Mo Systeme modulbox mb3 Manuale utente

user manual modulbox mb3
status 2020

2
mo systeme GmbH & Co.KG
Table of Contents
A. Product Description
B. General Information
C. Transport and Installation
D. Assembly Instructions
E. De-installation
F. Care and Maintenance
G. Warnings
H. Warranty Conditions
I. Specications
J. Misc. / Contact
K. Plans

3
mo systeme GmbH & Co.KG
A. Description of the modulbox
The modulbox is a modular mobile exhibition
system with a steel frame construction.
The side walls are each comprised of three folding
elements: foldable roof,
weight-bearing accessible platform and door aps.
The modulbox is rain-proof and was designed
to be used both indoors and outdoors. The
modulbox has external measurements of c.
2.48m x 2.48m x 2.85m (w x l x h) when closed;
its total weight is c. 1.8t but this can vary
according to the chosen ttings.
An integrated special feature is the
electromechanical lifting device, enabling (de-
)installation without cranes or other lifting
equipment.
Usable interior space is c. 4m² plus another c. 5m²
per platform unit with roof (exterior space).
The modulbox can be installed in a range of
dierent exhibition designs
simply by choosing dierent coupling and opening
combinations.

4
mo systeme GmbH & Co.KG

5
mo systeme GmbH & Co.KG
0 1 2a
3b 4a
4c 5 6
2b 3a
4b
7 8
4K 4Kb
The following illustration
oers an overview of these
combination possibilities.
The following illustration oers an overview of these combination
possibilities.

6
mo systeme GmbH & Co.KG
B. General Information
B.1 Permissions
The modulbox qualies for exemption from
construction permits because:
-the space it oers is only designed for temporary
occupation, and
-this space does not exceed a volume of 10.5m3
(depends on combination).
According to §2 (5) BauOBln (Berlin Building Code)
human occupancy spaces (Aufenthaltsräume) are
spaces designed or suitable for human occupancy
that is not just temporary. As a consequence, such
spaces
have to be suitable for permanent use.
According to § 56 (1) a building does not need a
permit if it has no
such rooms (designed for non-temporary human
occupancy) and a gross volume < 30m3.
According to the relevant authorities, the
modulbox is also not to be classied as a
‘portable building’
because the system does not have to be taken
apart in order to de-install it.
Before any installation on public spaces or private
land, always contact the relevant authorities
(building/planning control oce) to conrm this
exemption from construction permits. This is the
responsibility of the renter/purchaser.
The renter/purchaser shall incur any costs and
obtain any statutory permits, in particular any
construction permits, necessary for the operation
of the contractual item. Upon request and payment
of costs incurred, modulbox mo systeme can make
available to the renter/purchaser the necessary
documents for obtaining such permits for the
contractual item.
However, modulbox mo systeme cannot guarantee
or assure the success of such applications for
statutory permits.
A type test certication (Typenprüfung) is available
for the modulbox mb². This can be shown to the
local building authorities.

7
mo systeme GmbH & Co.KG
plans + sections

8
mo systeme GmbH & Co.KG
C. Transport and Installation
The modulbox has to be set up horizontally so
that any rain water can be channelled away at the
lowest point. Do not open the modulbox during a
storm. Further usage instructions are to be found
in the section ‘Warnings’ and the introduction to
use.
C.1 Transport with truck and fork-lift
The modulbox has a total height of 2.85m and a
weight of up to 2t per modulbox, depending on
ttings. These data should determine the choice of
transport vehicle and fork-lift (load centre).
The transport vehicle has to have a suitable load
height (Jumbo Roller).
During transport on an open vehicle the
modulbox should be covered with a transport
cover (special ttings).
When using a protective cover during transport,
protect the corner of the rain tube in order to
ensure that the cover is not ripped.
Fork-lift trucks whose forks are a minimum of
2.00m long can lift the modulbox from two sides
(the two sides marked with the sticker). (C1.3).
In this case it is important to place the modulbox
on the transport vehicle in such a way that it can
be unloaded from the same side – see Figure.
If the forks are longer than 2.40m, the modulbox
can be lifted from all four sides.
The modulbox must not be stored on its
adjustable feet (C1.1) during transport and
storage. These should be screwed in. Suitable
timber bearers are to be placed under the
modulbox (c. 10x10x80cm) (C1.2).
When on the transport vehicle, the modulbox
must be tightly secured so as to prevent any
movement. Securing straps should be fastened to
the fastening points. Four securing straps must be
used for each modulbox (one at each corner).
Alternatively, securing straps can be attached from
the oor points on the truck over the attic sheeting
of the modulbox. If so, careful attention must be
paid that the securing straps do not damage the
foldable roof parts.
Check every installation site for the modulbox
very carefully. Make certain that the ground is rm
enough to bear the modulbox. On soft ground
the modulbox must be placed on load-distributing
stone slabs or steel plates. Bear in mind that,
depending upon use, a load of up to one ton must
be borne by each of the feet.
External measurements of the modulbox
Length x width x height
2.46m x 2.46 x 2.85
Weight: up to 2t gross weight

9
mo systeme GmbH & Co.KG

10
mo systeme GmbH & Co.KG
Requirements for fork-lift:
- min. 3,5 tons lifting capacity
- fork length min. 1.80m
Do not use a fork-lift with forks less than 1.80m to
load the modulbox. Danger of tipping over!
Set down carefully, the modulbox is sometimes
tted with castors (special ttings). Only set down
on absolutely horizontal ground!
And ensure it can’t roll away!