GOALRILLA B3333W Manuale utente

1. Read this manual carefully before starting assembly. Read each step completely before beginning
each step.
2. Some smaller parts may be shipped inside larger parts. Check inside all parts and cartons
before assembling or ordering parts.
3. Tomake assembly of your basketball system easier, use the Hardware Identifier on page 3
and 4 to identify and sort all fasteners. Check all cartons for kits. All hardware is not
located in one kit.
4. Do not tighten hardware until instructed to do so. If hardware is tightened too soon, mounting
holes may not align and parts may not easily fit together. Leave locknuts slightly loose until you are
instructed to tighten them.
O W N E R ' S M A N U A L
MODEL NO.
CV54
BASKETBALL SYSTEM
Please Do Not Return This Product To The Store!
®
Contact Escalade Sports customer service department at:
Phone: 1-888-USA-GOAL Toll Free !
Fax: 1-866-873-3536 Toll Free !
E-mail: [email protected]
Mailing Address:
Escalade Sports
PO Box 889
Evansville, IN 47706
Please visit our World Wide Web site at: www.G oalrilla.com
ON-LINE TROUBLE SHOOTING TECHNICAL ASSISTANCE
ON-LINE PARTS REQUESTS FREQUENTLY ASKED QUESTIONS
ADDITIONAL ESCALADE® SPORTS PRODUCT INFORMATION
2L-7248-03
Escalade® Sports products may be manufactured and/or licensed under the following patents.
6419596, 6179733, 5919102, 5071120, 4798381, 4424968, D326128
Additional patents may be pending. One or more of the listed patents and/or pending patents may cover specific product. 2018 Escalade Sports
5.
Save this instruction and your proof of purchase (receipt) in the event that the manufacturer
6.
An electric screwdriver is helpful in assembly. However, please set at low torque and use caution
because you could overtighten the hardware and strip the screws.
B3333W
has to be contacted for replacement parts.

2

HARDWARE IDENTIFIER
3/4” OD x 5-11/16
Pivot Tube (1 Piece)
14
14
77
1/2” Split
Lock Washer
(2 Pieces)
18
-13 x 1”
Hex Bolt
(2 Pieces)
19
Flat Washer
(2 Pieces)
3
/
12”
/
12”
Pull Pin
(1 Piece)
41
Hardware located in 4A-7081-00 box
5
1/2”X 1-1/4” Dia. Plastic-Washer
(4 Pieces)
(1 Piece)
Hex Bolt
1/2”-13 x 9”
1/2”-13 x 9”
Hex Bolt
(1 Piece)
51
14mm ID X 28mm OD Dia. - Washer
(8 Pieces)
5/8” Thread
Protector
(4 Pieces)
34
Hardware located in Anchor kit box
5/8” Flat Washer (Thick)
(8 Pieces)
37
1/2”-13
Nylon Locknut (Thin)
(10 Pieces)
4
3

HARDWARE IDENTIFIER
Two way Step Bushing
(2 pieces)
24
3/8”-16 X 1-1/4”
Hex Bolt
(4 Pieces)
25
Hardware required for rim assembly
24
1/2”-13 X 1 3/4
Hex Bolt
(2 Pieces)
(4 pieces)
3/8” X 19mm Flat Washer
12
#10 X 1 3/4” Phillips
Hex Head Self
Tapping Screw
(6 pieces)
88
(3 Piece)
Hex Bolt
1/2”-13 x 10”
1/2”-13 x 10”
Hex Bolt
(3 Piece)
Board Bushing
(2 pieces)
50
3
Flat Washer
(12 Pieces)
/
12”
5
1/2”X 1-1/4” Dia. Plastic-Washer
(18 Pieces)
1/2”-13 X 2 1/4
Hex Bolt
(4 Pieces)
(8 pieces)
3/8” X 19mm Flat Washer
4

INSTALLATION TIMELINE
1. Prior to anchor system and goal assembly, call utility services for location of underground utility lines before you dig.
2. Vertical main post assembly is a two part process.
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)
Before digging hole for anchor system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.
PART 1
Day 1. Complete Anchor System Installation Instructions.
(Below)
Day 2-4. Allow concrete to cure.
PART 2
Day 5. Complete GoalrillaTM assembly instructions. (Requires
four adults)
Figure 2
2. Assemble anchor system as follows: Thread nut (#35) to bottom
of threads on anchor bolt (#39) insert threads of anchor bolt
(#39) through hole on anchor plate (#38) and secure with nut
(#35). Repeat this step for the remaining
anchor bolts. See
Figure 2. Note:
Each leg of
anchor bolts
should face the
anchor bolt to the
right. See Detail
A.
1. Determine the location of the anchor
system. The proper location is as close to
the court without making contact, as
shown in Figure 1. This,
however,is a general rule.
If you need to locate the
anchor system in a location other than
this, use the following dimensions as a
guide.
Note: For best results with less vibration, anchor system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.
Overhang when adjusted to 10 ft. = 31 1/2”
THESE NUTS
USED FOR
LEVELING
OVERHANG
18 INCH
MINIMUM
REAR
CLEARANCE
REQUIRED
Note: When digging hole, if you hit rock
and cannot dig through contact a contractor.
Items needed for Anchor Installation (not included)
11 - 80 lb. bags of concrete (2-3 extra recommended)
1 - post hole digger (optional)
1 - 15/16” open end wrench
1 - 15/16” socket and ratchet (optional)
1 - wheel barrow
1 - garden hose
1 - level
1 - tape measure
1 - concrete form (see note after step 2)
Figure 1
Note: Using a concrete form for the top 4" of the concrete
is recommended. Cardboard forms can be purchased at
some hardware and home stores or a wooden form can
be constructed out of 2 x 4's.
3. Mix and pour concrete into hole. Follow instructions on
concrete bag. Stop about 18" below court level.
4. Insert four reinforcement bars (Key #40) into concrete 8"
apart creating a square in center on hole.
5. Place form in desired location and finish pouring concrete
up to court level.
6. Push anchor system into concrete and agitate to work out
voids in concrete. Immediately use a level to level and square
anchor plate to playing surface. Clean off any concrete that
may be on exposed threads.
Note: The bottom four nuts will be forever embedded in
concrete. The top four nuts remain on bolts and are
used for leveling. (See Step 11 on page 9)
Note: Failure to dig and fill hole as instructed will result
in increased system vibration.
Let concrete cure for a MINIMUM of 72 hours.
(Key #40)
Rebar
*Tip: It is always a good idea to purchase one or two
extra bags of concrete, just in case you need them. If
extra bags are not used you can return them to the store.
5

GOALRILLATM ASSEMBLY INSTRUCTIONS (Day 5)
Figure 3
Figure 3
Figure 3
26
24
26
48
26
2
2
48
25
25
26
TOOLS REQUIRED FOR THE FOLLOWING STEPS
1 - 15/16" open end wrench
1 - 15/16” socket and ratchet (optional)
1 - Level
1 - Tape Measure
1 - Rubber Mallet
1 - Set of Padded Saw Horses
1 - 9/16” Deep Well Socket & Ratchet
1 - 3/4” Socket & Ratchet
1 - 3/4” Open end Wrench
1 - 5-16” Socket Driver
1 - Pair of Safety Glasses
1 - Ladder
1 - Phillips Screwdriver
Figure 4
5
5
15
3
3
18
18
19
19
2
46
13
14
1 - Cordless Drill & 9/64” Drill Bit
6
NOTE: It may be necessary to use a rubber mallet
to tap in Pivot Tube.
3. Lay Pole (#2) on its side on two padded saw horses. Attach
Actuator (#16) to Pole (#2) using one bolt (#19), split
lockwasher (#18), washer (#3) and two plastic washers (#5)
to thread into each side of Actuator. See Figure 4. Tighten
bolts tight.
4.
NOTE: It is important for the installer to understand the
necessity of the Plastic washers (#5) provided. These
washers adequately space painted parts at all pivot points.
Neglecting the use of these washers will result in rusted
parts.
If Pole Cap (#46) is not already pre-installed insert it
into the top of the Pole (#2). It may be necessary to
use a rubber mallet to tap cap in.
1. Attach Post Brackets (#48) to outside of brackets on back
of Post Assembly (#2). Secure with two Hex Head Bolts (#25),
four Flat Head Washers (#26) and two Locknuts (#24) in
each Bracket (#48). See Figure 3.
2. If not already pre-assembled, slide Plastic Actuator Sleeve
(#15) over Steel Actuator (#16) and place Actuator Cap (#13)
on top. Align holes in all 3 parts and slide Pivot Tube
(#14) through holes in Actuator Cap (#13) Plastic Actuator
Sleeve (#15) and Steel Actuator (#16) until equal amounts
stick out through both sides of actuator. See Figure 4.

NOTE: It is important for the installer to understand the
necessity of the Plastic washers (#5) provided. These
washers adequately space painted parts at all pivot points.
Neglecting the use of these washers will result in rusted
parts.
NOTE: All board arms are made of rectangular tubing.
Tightening hardware too tight may damage tubing and
make adjustment of system difficult.
Attach lower arm (#11) to Pole (#2), as shown in Figure 5,
using a bolt (#8), two flatwashers (#3), four plastic washers
(#5) and thin locknut (#4).
Note: make sure "Goalrilla lettering is right side up. Do
NOT tighten bolt (#8) at this time.
5.
Secure Actuator (#16) to Lower Arm (#11) using one bolt
(#8), two flatwashers (#3), four plastic washers (#5) and one
snug but, do not over tighten. Board Arms must pivot freely.
If the four Tube Plugs (#10) are not already installed insert
them into open ends of Lower Arm (#11). It may be necessary
to use a rubber mallet to tap plug in.
6.
7.
Figure 5
5
Figure 6
4
4
thin locknut (#4). See Figure 6. Tighten both bolts (#8)
7

Note: Tighten bolts snug but, do not over tighten. Board
Arms must pivot freely.
8.
9.
Attach Upper Arms (#6L & 6R) to pole (#2), as shown in F igure 7. Using a
bolt (#7), two flatwashers (#3), four plastic washers (#5) and hex nut (#4).
If the two Tube Plugs (#9) are not already installed insert them into open ends of
Upper Arms (#6L and 6R). It may be necessary to use a rubber mallet to tap plug in.
Figure 7
6R
6L
Drain Holes must be
on bottom Side
Drain Holes must be
on bottom Side
8

Figure 8
10.
NOTE: Do not remove the nuts #35 you installed in step 2 (pg. 5).
Locate hardware needed to mount pole to anchor bolts. You will need, eight flat washers
(#37), four lock washers (#36), four hex nuts (#35) and four thread protectors (#34).
NOTE:
If basketball system needs to be
moved, do not try to salvage
caps. Caps (#34) will be tight,
please remove with plyers and
discard. New caps will come in
new anchor system.
NOTE:
If (#34) caps are missing for any
reason please call customer service.
DETAIL A
PLACING THE POST ON THE ANCHOR SYSTEM
REQUIRES AT LEAST FOUR CAPABLE ADULTS.
POLE WILL WANT TO LEAN WHILE ATTEMPTING TO
STAND IT UP ON ANCHOR BOLTS.
Push on Thread Protector Cap (#34) until it is securely in place. Cap may be tight, push hard but DO NOT hit with
a hammer! See Figure 8 and Detail A.
Put a flat washer (#37) on each anchor bolt. Lift post onto anchor system and secure with one flat washer (#37),
one lock washer (#36) and one hex nut (#35) for each anchor bolt. Tighten Fasteners finger tight, leave loose
enough to level pole. Place a level on pole and adjust bottom nuts #35 until pole is level (left to right and front to
back). Tighten top four hex nuts #35 tight. See Figure 8.
NOTE:
Bottom nuts #35 can be used for
leveling system. See Step 11.
11.
12.
34
34
35
36
37
37
35
(Bottom Nut)
Let concrete cure for a MINIMUM of 72 hours.
9

Slide Actuator Handle (#42) onto shaft on the back of
Actuator (#16). Line up hole in shaft with hole in Actuator
Handle and insert Pull Pin (#41) to secure.
T
oaid in the assembly of the backboard lower the lower board
arm (#11), by turning the Actuator Crank, until the lower
arm makes contact with the Safety Stop.
13.
14.
Figure 9
10
Questo manuale è adatto per i seguenti modelli
1
Indice
Altri manuali GOALRILLA Accessori





















