
4©2020 EMist®is a registered trademark of SanoTech 360, LLC. All rights reserved.
EMist-00054-20 - Ver. 082020
2. Initial Inspection & Set Up - Before You Use
Charge the battery rst:
1. Plug cord into AC adapter.
2. Plug AC adapter cable into Smart Battery Charger.
3. Plug AC adapter into 120v wall outlet.
4. Install battery into smart charger.
5. Reference power indicator (4 bars = full charge).
With the application power pack battery slots facing
you, remove battery covers by pinching the triangle.
Install battery with tab facing left.
Gently push battery to seat.
Replace battery cover.
Depress the power button to verify power on the
power pack (LED will blink continuously).
a)
b)
c)
d)
e)
f)
With grounding strap attached and the tank installed,
push/ip the toggle power switch down to turn the
machine on.
The green LED on the applicator will light up green for
power on.
Once the applicator trigger switch is depressed, the
fan will turn on rst, followed by liquid spray.
The yellow LED illuminating signies that the high
voltage power supply is charging the liquid droplets.
Once the applicator is released, the liquid will stop,
and the fan will turn o after slight hesitation to ensure
the liquid is cleared from inside the applicator.
To turn the system o push/ip toggle switch up to
turn o the system.
a)
b)
c)
d)
e)
f)
Identify the white or brown portion of the grounding
strap ring and install placing the white or brown
portion to the bottom of the ball of your shoe.
Place the elastic strap around heel. This is adjustable
if needed.
Snap the button to the bottom of the power pack.
a)
b)
c)
1. Install Battery (procedure same for both
battery slots):
Put the harness on the power pack.
Put the power pack on like you would a backpack and
adjust the straps to t comfortably.
a)
b)
6. Power Pack Harness Strap
Adjustments (optional):
While gently depressing tank lid/handle, rotate
counter-clockwise about 1/4 turn. Once disengaged,
it will pop up slightly.
Lift liquid tank out of power pack.
a)
b)
2. Liquid Tank Removal:
For initial set up/test, ll the liquid tank 1/3 full with
water.
Gently place the liquid tank in the power pack.
Slightly rotate clockwise about 1/4 turn while
depressing tank until you feel resistance. Handle of
tank should line up with placard on the power pack.
a)
b)
c)
3. Liquid Tank Insertion:
Raise adjustable clamp, loosening the two knobs and
positioning as desired then re-tightening the knobs.
Put the clamp over the hand grip of the power pack
keeping the electro-uid cable out of the way. This
secures the pack in place.
Use the applicator holster when system is not in use.
a)
b)
c)
4. Pull Cart Installation (optional):
5. Grounding Strap Installation:
7. Power Pack and Applicator Function Check:
Note: Over time, the tank connector may need
adjusting to align with placard.