
Betriebsanleitung_firestar_18-40_Lambda_Englisch_V1.6 3
TABLE OF CONTENT
1Safety notes................................... 4
1.1 Warning notes ...................................... 5
1.2 Installation ............................................ 5
1.3 Operation and maintenance................6
1.3.1 General notes.........................................6
1.3.2 Operation................................................6
1.3.3 Maintenance...........................................6
2Fuels............................................... 7
2.1 Suitable fuels........................................7
2.2 Not suitable fuels .................................7
3Starting up a cold system............. 8
4Handling of the heating system ... 9
4.1 Sealing the boiler ................................. 9
4.2 Operation with low performance
decrease................................................ 9
4.3 Overheating of the boiler.....................9
4.4 Sweating of the boiler.......................... 9
4.5 Taking out of operation ....................... 9
5Boiler operation........................... 10
5.1 Preparation for heating up ................10
5.2 Heating up...........................................10
5.3 Energy absorption capacity / STL ....11
5.4 Re-heating...........................................13
6Maintenance and cleaning.......... 13
6.1 De-ashing and cleaning general.......13
6.2 Cleaning of the heat recovery areas
(manual) ..............................................13
6.3 Cleaning of the combustion chamber14
6.4 Cleaning the flue pipe........................15
6.5 Filling shaft –Filling shaft door........15
6.6 Checking the heat exchanger...........15
6.7 Checking the water level for the
heating unit.........................................15
6.8 Keeping the boiler room clean..........15
7Fault-free operation..................... 15
8Boiler status ................................ 16
8.1 Unit off.................................................16
8.2 Burning phase ....................................16
8.3 High running phase............................16
8.4 Control phase .....................................16
8.5 Ready...................................................16
8.6 New start-up........................................16
8.7 Re-heating...........................................16
8.8 Chimney sweeper...............................16
8.9 Lambda calibration (password
protected)............................................17
8.9.1 Flue temperature control ......................17
8.9.2 Lambda control.....................................17
8.9.3 Control curve ........................................17
9Description of the menu
navigation and adjustment values18
9.1 Main menu...........................................18
9.1.1 Structure...............................................18
9.1.2 Display..................................................18
9.1.3 Modify value .........................................18
9.1.4 Code entry (only Service).....................19
9.2 Status menu (S) ..................................20
9.3 Parameter menu (P)............................22
9.4 Aggregate-Test Output (A) ................24
9.5 Aggregate-Test Input (E)....................25
10 Fault reports and their correction26
11 Emission measurement .............. 30
11.1 Measurement notes............................30
11.2 Measurement preparation..................30
11.3 Establish measurement condition
(continous operating state)...............30
11.4 Measurement performance................30
12 EC-Declaration of conformity..... 31
13 Index directory............................. 32
14 Notes............................................ 33