
3
Table of Contents
Section Page
1.0 Introduction………………………………………………………………………………………………………………………...5
2.0 Instrument Description………………………………………………………………………………………………………… 6
3.0 Specifications……………………………………………………………………………………………………………………..10
4.0 Safety……………………………………………………………………………………………………………………………….10
5.0 Setup
5.1. Initial Setup Instructions……………………………………………………………………………………………………………...10
5.2 Initially Po ering the PQ200……………………………………………………………………………….………………………..15
5.3 Setting the Date and Time…………………………………………………………………………………………………………...15
5.4 Entering Site and Filter Information……………………………………………………………………………………………….15
5.5 Initial Performance Checks……………………………………………………………………………………………………………15
6.0 Operation
6.1 Run the Sampler from Midnight to Midnight……………………………………………………………………….…………...17
6.2 Run the Sampler ith User-Defined Start/Stop Times……………………………………….………………………………18
6.3 While the PQ200 is Running…………………………………………………………………………………………………………..18
6.4 Temporary Halt Then Continue Sampling………………………………………………………………………………………..19
6.5 Ending a Run………………………………………………………………………………………………………………….……………20
6.6 Data Do nload Instructions…………………………………………………………………………………………………………..20
6.6.1 Data Do nload Using USB On-The-Go (OTG) Flash Drive…………………………………………………………20
6.6.2 PQ200 Job Controller Soft are for Windo s……………………………………………………………………………20
6.6.3 Data Do nload Using the PQ200 Menu………………………………………………………………………………….21
6.6.4 Data Do nload Using Serial Communication Commands………………………………………………………….21
7.0 Calibration
7.1 Flo Rate
7.1.1 Flo Rate Calibration…………………………………………………….……………………………………………………23
7.1.2 Verifying Flo Rate……………………………………………………….……………………………………………………24
7.1.3 Changing Flo Rate…………………………………………………………………….……………………………………..24
7.2 Temperature Probe
7.2.1 Verifying Temperature……………………………………………………………………………….……………………….25
7.2.2 Calibrating Temperature………………………………………………………………………………………….………….25
7.3 Barometric Pressure
7.3.1 Pressure Calibration and Verification……………………………………………………………………..………………26
7.4 Leak Tests
7.4.1 External Leak Test……………………………………………………………………………………………………………...26
7.4.2 Internal Leak Test…………………………………………………………………………………………………….………..27
8.0 Maintenance
8.1 Cleaning the Inlet, VSCC, and Do ntube…….…………………………………………………………………………………27
8.2 Rebuilding the Pump…. ………………………………………………………………………………………………………….......27
8.3 Updating Firm are………………………………………………………………………………………………………………………28
9.0 Troubleshooting………………………………………………………………………………………………………………..29
10.0 Warranty………………………………………………………………………………………………………………………….31
Appendix A Parts List and Blo -Out Figures………………………………………………………………………………32
Appendix B PQ200 Sampler Menu Tree…………………………………………………………………………………….47
Appendix C Filters and Weighing Procedure………………………………………………………………………………49
Appendix D Dip S itch Functions……………………………………………………………………………………………..51
Appendix E Use of the PQ200 as a PM
10
Designated Reference Sampler………………………………………54
Appendix F Solar Panel Po er Supply……………………………………………………………………………………….55
Appendix G Accessories…………………………………………………………………………………………………………..62
Appendix H PQ200 Job Controller Soft are……………………………………………………………………………….64
Appendix I Terminal Program Interface……………………………………………………………………………………67
Appendix J Very Sharp Cut Cyclone – VSCC – Instructions for Use and Maintenance…………………….68