
7
Industrial Steel Shelving
Make sure the unit is level. Drill a hole into the floor. Secure
the footplate to the floor using the anchors (not included)
To join 2 posts vertically, bolt a splice bracket to either side of the posts at the joint. When splicing back to back
units, only 1 more splice bracket is required.
Wood shelves (in one piece) are placed on the beams.
Steel shelves (usually multiple pieces) are placed on
the beams and screwed together.