Meyer Burger BS 820 Manuale utente

10002683-en-00
Band Saw BS 820
Manual

310002683-en-00
i
Table of Contents
1 Using the operating instructions ................................................................7
1.1 General .....................................................................................................7
1.2 Target group .............................................................................................8
1.3 Assessing the operating manual ................................................................8
2 Product description ...................................................................................9
2.1 Assemblies................................................................................................9
2.1.1 Machine ..................................................................................................10
2.1.1.1 Description..............................................................................................10
2.1.1.2 Machine assembly function .....................................................................12
2.1.2 Handling..................................................................................................13
2.1.2.1 Handling assembly function.....................................................................13
2.1.3 Crystal Gluing Station ..............................................................................14
2.1.3.1 Crystal gluing station assembly function ..................................................14
3 Safety......................................................................................................15
3.1 Safety information....................................................................................15
3.2 Intended use ...........................................................................................16
3.3 Dangers to life and limb and material values ............................................16
3.4 Faultless state of the machine .................................................................17
3.5 Organisational measures .........................................................................17
3.5.1 Safe and danger-conscious working .......................................................17
3.5.2 Safety and danger notes on the machine.................................................17
3.5.3 Changes to the machine .........................................................................17
3.5.4 Initial operation ........................................................................................17
3.5.5 Setup ......................................................................................................18
3.5.6 Maintenance and inspection....................................................................18

410002683-en-00BS 820 - Table of Contents
3.5.7 Decommissioning....................................................................................18
3.6 Personnel selection and qualification; principal duties ..............................18
3.6.1 Training ...................................................................................................18
3.6.2 Working on electrical equipment..............................................................18
3.7 Product specific hazards .........................................................................19
3.7.1 Saw band................................................................................................19
3.7.2 Control cabinet........................................................................................19
3.8 Safety installations Protection of personnel machinery .............................19
3.8.1 Cover ......................................................................................................20
3.8.2 Sliding door.............................................................................................21
3.8.3 Coolant monitoring..................................................................................22
3.8.4 Band drive speed monitoring...................................................................22
3.8.5 Standstill monitoring ................................................................................23
3.8.6 Safety clutch ...........................................................................................23
3.8.7 Band break monitoring ............................................................................23
3.8.8 Emergency stop ......................................................................................23
3.8.9 Coolant monitoring and adjustment.........................................................24
3.8.10 Motor cooling system ..............................................................................24
4 Product data ...........................................................................................25
4.1 Features ..................................................................................................25
4.2 Dimensions and weights..........................................................................27
4.3 Layout.....................................................................................................28
4.4 Connections............................................................................................29
4.4.1 Electrical connections..............................................................................29
4.4.2 Compressed air.......................................................................................29
4.4.3 Coolant supply ........................................................................................29
4.4.4 Coolant recirculation (waste)....................................................................29
4.4.5 Motor cooling system ..............................................................................30
4.4.6 Air exhaust ..............................................................................................30
4.4.7 Location of the various connections ........................................................30
4.4.8 Colour coding of the pipes ......................................................................31
4.5 Surroundings...........................................................................................31
4.5.1 Temperature of machine surroundings ....................................................31
4.5.2 Humidity of the machine surroundings.....................................................31
4.5.3 Location ..................................................................................................31
4.6 Emissions................................................................................................32
4.6.1 Noise levels .............................................................................................32
4.6.2 Used water..............................................................................................32
5 Display and operating controls ................................................................33
5.1 Operating panel.......................................................................................33
5.2 Signal column..........................................................................................34
5.3 Screen layout ..........................................................................................35
5.3.1 S keys .....................................................................................................35
5.3.2 F keys / Register .....................................................................................36
5.3.3 Toolbar....................................................................................................36
5.3.4 Password levels (PWL) ............................................................................38
5.3.5 Colours: Keys and displays of values.......................................................38
5.4 Confirmation switch.................................................................................39
5.4.1 Confirmation key .....................................................................................39
5.4.2 LED.........................................................................................................39
5.5 Hardware buttons ...................................................................................40
5.5.1 Beschreibung der Hardware-Tasten ........................................................41
5.6 Operation dressing device .......................................................................42
5.7 Starting and working with the application ................................................43
5.7.1 Login.......................................................................................................43
5.7.2 Configuration menu .................................................................................44
5.8 Loading, storing and deleting data...........................................................45
5.8.1 General ...................................................................................................45

10002683-en-00 5
5.8.2 “Storing data” action ...............................................................................46
5.8.3 “Loading data” action ..............................................................................47
5.8.4 “Deleting data” action..............................................................................47
6 Switching the machine on and off............................................................49
6.1 Switching on the machine and control system.........................................49
6.2 Switching off the machine and control system.........................................50
7 Setup ......................................................................................................51
7.1 Replacing the saw band ..........................................................................52
7.1.1 Removing the saw band..........................................................................52
7.1.2 Installing the saw band ............................................................................53
7.1.3 Tensioning the saw band.........................................................................53
7.1.4 Checking the axial running.......................................................................54
7.1.5 Switching off the band drive ....................................................................55
7.1.6 Adjusting the band guide to the saw band dimensions ............................55
7.1.7 Cooling nozzles .......................................................................................57
7.1.7.1 Adjusting coolant flow .............................................................................58
7.2 Dressing device.......................................................................................59
8 Cutting ....................................................................................................61
8.1 Cycle start...............................................................................................61
8.1.1 Preparing to start the cycle......................................................................61
8.1.2 Cancelling automatic mode .....................................................................62
8.1.3 Aborting the cycle ...................................................................................62
8.2 Moving away from the limit switch ...........................................................62
8.3 Engaging the safety clutch.......................................................................63
9 Maintenance............................................................................................65
9.1 Maintenance schedule.............................................................................65
9.2 Lubricant.................................................................................................66
9.3 Cleaning agent ........................................................................................66
9.4 Lubricating, care and cleaning work ........................................................67
9.4.1 Automatic central lubrication ...................................................................67
9.4.1.1 Topping up the lubricant tank..................................................................67
9.4.2 Threaded spindles of fall adjustment........................................................68
9.4.3 Hydraulic aggregate ................................................................................68
9.5 Inspection, checking and adjusting work .................................................69
9.5.1 Air maintenance unit................................................................................69
9.5.2 Buffer battery ..........................................................................................70
9.5.3 Ground clearance....................................................................................70
9.5.4 Brake ......................................................................................................71
9.5.4.1 Adjusting the brake switch.......................................................................71
9.5.5 Replacing the wheel ................................................................................72
9.5.5.1 Removing the wheel ................................................................................73
9.5.5.2 Fitting the wheel ......................................................................................73
10 Packing and transport .............................................................................75
10.1 Packing ...................................................................................................75
10.2 Transport ................................................................................................76
10.2.1 Notes ......................................................................................................76
10.2.2 Transport fixtures ....................................................................................77
10.2.3 Transport fixtures ....................................................................................77
11 Setting up and commissioning the machine.............................................79
11.1 Installation site / ambient conditions ........................................................79

610002683-en-00BS 820 - Table of Contents
11.1.1 Temperature............................................................................................79
11.1.2 Humidity..................................................................................................79
11.1.3 Location ..................................................................................................80
11.2 Unpacking the machine...........................................................................80
11.3 Transport fixtures ....................................................................................80
11.4 Aligning the Machine ...............................................................................81
11.5 Initial operation ........................................................................................82
11.5.1 Measures to be taken before initial operation...........................................82
11.5.2 Requirements on personnel doing the work.............................................82
12 Repair / Service.......................................................................................83
12.1 Service concept ......................................................................................83
12.2 Resources and material...........................................................................83
12.2.1 Special tools, measuring and testing instruments ....................................83
12.3 Fault finding and trouble-shooting............................................................84
12.4 Repair .....................................................................................................84
12.5 Equipment lists and diagrams..................................................................84
12.5.1 Arranged according to technical area ......................................................84
12.5.2 Numbering in equipment lists and diagrams ............................................84
12.6 Ordering spare parts ...............................................................................85
12.6.1 MB part numbers and manufacturers’ equipment designation.................85
12.7 Fault reporting procedure ........................................................................85
13 Putting out of service, storage and disposal ............................................87
13.1 Putting out of service...............................................................................87
13.1.1 Decommissioning....................................................................................87
13.1.2 Cleaning..................................................................................................87
13.1.3 Preservation ............................................................................................88
13.1.4 Fitting transport fixtures ...........................................................................88
13.1.5 Packing ...................................................................................................88
13.2 Storage conditions ..................................................................................88
13.2.1 Space required........................................................................................88
13.2.2 Danger note ............................................................................................88
13.2.3 Storage of spare parts.............................................................................89
13.2.3.1 Long-term storage of satellite roller spindles............................................89
13.3 Disposal ..................................................................................................89
13.3.1 Disposal measures ..................................................................................89

10002683-en-00 7
1
1. Using the operating instructions
1.1 General
This operating manual (OM) introduces the Band Saw BS 820 and explains
how to use it properly. The document takes you, as the reader, through the life cycles
of the machine and shows you, among other things, how the machine can be operated
and serviced safely and economically.
In contrast to drawings and details in this OM, the company reserves the right to make
technical modifications that are necessary to improve the machine or the assembly.
The “Meyer Burger AG” company name is abbreviated in this document to “MB”.
Note: In addition – this OM must be kept at the machine’s installed site at all times.

810002683-en-00BS 820 - Using the operating instructions
1.2 Target group
The OM must be read, understood and all points complied with by all persons
who are tasked with the following work with or on the machine:
■Operation including preparation, trouble-shooting during the working sequence,
removal of production waste, care, disposal of process materials
■Servicing (maintenance, inspection, repair)
■Transport
1.3 Assessing the operating manual
When drafting this OM, we carefully applied standards DIN 62079 (VDE0039)
and EN ISO 12100-2. Despite our efforts, experience tells us that an OM is not a static do-
cument – it is a living document and is experienced by others.
Please let us know of any suggestions for improvements to or comments about this OM!
Every contribution is welcome and will be reviewed by us.
Thank you in advance for your contributions.
Your technical editorial team

10002683-en-00 9
2
2. Product description
2.1 Assemblies
The BS 820 consists of the following assemblies:
■Machine
■Handling
■Crystal Gluing Station
These assemblies and their function are presented below in brief.

10 10002683-en-00BS 820 - Product description
2.1.1 Machine
Fig. 2-1 Machine
Legend 1 Clamping side wheel
2 Drive side wheel
3 Fall adjustment
4 Operating panel
5 Suction head
6 Band tensioning unit
7 Crystal infeed
8Sawband
9 Band drive
10 Cutting feed
11 Machine stand
2.1.1.1 Description
Machine stand Machine stand as a welded construction with high mechanical thermal stability.
Band tensioning unit Band tensioning unit with linear guide and two symmetrically arranged hydraulic cylinders.
Bearing unit Bearing unit with vertical axis and precision roller bearing to receive the wheels.
Wheel Wheel with centring flange for good concentric running and axial eccentricity
Band drive Band drive provided by AC motor (water cooled) with high torque and
optimum acceleration and deceleration properties.
Fall adjustment Fall adjustment for both wheels with precise and stable adjustment.
Band guide Band guide as an adjustable unit for the saw band and workpiece size
with high mechanical stability.
1
23
4
5
6
7
8
3
9
10
11
Indice


















