Boiler Setup
1) Check that the gas supply from the gas meter is turned ON
2) Switch on the electric supply to the boiler and controls and set the heating
controls to call for heat.
To Light The Boiler
Switch the user control knob fully anticlockwise to the standby position. Wait 5
seconds then turn the user control know clockwise to the temperature required. The
following sequence will occur:
1) The Mains (Green) LED will illuminated
continuously. If the green lamp flashes slowly
set your external controls to ON.
2) After about 15 seconds the module will
ignite and the Boiler On LED (Yellow) will
illuminate continuously.
3) The boiler will adjust the output to best
match the demands of the system. The
Modulation/Diagnostics LED's (Green) will
indicate the output of the boiler at any given
time.
The boiler is now running correctly and will
proceed to switch itself on and off as the
heating reaches its operating temperature.
If the Boiler On (Yellow) LED goes out and the Lockout (Red) light flashes, due to a
failure to ignite or an interruption to the gas supply, turn the User Control Knob to the
standby position (fully anticlockwise), wait for 10 seconds and turn the boiler on
again as described above in To Light The Boiler. If the boiler still fails to ignite after
five successive attempts contact your Installer or Service Engineer.
Precautions
Care must be taken at all times to ensure that no blockage or obstruction is
present in the condensate drainage line. In addition the air intake and flue
exhaust terminals of the appliance must be free of obstruction at all times.
Frost Protection
The Celsius 25 has an integral frost protection thermostat. However, care
should also be taken to ensure that any exposed pipework is adequately
insulated to prevent freezing.
Gas Leak or Fault
If you suspect a gas leak turn off the appliance immediately, turn off the gas
tap to the appliance and contact your local gas region without delay.
If you suspect a fault with the appliance it must not be used until the fault has
been corrected by a competent person.
In the unlikely event of a breakdown consult your Installer or Service Engineer
WD211/0/2000
Mains (Green)
Boiler On (Yellow)
Lockout (Red)
Water Flow (Red)
Modulation/Diagnostic
1 to 4 (Green)
User Control
Knob
BOILER
FASCIA
DISPLAY
(shown in "off" position)