
1www.enelx.com
Phone: +1-844-584-2329
TRI125.INS.036.3
Important safety instructions
This manual contains important
instructions for the JuicePump electric
vehicle fast charger.
Read the installation and operating
instructions before installing and
commissioning the equipment.
These instructions must be followed
during installation, operation, and
maintenance of the unit.
CAUTION
The JuicePump fast charger user unit
must be installed and serviced only by
To achieve EMC compliance, the chassis
of the JuicePump user unit must be
bonded to Earth locally at the charger.
Grounding instructions
This unit must be connected to a
grounded, metal, permanent wiring
system. An equipment-grounding conduc-
tor must be run with circuit
conductors and connected to
equipment-grounding terminal or lead on
the electric vehicle charger.
Connections to the battery charger shall
comply with all local codes and
ordinances.
Observe all pertinent national,
regional, and local safety laws and
regulations when installing and
commissioning the JuicePump fast
charger.
Identifying symbols
CRITICAL
CAUTION
RISK OF ELECTRIC SHOCK
Equipment Grounding
Conductor Symbol
ø Phase Symbol
Alternating Current Supply
Symbol
Wiring
Power and Protective Earth (PE) Conduc-
section), V90 class, rated to operate at
90°C.
The manufacturer recommends the use of
copper cables. Refer to the TRI125.
INS.016 JuicePump RT 175-S Piping and
Cabling-
tions.
Take care to observe local regulations
same conduit, including the ethernet
link if used. In general, all conductors
occupying the same conduit shall have
an insulation rating equal to at least the
conductor within the conduit.
SAVE THESE INSTRUCTIONS