Contents
Placement Methodology (Software) 3
Substation Placement Methodology 4
Air Terminal (Hardware) 5
Warranty and Disclaimer 6
Safety Guidelines for Installatiion 7
Checking Lightning Protection
Components Supplied 8
LPI Guardian Plus Installation 8
Recommended Installation Method 9
Installation of the Lightning Earth 13
Earth Enhancing Compounds 14
Bonding the Lightning Earth 15
Labelling 15
Installation of the HVSC Plus
Downconductor 15
Hauling the HVSC Plus
Downconductor 15
HVSC Plus Downconductor
Clearance Holes 16
Routing 17
Fixing the HVSC Plus Downconductor 19
Installation of Conventional
Downconductor 19
Equipotential Bonding 21
Installation of Guardian Plus GI
Terminal to Threaded Pipe 21
Termination of the HVSC Plus Lower End
23
Lower Termination of Conventional
Downconductor to the Lightning Earth 26
Upper Termination Instructions
UTERMKIT-MK3 (Heatshrink) for HVSC Plus
27
Termination of the HVSC Plus Upper End
27
Upper Termination Instructions for
UTERMKIT-MK3 (Heatshrink) 28
Termination of the HVSC Plus Lower End
32
Connection of Factory Pre-Terminated
HVSC Plus (Upper End) to Guardian Plus
32
Labelling 33
Masts 33
Guying 35
Preparation for Raising the Mast
into Position 36
Raising of the Mast 37
Lightning Strike Recorder (LSR1) 39
Certification 41
Operation and Maintenance 41
Testing the Guardian Plus Terminal 42
Testing the HVSC Plus Downconductor 42
Testing the Lightning Earth 43
Installation Notes 45