
EQ-99 Manager User’s Manual · Page 5
Installation of the Controller
The EQ-99 Manager uses a switching power supply which supports 100-
240VAC, 50/60Hz operation, so there is no need for AC voltage selection.
1. Unpack the EQ-99 Manager and all cables.
2. If you have not done so already, unpack the EQ-99 LDLS system and
setup according to the Model EQ-99 LDLS Operation and Maintenance
Manual, which has specific instructions on unpacking and connecting
the EQ-99 Lamp House to the EQ-99 Power Supply Controller.
3. For users of existing LDLS systems:
a. Unplug any 12VDC power supply currently being used to
power the controller. The EQ-99 Manager will provide all
necessary power.
b. If your system is equipped with the EQ-99-RC Remote Control
Module, unplug it. The I/O cable used with the EQ-99-RC can
be used with the EQ-99 Manager, or you can use the HD15
cable supplied with the EQ-99 Manager.
4. Connect the DC power cable.
This has the 2-pin 2W2 connector
on one end and the 4-pin DIN
connector on the other.
5. Connect the I/O cable. This has a
HD15 male connector on each
end. If you were previously using
the EQ-99-RC Remote Control
Module, the cable for that module
can also be used.
6. Connect the interlock. The system ships with an
interlock plug already pre-shorted (a wire
connecting the two pins), however, if you have an
interlock system, remove the wire and connect
your interlock into it. Insert the plug into the
interlock socket.
7. Optional: if you have purchased a shutter, see Installing the Shutter,
below, for shutter installation instructions.