Hussmann Q3-DV-4 Manuale utente

/SPECIALTY
MERCHANDISER
Q3
USER MANUAL
0619
DELI VERTICAL
Q3 -Q3-DV-4VercalCase
-Q3-DV-5VercalCase
-Q3-DV-6VercalCase
-Q3-DV-8VercalCase
-Q3-DV-10VercalCase
-Q3-DV-12VercalCase
-Q3-DV-22.5IS/OSVercalCase
-Q3-DV-45IS/OSVercalCase Remote

2
DOE 2012
Energy Eciency
Compliant
Hussmann refrigerated merchandisers congured for sale f
or use in the United States
meet or surpass the requirements of the DOE 2012 energy eciency standards.
Notice 3
General Information 4
Case Sections 5
Installation 6
Unloading
Receiving Case 6
Snapping Chalk Lines 6
Placement 7
Lifting / Panels
Q3DV Lifting and Transport Instructions 8
Front Body Panel Install 9
Fasten Front Body Panel Install 9
Fasten Rear Body Panel Install 9
Leveling
Leveler Adjustment 10
Shim The Case 10
Joining
Parts List 11
Q3-DV Canopy Adjustment 12
Joining Preparation 15
Refrigeration 18
Piping
Refrigerant 18
Refrigerant piping 18
Line Sizing 18
Oil Traps 18
Refrigeration Spec Sheets 19
Table of Contents
Electrical 20
Electrical Info
Merchandiser Electrical Data 20
Electrical Connections 20
Field Wiring 20
IdenticationofWiring 20
Remove Rear Raceway 21
Electrical Conduit (Electrical Box) 21
Electrical Wiring Diagram 22
User Information 33
General
Start Up 33
Load Limits 33
Maintenance
Case Cleaning 34
Exterior Surfaces 34
Interior Surfaces 34
Troubleshooting 36

3
WARNING
1. DO NOT overload or stand over top of case. Glass breakage may occur if
precautions are disregarded.
*Broken glass can cause lacerations, cuts, and puncture wounds which
may result in severed arteries or tendons, amputations, eye injuries, or
exposure to disease.
Notice

4
CaseDescripon:
Description: Refrigerated vertical Deli/Bakery Merchandiser
Shipping Damage: All equipment should be thoroughly examined for shipping damage before and
during unloading. This equipment has been carefully inspected at our factory and the carrier has
assumed responsibility for safe arrival. If damaged, either apparent or concealed, claim must be
made to the carrier Immediately.
Apparent Loss or Damage: If there is an obvious loss or damage, it must be noted on the freight bill
or express receipt and signed by the carrier’s agent; otherwise, carrier may refuse claim. The carrier
will supply necessary claim forms.
Concealed Loss or Damage: When loss or damage is not apparent until after all equipment is
uncrated, a claim for concealed damage is made. Make request in writing to carrier for inspection
within 15 days, and retain all packaging. The carrier will supply inspection report and required claim
forms.
Shortages: Check your shipment for any possible shortages of material. If a shortage should exist
and is found to be the responsibility of Hussmann Chino, notify Hussmann Chino. If such a shortage
involves the carrier, notify the carrier immediately, and request an inspection. Hussmann Chino will
acknowledge shortages within ten days from receipt of equipment.
Hussmann Chino Product Control: The serial number and shipping date of all equipment has been
recordedinHussmann’slesforwarrantyandreplacementpartpurposes.Allcorrespondence
pertaining to warranty or parts ordering must include the serial number of each piece of equipment
involved, in order to provide the customer with the correct parts.
Location/Store Conditions: The Q3-DV refrigerated merchandiser has been designed for use only
in air conditioned stores where temperature and humidity are maintained at 80°F and 55% relative
humidity or 75°F and 55% relative humidity. DO NOT allow air conditioning, electric fans, ovens, open
doors or windows (etc.) to create air currents around the merchandiser, as this will impair its correct
operation.
This equipment is to be installed
to comply with the applicable
NEC, Federal, State , and Local
Plumbing and Construction
Code having jurisdiction.
AT TENTION
INSTALLER
/CHINO
A publication of HUSSMANN®Chino
13770 Ramona Avenue • Chino, California 91710
(909) 628-8942 FAX
(909) 590-4910
(800) 592-2060
Keep this booklet with the case at all times for future reference.
General Information

5
24 3/4
(629)
26
1/2
(673)
23
1/8
(587)
253/4
(654)
27
7/8 (708)
52
1/4
(1327)
12(305)
14(356)
227/8
(581)
153/8
(391)
10 3/8
(264) 251/8
(638) 57/8
(149)
413/8
(1051)
Q3-DV Multi-Deck Service Deli Case
8
(203)
Elec Drain Refrig
5
(127) 6 1/8
(156)
End Panels
11/8
(29)
C
L
417/8
(1064)
281/8
(714)
221/8
(562) 251/8
(638)
48
(1219) 72
(1829) 96
(2438) 144
(3658)
Q3-DV, BV
customer side
57/8
(149)
10 3/8
(264)
Case Sections

6
Installation
NOTICE
Do NOT remove Foam Blocks from shelves
and glass until the merchandisers are
positioned for installation. Shelves or
merchandising glass may be damaged.
Wrapped Top
and Shelves
Foam Blocks
in place
Warning
Labels
Loose
Items
Case is to arrive at store as was shipped form
factory. See reference above for proper shipment
referencing. (not actual case)
Receiving Case
Upon receiving your new Hussmann Case all
equipment should be thoroughly examined for
shipping damage before and during unloading.
This equipment has been carefully inspected at
our factory. Any claim for loss or damage must
be made to the carrier. The carrier will provide
any necessary inspection reports/ or claim form.
If there is obvious loss or damage, it must be
noted on the freight bill or express receipt and
signed by the carrier’s agent; otherwise carrier
may refuse claim.
Snapping Chalk Lines
Preparepermanentpositioningbymarkingoors
with Chalk snap lines where cases are to be
located. Chalk lines are to run along the base or
legs of cases.

7
Placement
Important: See lifting instructions to properly lift
case when being placed on dollies or permanent
location. (See page 8 for Lifting Instructions.)
First remove Blocks and L Brackets around the
case from pallet.
Remove Block
and L bracket
Proceedbysettingforkliftsunderspeciedloca-
tions as instructed in the Lifting Instructions
(pg. 8.) Be careful not to damage drains or near
components when placing forks underneath
case. A spotter is mandatory to ensure no dam-
age is caused to the case. Lift case and replace
with dollies, place near or in permanent location.
Inser
t Forks
Underneath
Deck
Movethextureascloseaspossibletoitsper-
manent location and then remove all packaging
and preparing to remove off Skid. Remove all
separately packed accessories such as kits, and
Installation (cont’d)
panels. Check for damage before discarding
packaging.
In the case a fork lift truck is not available follow
the demonstration below to properly lift case us-
ing a Johnson Bar (J-Bar) to place on dollies to
trafcfromstartpointtoplacementarea.
Place J-Bar underneath base of merchandiser
to gain leverage, once lifted place Dollie under-
neathrstendandslowlylowerontodollieen-
suring merchandiser is placed on stable location.
Proceed to opposite end and repeat.

8
Q3DV Lifting and Transport
Instructions
1. The Q3-DV can be lifted by a forklift at typical
lifting points.
Forklift Points
(Underneathe
Deck)
J-Bar Lift Points
(Underneathe
Base Structure)
J-Bar Lift Points
(Underneathe
Base Structure)
WARNING
Improper placement of forks may damage
drainage piping. Use a spotter when placing
forks. Make sure that piping will not be dam-
aged. Use J-Bars or Jacks if forks cannot be
used safely
2. Ensure lower body panels are removed be-
fore lifting with a forklift. Serious damage will
occur if the body panels are not removed.
3. Make sure that fork spacing and width will not
damage drain or come in contact with piping,
or electrical lines
4. Be sure that the forks are long enough to
support beyond the center of the case but not
damage near components. Check for proper
balance before moving. A minimum fork
length of 36” is recommended for 68” wide
cases
Installation (cont’d)
5. The Q3-DV merchandiser can be raised at
one end underneath the deck with a forklift to
allow the placement of rollers or dollies.
6. Evenly support the entire base structure on
rollers or dollies before attempting to move.
Each Base Leg must have its own dollie to
properly support the case.
Lifting Points are typical and dependent upon
size of case and refrigeration application, drain-
agecongurationswillcallforaltercationsin
Lifting Zones.
Belowarethefollowingdrainagecongurations
and lifting should be altered to the expected
model.
Q3 DV Drain Location
Drain

9
Installation (cont’d)
Fasten Rear Body Panel Install
(1) Align pre drilled holes to base of case
(2) Secure top and bottom of rear panel using
fasteners as shown below.
Allow front and rear body panels to slide down
resting on support hooks. 2.Place L Bracket
along the underside of deck to hold body panel
top in place against base wall of case.
Front Body Panel Install
A Phillips Screw Driver/Bit will be needed to
install body panels.
To begin Bottom panel assembly place panel A
along side the base of the case and lower panel
on to support hooks along the bottom of the base
(See illustration below for details).
A
Detail A
Resting Hooks
Panel A
P
anel B
Fasten Front Body Panel Install
(1) Secure Panel A with top fasteners only.
(2) Overlay Panel B to bottom of Panel A as
shown in illustration below
*Note Panel B will be attached freely with no pre
drilled holes.
1
1
2
2
Panel A
Panel B

10
Installation (cont’d)
Leveler Adjustment
Position the case at the highest point. Set a long
magnetized level (4ft [1220 mm] or more) on
either underneath the deck or on top of the case.
Ensure to level case from front to back and side
to side.
Level
(4 ft[1220mm])
Shim The Case
Use shims at each corner of the case to level
out any discrepancies in order to optimize case
performance and proper drainage.
Note: Shims are not Factory supplied. Contractor
should carry available components. Metal Shims
are recommended for use to eliminate any
deterioration from shims over time.
Note:Toavoidremovingconcreteooring,begin
line up levelling from the Highest point of the
storeoor.
NOTICE
Longer length cases may require shims
along the center portion of the case to
maintain proper case performance and
drainage.
Shim
Questo manuale è adatto per i seguenti modelli
7
Indice

















