLAT PALLET KNIFE TO FACILITATE PANEL INSTALL
SPIRIT/LASER LEVEL TO LEVEL THE UNIT
CLAMPS TO FACILITATE PANEL INSTALL
13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE
8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS
6MM ALLEN KEY FOR ROOF CLIPS
PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME
TWO 9 FT. STEP LADDERS FOR INSTALLING ROOF & PANELSMOVING CART/DOLLY FOR TRANSPORTING PANELS,
ROOF, AND POSTS

2
TOP TRAVERSE BEAMS
VERTICAL POSTS
SQUARE FLOOR BASE
MAIN ELEMENTS OF SKELETON FRAME:
STANDARD PHONE CUBE PANELS:
TECH ACOUSTIC PANEL
(DESK|POWER) GLASS DOOR GLASS PANEL STANDARD
ACOUSTIC PANEL
Fabric faces are applied to both sides of each Acoustic Panel
Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation

3
The 1026 marked beams will be installed on
the door side (Front) and opposite rear side.
Desk and Power can be installed on the rear.
The 1028 marked beams will be installed on
the sides (left and right) of the Cube. If the desk
is to be installed on the left or right, the beam
with the cut out must be installed on the
desk + power side.
One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go
through this beam and the Tech panel.
The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side),
but can also be installed on the rear or the right side.
LOCATION OF THE TECH PANEL FOR DESK AND POWER
POWER CUTOUT IN TOP TRAVERSE BEAM
1026mm
1026mm
(NO CUTOUT)
(REAR WITH CUTOUT)
TRAVERSE BEAM POWER CUTOUTS

4
Assemble two parallel sides by securing vertical
posts A and Bwith a 1026mm top traverse beam as
shown above.
The TRAVERSE Beam for the DOOR PANEL must have
NO CUTOUT.
Connect the opposite goal posts using the 1028mm
beams.
ASSEMBLE THE SKELETON FRAME (DO NOT TIGHTEN SCREWS ALL THE WAY)
TOP TRAVERSE BEAMS TO VERTICAL
POSTS CONNECTION DETAIL
1
DO NOT TIGHTEN SCREWS!
Screws will be tightened firmly later
at step
B
B
A
A
A
A
B
B
TOP TRAVERSE BEAMS (TOP VIEW):
The screw
plates go IN the
vertical post.
A Ratchet with 5mm hex bit is
used to assemble the
TRAVERSE Beam.
TRAVERSE BEAM: WITH CUTOUT
TRAVERSE BEAM: NO CUTOUT

Lay down the square floor base in the exact desired location for the Telephone Cube. Ensure that the
door side is on the desired side and that the square base is placed face up, with countersink holes
facing up.
COUNTERSINK FACE UP
2LOCATE WHERE PHONE CUBE IS TO BE INSTALLED
5
The leveling glides of the Vertical
Posts go into the outer holes of the
skeleton base.
PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS
3

6
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR
Insert and feed the GST end of the cable up the conduit from the bottom of the panel.
DISREGARD THIS STEP IF THE POWER SOURCE IS LOCATED OUTSIDE THE CUBE
(CEILING, FLOOR OR WALL)
APPROX 33FT LONG
BOTTOM
TOP
GST
3 PIN GST
3 PIN
DISREGARD THIS STEP IF THE CONFIGURATION DOES NOT HAVE A TECH PANEL
4

7
INSTALL THE PANELS INTO SKELETON FRAME
Once panel is half way inside the frame,
use a clamp on the skeleton frame and the
panel frame to facilitate the process.
If the source of power is coming from
the floor, feed the GST cable through
the top traverse beam’s power cutout.
4
5
PER STEP
Insert the Tech Panel
from the bottom on an
angle, then fit the
sides and top into the
skeleton frame. Use a
flat pallet knife.
Install and tighten the screws to hold the
panel within the skeleton frame.
USE 8MM HEX BIT
WITH EXTENSION
1
2
3
4
Repeat these for all Panels.
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR

8
Install the door handles onto the door. Ensure the handles are
positioned as pictured facing the front of the glass door.
Check that the door latch clicks when closing the door.
Install the door panel. Secure the door frame with two
hex bolt screws as previously done with the other panels.
PREPARE AND INSTALL THE DOOR
INSTALL THE PANELS INTO SKELETON FRAME 6
The door
handle
package will
be attached to
the glass door.
12Cut & take out the plastic strips
once the door frame is installed.
Black Plastic
Strips:
They keep the
door glass panel
in the door
frame during
assembly.
USE 8MM HEX BIT
WITH EXTENSION
1. Remove the
protective piece of
wood from the
bottom of the door
carefully by removing
both leveling glides.
2. Install the leveling
glides back onto the
door when finished.
Preparing the Door Panel
Installing the Door Panel

9
Adjust the Panel leveling glides and
Vertical Post leveling glides to ensure
that the whole structure is leveled in
all directions.
Close the door before leveling (until it
clicks).
Square all corners and firmly tighten all of the
corner screws and hex bolts located on top of
the panels and door. Check that diagonal
measurements from the inside are equal all
around.
8FINAL LEVELING OF STRUCTURE
ENSURE UNIT IS SQUARED/TIGHTEN
THE BOLTS
7
Make sure all glides are in
their respective holes before
leveling the structure.
IMPORTANT:
1
2
3
Leveling the unit from a flat stance
minimizes the amount of open space
between floor and posts/panels.
(IMPORTANT FOR ACOUSTICS).
Click
Use the 13mm Flat Wrench to
loosen/tighten the leveling glides
Adjusting Leveling Glides:
Loosening Leveling
Glide
Tightening Leveling
Glide
Loosening the
leveling glides will
RAISE the post.
Tightening the
leveling glides will
LOWER the post.
Altri manuali per PHONE CUBE
1
Indice
Altri manuali Dauphin Attrezzature per ufficio


















