Mirolin CD 38NA Manuale utente

mirolin.com
Corner Door
Shower Enclosure
INSTALLATION INSTRUCTIONS
Read all instructions
carefully
before proceeding
OWNER’S
MANUAL
Model No.
CD 38NA
42 NAD
For ALL Installation & Product Related Inquires
Contact Customer Care at 800. MIROLIN
Please Do Not Contact Retailer
Mirolin
Copyright Mirolin Industries corp., 2011
Copyright includes all content included in this document
baths for this generation and the next
Mirolin Industries Corp
60 Shorncliffe Road, Toronto, ON M8Z 5K1
T 416 231 5790 800 MIROLIN (647 6546)
F 416 231 0929 800 463 2236

Thank you and congratulations on the purchase of your Mirolin bath and/or shower product.
Please read and follow the installation guide for detailed step by step instructions on how to install and
care for your Mirolin product for years of continued performance and enjoyment.
Should you require assistance with product assembly and/or installation, have any technical questions or
concerns regarding your Mirolin product, please contact Mirolin Customer Care at 800.MIROLIN(647-6546)
and speak to one of our highly trained, professional customer care representatives.
)
Live Customer Care is available 8am to 6pm EST Monday to Friday
Call Mirolin Customer Care at 800.MIROLIN(647-6546
mirolin.com
Your User-Friendly On-line Mirolin Resource Centre
Downloads
Maintenance & Warranty
Product Information
Downloadable product specifications and installation instructions for all products
Detailed product maintenance and warranty information at your fingertips
Detailed product information including product features, options information, list pricing and lifestyle imagery
IMPORTANT
Please Read Complete Instructions Carefully Before Proceeding with Installation
For ALL Installation and Product Related Inquires
Contact Customer Care at 800.MIROLIN
Please Do Not Contact Retailer
Mirolin
mirolin.com
2

INTRODUCTION
This Corner Shower Enclosure Installation Instruction Manual has been designed to make installation as
easy as possible. Please read this booklet completely prior to installing your unit.
Begin familiarizing yourself with all the components using the detailed (exploded) diagram on page 4 and the
descriptions below. Use this as a checklist against all parts included in the package.
3
Please record the date code from the carton. Date Code: ____________________
Please specify the part number, glass pattern and colour of the door when ordering replacement parts.
ITEM QTY
1
1A
2
2A
3
4
5
5A
5B
5C
5D
5E
5F
5G
5H
5J
6
7
7A
7B
7C
8
9
10
11
12
13
14
14A
14B
14C
14D
15
16
17
Wall Jamb Left
Wall Jamb Right
Fixed Panel Left
Fixed Panel Right
Top Header
Bottom Sill
Hinge Assembly (top and bottom)
Hinge
Rubber Washer Outside
Plastic Spacer Insert
Rubber Washer Inside
Inside Cover
Machine Set Screw
Door Panel Threaded Stud
Steel Washer
Steel Nut
#8 x 1 1/2” Long Screw
Handle Assembly
Long Handle
Small Male Handle
Spacer
Door Panel
Long Vertical Gasket Seal
Magnetic strip
#8 x 1” Long Screw
#8 x 1/2” Long Screw
Screw Cap
Bolt / Nut Assembly (Top and Bottom)
Sill / Header Threaded Stud
Plastic Spacer Insert
Plastic Washer
Steel Nut
Short Bottom Sweep Gasket Seal
Long Bottom Sweep Gasket Seal
Plastic Plug
1
1
1
1
1
1
2
2
1
1
1
1
1
1
2
6
6
6
4
4
4
4
4
1
1
6
DESCRIPTION
2
2
2
2
2
2
4
4
4
GENERAL CUSTOMER INFORMATION
Never use scouring powder, pads or sharp
instruments on the metal framing or glass
panels.
An occasional cleaning with a mild liquid
detergent or cleaner such as a window
cleaner is all that is required to keep your
enclosure looking like new.
BASIC TOOLS REQUIRED
"
"
"
"
"
Electric drill
Drill bit 1/8” (3.4 mm)
Phillips screw driver
Level (horizontal and vertical bubbles)
Measuring tape with metric markings
Framing square
"
"9/16” wrench
"
"
"
Knife / Cutter
Pencil
Clear mildew
resistant silicone
caulking

4
EXPLODED VIEW
8
9
10
2
3
1
11
12
13
14
14B
14C
14A
5
17
4
6
16
2A
1A
Outside
14D
DETAIL VIEW I
BOLT / NUT ASSEMBLY - ITEM 14
5
DETAIL VIEW II
HINGE ASSEMBLY-ITEM 5
DETAIL VIEW III
HANDLE ASSEMBLY - ITEM 7
Outside
Inside
7A
7B
7C
8
5G
5H
5J
7
Inside
2-2A
15
5D
5A
5B
5C
5E
5F
Inside Outside
8
NOTE: RIGHT HAND DOOR SWING SHOWN

5
STEP 2: Measure 1/4’’ (6 mm) from the outside edge
of the threshold and make a pencil mark. This is a
location of the Wall Jamb (1). Repeat this step on the
other side wall.
STEP 1: Remove the lid from box.
Remove packaging and inspect all door components
thoroughly before installation. Check to ensure all
the hardware parts are in the package.
½’’
STEP 3: Align the Wall Jamb (1) with the pencil mark
and drill the bottom hole into the shower wall using
1/8” drill bit. Note: Drill the hole through the pre-
drilled hole in the wall jamb.
STEP 4: Using a Long Screw # 8 x1” (11) provided,
fasten the Wall Jamb (1) to the wall.
STEP 5: Place a level against the Wall Jamb and
make sure the Wall Jamb is plumb. Mark the middle
and top hole drill locations.
STEP 6: Drill holes using a 1/8” drill bit and fasten the
Wall Jamb (1) using # 8 x 1” Long Screws (11).

6
STEP 8: Insert the Left Hand Fixed Panel (2) into the
Wall Jamb (1) as shown.
STEP 7: Repeat steps 3 - 6 on the other side.
STEP 9: Drill holes into the Fixed Panel (2) at the 3
hole locations using a 1/8” drill bit. Fasten the Fixed
Panel (2) to the Wall Jamb (1) using the # 8 x ½’’ Long
Screws provided (12).
STEP 10: Insert Right Hand Fixed Panel (2A) into the
Wall Jamb Right (1A). Repeat steps 8 - 9 on the right
side.
STEP 11: Place the Bottom Sill (4) across the
threshold and insert the Threaded Stud (14A) into the
hole in the Left Hand Fixed Panel (2).
STEP 12: Insert the Threaded Stud(14A) through the
hole in the Right Hand Fixed Panel (2A).
Note: Step 11 and Step 12 determine the door swing. The two door hinge studs on the sill determine the
hinge side and swing of the door, Left or Right.
Door Hinge Studs
RIGHT HAND
DOOR SWING SHOWN

7
STEP 14: Repeat steps 11 and 12 for the Header (3)
installation. Tighten Top Header Steel Nut (14D)
snug. Reference Detail View I - Bolt / Nut assembly
(14) on page 4 of Exploded View.
STEP13: Tighten the Steel Nut (14D) on the Threaded
Stud (14A).
Note: Do not over tighten the nut as the glass
panel may shatter.
STEP 15: Place a level on the top of Header (3) to
ensure that the Header (3) is level, then tighten nuts.
Note: Do not over tighten the nuts as the glass
panel may shatter.
STEP 16: Mount Hinges (5) on the Door Panel (8),
top and bottom. Reference Detail View II - Hinge
Assembly(5) on page 4 of Exploded View.
STEP 17: Lift Door Panel (8) and mount onto the Door
Panel Threaded Studs (5G) top and bottom.
STEP 18: Insert Steel Washers (5H) and Steel Nuts
(5J). Tighten with a 9/16” wrench.

STEP 20: Place the Long Vertical Gasket Seal (9) on
the Door Panel (8) and cut to the correct length even
at the top and bottom.
STEP 19: Tighten the Top Hinge (5) the same way
as in the step 18.
STEP 21: Install Long Bottom Sweep gasket
Seal(16).
STEP 22: Cut the Long Bottom Sweep Gasket Seal
(16) to the right length across the width of the door
panel.
STEP 23: Measure the length required for the Short
Bottom Sweep Gasket Seal (15) at hinge-short side.
STEP 24: Cut the Short Bottom Sweep Gasket Seal
(15) to the correct length.
Short Bottom Sweep
Gasket Seal
Long Bottom Sweep
Gasket Seal
Long Bottom Sweep
Gasket Seal

9
STEP 26: Insert the Door Handle (7) into the two pre-
drilled holes on the Door Panel (8). Reference Detail
View III - HandleAssembly (7) on page 4 of Exploded
View.
STEP 25: Insert Short Bottom Sweep Gasket Seal
(15) onto the Door Panel (8) bottom glass as shown.
STEP 27: Screw Door Handle (7) onto the door
handle studs. STEP 28: Install Magnetic Strips (10) on the Door
Panel (8) and adjoining Fixed Panel. Note: Start at the
top and work down.
Short Bottom Sweep
Gasket Seal
STEP 29: Notch the rigid section of the Magnet Strip
(10) to match with the Bottom Gasket Seal (16)
properly.
STEP 30: The Magnet Strip (10) should line up as
shown. Close the door and check the magnet
alignment.

STEP 31: Top and bottom of the Door Panel (8) can
be adjusted to improve the magnet seal when closing
the door. Loosen the Steel Nuts (5J) and move the
Door Panel (8) left or right.
STEP 34: Apply clear mildew resistant silicone tub
caulking around the Left, Right Fixed Panels (2,2A,)
Bottom Sill (4) outside the shower from wall to wall.
Cure time is 24 hours.
STEP 35: Finished Door Installation. If the door leaks make sure that it was sealed with clear mildew resistant silicone
as specified in the installation manual.
STEP 32: If the Magnet Strip (10) is not closing tight:
Use a piece of wood, tap the wood block with a mallet
to adjust and align the magnet seals in the areas
required.
10
The company reserves the right to change models and specifications without notice.
We want you to be completely satisfied with our products and service. If you have any comments or
suggestions, please call toll free.1-800-MIROLIN
STEP 33: Apply clear mildew resistant silicone on
the outside of tub shower from the top to bottom of
the Wall Jambs (1, 1A).
26 Sept.14
Altri manuali per CD 38NA
1
Questo manuale è adatto per i seguenti modelli
1
Indice
Lingue:
Altri manuali Mirolin Cabina doccia




















