
How to Use
7
Calculating Air Conditioner Operation Ratio
(1) The following data (calculation result) will be stored in "/centralstation/anbun/DriveRatio/Result/yyyymm".
• DAYS_yyyymm.csv: operation ratio of EHP by each day
• UNITS_yyyymmdd.csv: operation ratio of EHP by each air conditioner (for each day)
• DAYS_GHP_yyyy.mm.csv: operation ratio of GHP by each day
• UNITS_GHP_yyyymmdd.csv: operation ratio of GHP by each air conditioner (for each day)
* yyyy, mm and dd indicate year, month and day, respectively.
(2) The following data (calculation result) will be stored in "centralstation/anbun/DriveRatio/Result/yyyymm/dd".
• HOURS_yyyymmdd.csv: operation ratio of EHP by each hour
• UNITS_yyyymmdd_hh.csv: operation ratio of EHP by each air conditioner (for each hour)
• HOURS_GHP_yyyymmdd.csv: operation ratio of GHP by each hour
• UNITS_GHP_yyyymmdd_hh.csv: operation ratio of GHP by each air conditioner (for each hour)
* yyyy, mm, dd and hh indicate year, month, day and hour, respectively.
NOTE:
● Ratio of electricity usage and Gas usage are calculated by either corresponding EHP or GHP.
● The 4 les above will always be generated even if all the cycle adapts either EHP or GHP only.
● Facility units only supports apportionment of electricity. Operation ratio of facility units will be 0%
when applied air conditioner operation ratio calculation.
(3) Reference "Operation ratio of EHP by each day" (DAYS_yyyymm.csv)
This is a csv le contains the result of calculation of operation ratio in a day regarding maximum 31 days as
100%.
(a) Date YYYY, MM, DD 4 digits for year, 2 digits each for
month and day
(b) Accumulated
load on outdoor
units
In Mode I::= Grand total of thermo on time x capacity of
each indoor unit.
12 digits
In Mode II::= Accumulated electricity for operation for
each outdoor unit.
12 digits
(c) A day/Elapsed
days
Current date / total elapsed days. 7 digits, 100% = 1000000
Result of air conditioner operation ratio calculation will be output to le.
(a)
Date
↓
(b)
Accumulated
load on
outdoor units
↓
(c)
A day/
Elapsed
days
↓
Date 1 Date 2 Date 3 Date 4 Date 5 Date 30 Date 31
1Calculation Result Reference