Miura MP1-200 Manuale utente

START-UP OPERATION
MANUAL
Multiple Installation Controller
Pressure Controller MP1-200
MI Terminal MT1-200
T519-998-9150

Date of preparation: May 2012

Introduction
Have the documents below available as well as this Start-up Operation Manual for the start-up operation
of the Pressure Controller MP1-200 (hereinafter called MP1-200)/MI Terminal MT1-200 (hereinafter
called MT1-200).
Document name Manual No. Usage
MP1-200/MT1-200
Installation Manual T519-998-9140
Required for installing the power supply wire and
earth leakage circuit breaker and for performing the
input/output wiring, communication wiring, and
steam pressure sensor wiring.
Also have the document below available according to the boiler to be connected.
Document name Manual No. Usage
Start-up operation
manuals for
equipment units used
-------- Required for setting and operating each equipment
unit.

i
Table of Contents
1. Before the Start-up Operation.............................................................................3
1.1. Checking Installation .............................................................................................................3
1.2. Model Configuration ..............................................................................................................4
1.3. Circuit Board Layout..............................................................................................................5
1.4. Supported Function List ........................................................................................................7
1.5. Display Control Panel............................................................................................................9
1.6. List of Display Items ............................................................................................................10
2. Related Equipment Setting/Start-up .................................................................11
2.1. Setting Boiler for MI Control ................................................................................................11
2.1.1. Setting boiler steam pressure .................................................................................. 11
3. Setting MP1-200..................................................................................................12
3.1. MP1-200 Basic Setting and Connection..............................................................................12
3.1.1. Setting switch (SW1) ............................................................................................... 13
3.1.2. Setting MI control (SW2 to SW4, VR1, and VR4).................................................... 14
3.2. Setting Others for MP1-200 ................................................................................................15
4. Setting MT1-200..................................................................................................16
4.1. MT1-200 Setting Switch Layout and Operation Method......................................................16
4.2. Setting MT1-200 Switch ......................................................................................................17
4.3. Setting MT1-200 Data .........................................................................................................18
4.4. Operating Clear for MT12-CPU Circuit Board (SW2) ..........................................................23
4.5. MT1-200 Setting Example...................................................................................................24
4.5.1. Rotation setting example ......................................................................................... 24
4.5.2. Timer setting example ............................................................................................. 25
5. Checking Operation ...........................................................................................27
5.1. Checking MI-NET Communication ......................................................................................27
5.2. Checking MT1-200..............................................................................................................27
5.2.1. Direct input monitor on MT1-200 Boiler Control Terminal........................................ 27
5.3. Checking MP1-200..............................................................................................................28
5.4. Checking MI Control Operation ...........................................................................................28
6. Handling MT1-200 Alarm (MT12-CPU Circuit Board).......................................30
7. Troubleshooting .................................................................................................34
7.1. There is a small difference between the MPI-200 header pressure display and header steam
pressure gauge. ..................................................................................................................34
7.2. MT1-200 indicator blinks. ....................................................................................................34
7.3. Boilers are controlled by the boiler steam pressure settings (boilers are in manual operation).
............................................................................................................................................34

ii
7.4. The boiler stops with the voltage lower than the control pressure setting (VR1).................34
7.5. “MI” LED turns off................................................................................................................34
7.6. “B.BLOW” and “S.BLOW” LEDs light regardless of 0 of each notification time setting........35
7.7. Input signal error indication is displayed. ............................................................................35
7.8. Communication error occurs. ..............................................................................................36
7.9. When the main power of MT1-200 is off for a long period, the priority order becomes “1”..38
7.10. When the main power of MT1-200 is off for a long period, “F02” alarm is displayed...........38
7.11. Rotation may not occur. Or priority order is duplicated. ......................................................38
8. Supplemental Explanation ................................................................................39
8.1. MP1-200 Input/Output Signal Operation Overview .............................................................39
8.2. MI Control Operation Overview...........................................................................................41
8.3. Priority.................................................................................................................................44
8.4. Backup control ....................................................................................................................45
8.5. Blowdown Timing Notification Function...............................................................................45
8.6. Boiler Maintenance Control Function ..................................................................................45
8.7. Low Load Operation Control ...............................................................................................46

2. Related Equipment Setting/Start-up
3
1. Before the Start-up Operation
1.1. Checking Installation
Before the start-up operation of MP1-200/MT1-200, check the following according to
“MP1-200/MT1-200 Installation Manual.”
a) Unit installation
Ensure that the unit is secured to an appropriate location.
See the section “5. Installation” in MP1-200/MT1-200 Installation Manual for details.
b) Installation of steam pressure sensor
Ensure that the MP1-200 steam pressure sensor is installed correctly to the steam header.
Also ensure that the MT1-200 steam pressure sensor (optional) is installed correctly if it is
used.
See the section “5. Installation” in MP1-200/MT1-200 Installation Manual for details.
c) Wiring
Ensure that the following wires 1) to 5) are correctly connected referring to the section “6.
Wiring” in MP1-200/MT1-200 Installation Manual.
1) Power supply wire and earth leakage circuit breaker installation
2) Input/output signal wire
3) Communication wire
4) Steam pressure sensor wire

2. Related Equipment Setting/Start-up
4
1.2. Model Configuration
MP1-200 and MT1-200 come in the following models depending on the power supply voltage,
available language, cover color, and others. For MT1-200, the model lineup has been renewed
with the adoption of a new internal board MT12-CPU and a wide-range power supply.
The following model is used in North America.
Table 1-1 MP1-200 Model in North America
Model MP1-200A
Steam pressure
specifications 20 K
Power supply 120 VAC
50 / 60 Hz, single phase
Available language English
Cover color Cream
Steam pressure unit PSI
Table 1-2 MT1-200 Model in North America (MT1-200-MAIN circuit board included)
Item MT1-200A
Power supply 120 VAC
50 / 60 Hz, single phase
Available language English
Cover color Cream
Country of destination North America
Steam pressure unit kgf/cm2
Table 1-3 MT1-200 Model in North America (MT12-CPU circuit board included)
Item MP1-200 CG
Power supply 100 to 220VAC
50 / 60 Hz, single phase
Available language English
Cover color Cream
Country of destination North America, Asia
Steam pressure unit kgf/cm2, MPa, PSI

2. Related Equipment Setting/Start-up
5
1.3. Circuit Board Layout
Figure 1-1 MP1-200 Internal Layout
Transformer
MP1-200
DISP
10
P
10
P
CN3 CN2
4P
3P
MP1-200
MP11-****
MP1-200-CPU
MP1-200
MP11-****
Program version indication

2. Related Equipment Setting/Start-up
6
Figure 1-2 MT1-200 Internal Layout (MT1-200-MAIN circuit board)
Figure 1-3 MT1-200 Internal Layout (MT12-CPU circuit board)
CN4CN3

2. Related Equipment Setting/Start-up
7
1.4. Supported Function List
Functions and specifications of MP1-200 and MT1-200 have been changed along with the
program version and circuit board change. The changes are listed below. See the descriptions
of functions for details.
The method of checking the program version depends on the model and circuit board type;
therefore check the program version according to Table 1-4.
Table 1-4 Program Version Checking Method
Model Checking method
MP1-200 Check the label on the ROM on the MP1-200-CPU circuit board.
(See Figure 1-1)
MT1-200
(MT1-200-MAIN)
Check the label on the ROM on the MT1-200-MAIN circuit board.
(See Figure 1-2)
MT1-200
(MT12-CPU) Check the display. The version number of four digits of “MT12 -
****”is displayed in the program version item in the DIP SW display.
(See Figure 1-6)
Table 1-5 List of Supported Functions along with MP1-200A Program Change
Program version
MP11-****
1015 or later
Emergency stop input
(See Table 8-1.)
Contact specification switching (SW1-2)
Supported
Low load operation control (SW1-1)
Supported
Steam pressure display unit switching PSI
Note) Contact our sales office for the program versions other than the above.
Altri manuali per MP1-200
2
Questo manuale è adatto per i seguenti modelli
1
Indice
Altri manuali Miura Controllori


















