4 OM-NEB/1
The Groen NEB/1 steam boiler generates low pressure steam for use with HyPlus
cabinet-mounted steamers and steam jacketed kettles.
The boiler is housed in a stainless steel cabinet. Various combinations of steam
operated kettles and steamers can be mounted on the top. The boiler is small enough
to fit in a 24-1/8” (613 mm) wide by 34-3/16” (868 mm) deep by 29-3/16” (741 mm)
tall (maximum) cabinet.
The boiler is constructed of 1/4” thick steel, which is certified by the American Society
of Mechanical Engineers (ASME) for pressure vessels. All welds are hydrostatically
tested.
The boiler is also equipped with all required instruments, fittings, and controls.
Heating elements with low watt density ensure longer life for the unit. The boiler
is available for three phase 60 Hertz service in the following voltage and power
combinations: * A single phase configuration is available in the 24KW combinations.
208 Volts 240 Volts 480 Volts
24 Kilowatt 24 Kilowatt 24 Kilowatt
36 Kilowatt 36 Kilowatt 36 Kilowatt
48 Kilowatt 48 Kilowatt 48 Kilowatt
SEE OM-HY-6CAV FOR STEAMER CAVITY OPERATION AND/OR OM-TD FOR KETTLE
OPERATION.
Equipment Description
The NEB-1 Boiler may be used for a variety
of applications in a variety of combinations.
The unit will arrive completely assembled, wrapped in protective plastic and in a heavy-
duty carton on a skid. Immediately on receipt examine the carton and unit for shipping
damage. Report any damage or incorrect shipments to the delivery agent.
Write down the model number, serial number and installation date of your unit, and keep
this information for future reference. Space for these entries is provided at the top of the
Service Log on Page 20 of this manual.
When installation is to start, cut the
straps and lift the unit straight up off
the skid.
Inspection & Unpacking
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT.
CAUTION
UNIT WEIGHS 620 LB (282 KG) OR MORE.
FOR SAFE HANDLING OBTAIN HELP, OR USE
MATERIALS HANDLING EQUIPMENT (FORK
LIFT, DOLLY OR PALLET JACK) TO REMOVE
THE UNIT FROM THE SKID AND MOVE IT TO
ITS PLACE OF INSTALLATION.
Unit will arrive in a heavy carton,
mounted on a skid.
Beneath the heavy carton, the unit
will be wrapped in protective
plastic on a heavy skid.