Component Check
• Make sure that you have everything you need to complete the installation.
• Before installation, make sure to complete a mock installation to test your lights and turn them on to make sure all components
are working correctly.
• Do not exceed the maximum run length of your UltraBright™ Valor LED strip light, as this may cause voltage drop
and unwanted effects.
• Make sure that all components are compatible.
1. Mock Installation
• Before cutting the LED strip light, or installing permanently, make sure to complete a mock installation to test your lights.
• It is important that you have a clear vision of your project and know what you want the end result to look like. Plan where you
want to install your driver and dimmer. Lay out all the components in the correct area.
• Connect your LED Strip Light to your dimmer and power supply. It is very important to do this before cutting your strips or
installing them.
• Turn on your lights and check to see if everything is working properly.
The strips should light up after connecting them to your dimmer and power supply. If they do not, please check your
connections and make sure the polarity matches all the way through from the power supply to the LED strip (positive to
positive, negative to negative).
Before installing your lights, check to see if the brightness level and color temperature you chose for your project look the way
you envisioned. You will be ready to proceed with the installation after testing your lights and components.
2. Troubleshoot If Needed
Installation Instructions
Turn the power off at the circuit breaker to avoid any possible injury.
3. Turn Power Off at Circuit Breaker
LED Driver Front caps
(included with the
LED Strip Lights)
End caps
(included with the
LED Strip Lights)
Outdoor IP65 Grip
Connectors for Single
Color LED Strip Lights
Outdoor (IP67) UltraBright™
Valor Premier Diffusion
Series LED Strip Lights
02
UltraBright™ Valor Premier Diffusion Series LED Strip Light Installation Guide