The installation process
Start
Prepareto
install Page5-6
Page6
Page7-8
Page9
Page7
Page8
Page9
Page10
Page10
Page11
Page11
Page10-15
Page12
Page13-14
Page15
Page22
Page16-21
Page16
Page16-20
Page21
Page23
Page22-24
Page24
Attention
Install Tool
Install Device
Install business
board
Install /Remove
board
Set Up Cables
Checkbefore
power-on
Checkafter
power-on
Connect device
Checkafter
Installation
Appendix
Installation
Complete
Rack
Requirements
Install the
machine box
Install power
cables
Connect protection
ground wire
Install management
communication fiber
Introduction of
board slot
Plug and unplug
optical module
PlaceCables
Checkfiber loss
Changethe
fan unit
Changepower
unit
Changecontrol
board

- 3 -
With the rapid development of industry communication, the demand for long distance and large
capacity bandwidth increases rapidly. In order to adapt to the new load bearing requirements, for
data center interconnection (DCI) optoelectronic integrated wave division transmission equipment --
NS-DWDM-OP01-DCI-AC. The device is mainly located in the MAN, including the metropolitan core
layer, the convergence layer, and the metropolitan access layer. It can meet the rapidly growing
bandwidth demand between DCS, realize the flexible deployment of devices,create an open optical
network architecture, and lead the DCI market into a new era of high-speed all-optical
interconnection.
Product Appearance
Product Features
lPhotoelectric integrated, pluggable modular design; Components are hot-swappable, deployed on
demand, and expanded on demand.
lThe heat dissipation design adopts the forward air and rear air exhaust, and provides 1+1 FRU fan
units,support automatic speed regulation.
lThe 19-inch standard rack fits into the data center equipment room and can be deployed in the same
cabinet with IT devices.
lEach pair of optical fiber transmission capacity can reach 25.6 Tbit/s @ 400 g * 64 + C band lambda,
each sub-rack the highest 1.6 Tbit/s.
lSingle-wave capacity is 400 g, 600 g & 800 g & 1.2 T continued evolution.
lThe optical laminates are highly integrated with functions such as OA, WSS, VOA, OSC, OTDR,
OCM, and OLP to simplify the internal optical fiber connection.
lSupports 10GE, 100GE, 100GE FlexE(Unware mode), STM-64, 10GE WAN, OTU2, and OTU4
services.
lSupports 9-D ROADM networking and Flexible Grid.
lSupport business layer, OTN layer, optical layer comprehensive performance monitoring, quality
visible.
lProvides multiple network - and device-level protection solutions. The protection switchover delay is
less than 50ms, ensuring superior protection performance
lSupport NETCONF/YANG standard open interface and GUI management platform based on B/S
architecture.
NS-DWDM-OP01-DCI-AC Device Introduction

- 4 -
Product specification
Parameter Instructions
Rack
Size 2U:44mm(H)x444mm(W)x490mm(D)
Maximum Capacity 1.6Tbit/s
Number of business
slots 4
Apply cabinet 19’ cabinet, 800mm depth or above
Ports of line
side
Speed
✪200G (PDM_QPSK)
✪200G (PDM_8QAM)
✪200G (PDM_16QAM)
✪400G (PDM_16QAM)
Optical module Pluggable CFP2、adjustable wave length
Ports of
client side
Business type
10GE、100GE
OTU2、OTU4
STM-64、10GE WAN
Optical module
✪pluggable SFP+
✪pluggable QSFP28
Maximum number of wavelengths Fixed grid: 96 waves@50 GHz
Channel spacing Flexible grid: 50 GHz/75 GHz/100 GHz/150 GHz
Center frequency range 191.35 GHz ~ 196.1 GHz
Central wavelength range 1528.77 nm ~ 1566.73 nm
Protection function
✪Optical line protection(OLP)
✪Optical wdm section protection(OMSP)
✪Optical channel protection(OCHP)
Network management
✪Supports hot swap of the main control board
✪Supports CLI, NETCONF, and GUI management
platforms based on B/S architecture
✪Supports OSC-based DCN communication
Power
supply
Back up Standard CRPS power supply 1+1 backup
AC
✪Rated voltage range:
– 100 V AC~130 V AC (50/60Hz)
– 200 V AC~240 V AC (50/60Hz)
✪Maximum voltage range:90 V AC~264 V AC
(45Hz~65Hz)

- 5 -
High voltage direct
current
✪Rated voltage range:240 V HVDC
✪Maximum voltage range:192 V HVDC~288 V HVDC
DC
✪Rated voltage range:-48 V DC/-60 V DC
✪Maximum voltage range:-40 V DC~-72 V DC
Heat dissipation
✪After the forward wind comes the wind
✪1+1 Fan Board Backup
Typical power consumption <550W(fully equip)
Environment
Working temperature
✪short term:-5℃~+45℃
✪long term:0℃~40℃
Storage temperature -40℃~+70℃
Humidity 5%~95% (No condensation)
1.1 Safety Precautions
■ To ensure the safety of the human body and the device, follow the labels on the device and the safety
precautions in this document when installing, operating, and maintaining the device. The items such as
" Danger" and " Caution" in this manual do not represent all the safety precautions to be
followed. They are only supplements to the safety precautions.
■ During the operation of our company's equipment, we must strictly follow the relevant equipment
precautions and special safety instructions provided by NewNets. The "safety warnings" listed in the
manual only reflect the requirements of Newnets, not the general safety requirements. NewNets, LLC
does not assume any responsibility for any loss caused by the violation of the general safe operation
requirements or the violation of the design, production and use of equipment safety standards.
Instructions
Intended Audience This document provides a quick and concise guide for hardware installation.
This document does not describe the installation operations performed before delivery. It only
describes the operations involved in onsite installation.
Attention

- 6 -
Attention
Electrostatic
To prevent the static electricity of the human body from damaging the sensitive components, wear ESD
gloves or an ESD wrist strap and ground the other end of the ESD wrist strap well before touching the
device or holding the board, board, or IC chip.
Binding wire
lThe interval between cable ties and optical fiber bundling tapes inside cabinets should not exceed
250mm. (The interval between binding cable ties inside the cabinet should not exceed 200mm.)
lOutside the cabinet, bind all cables and corrugated pipes based on the distance between two beams.
For cable troughs without beams, bind cables with a distance of not more than 250mm.
Check before installation
lBefore installing a device, check the equipment room, cabinet, power supply, ground cable, optical
cable, and supporting facilities. After the construction conditions are determined, the construction
shall be carried out according to the engineering design documents.
l When installing and maintaining the NS-DWDM-OP01-DCI-AC, take ESD measures, such as
wearing an ESD wrist strap or ESD gloves.
l When transporting, moving, or installing the NS-DWDM-OP01-DCI-AC, avoid collision with doors, walls,
or shelves. Do not touch parts or unpainted metal surfaces with sweaty or dirty gloves.
l Do not pile up sundry on the equipment.
Attention
NS-DWDM-OP01-DCI-AC device has it’s own fan. The air inlet is in the front, and the air outlet is in
the back. Ensure that the air inlet and air outlet are not blocked by optical fibers or paper etc.
Front - inlet Rear side - Air outlet

- 7 -
1.2 Installation Environment Requirements
lDo not place the device in an environment with flammable or explosive gas or smoke, and do not
perform any operations in such an environment.
lThe device must be installed in a clean, dry, well-ventilated, and temperature-controlled place. Water
seepage, dripping and condensation are strictly prohibited in the installation site.
lDust proof measures should be taken in the installation site. Indoor dust on devices causes
electrostatic adsorption and poor contact between metal connectors or metal contacts. This not only
affects the service life of devices but also easily causes device faults.
lEnsure the installation of ambient air circulation,do not plug the heat dissipation holes of the
NS-DWDM-OP01-DCI-AC device. Leave more than 50mm space around the device for heat dissipation.
lThe temperature and humidity at the installation site must be within the normal operating temperature
range (-5 ° C to 45 ° C (typical) (0m to 1800m), altitude range (1800m to 5000m), and humidity
range (5%-95% RH without condensation).
Installation Tools
2.1 Device Installation Tool
matters need attention
Phillipsscrewdriver Flat-head screwdriver multimeter wire crimper bolt clipper
wire stripper cable clamp Installthe gloves antistatic Esdwrist strap
ladder Optical fiber Velcro Electricalinsulation tape network tester optical power meter

- 8 -
3.1 Rack requirements
l NS-DWDM-OP01-DCI-AC width of the device complies with industry standards and can be installed
in the IEC 19-inch standard cabinet.
l NS-DWDM-OP01-DCI-AC cabinet depth must be at least 800mm.
l cabinet at the front of the linear space for not less than 120 mm, can appear otherwise cable his
problem.
lA tray is installed in the cabinet.
lFor a 19-inch cabinet, ensure that there is at least 75mm of space on both sides to prevent the air
inlet and outlet from being blocked
lThe porosity of the cabinet door is greater than 50%, which meets the heat dissipation requirements
of the device.
lThe cabinet has reserved ground terminals that connect to devices.
lIf the upper cabling mode is used, reserve an outlet on the top of the cabinet. If underfloor cabling is
used, reserve an outlet at the bottom of the cabinet.
Device Installation
NS-DWDM-OP01-DCI-AC
H=44m
m

- 9 -
3.2 Install the machine box
Device Installation
②Place the NS-DWDM-OP01-DCI-AC device on
the cabinet tray.
④Fix the panel mounting ears to the floating nuts
on the mounting bar of the cabinet using a
screwdriver knob screw.
③Slowly push the mounting ears into the
device so that the mounting ears on the panel
align with the floating nuts on the mounting
bar of the cabinet.
①Determine the installation position of the
device.

- 10 -
4.1 Install/Remove board
Install business board
※Removinga running board mayaffect the normal running of the device and interrupt services.
※If the boards are not installed, place them in ESDbags and mark them.
※When inserting a board, ensure that the board connector is aligned with the backplane socket.
※If the board fails to be inserted, do not forcibly insert the board. Checkthe position
of the board before reinserting the board. 。
Removing the Filler Panel
Loosen the captive screws on the filler
panel counterclockwise. Hold the upper
and lower ends of the filler panel with
both hands and pull the filler panel out
along the guide rails in the slot.
Install the board
Hold the buckle parallel to the board panel,
align the board with the guide slot, and
push the board into the slot with
appropriate force until it is fully
inserted.
Remove the board
Pull the buckle perpendicular to the board
panel and pull the board out along the
guide rails with moderate force.
Attention
Filler panels must be inserted into the empty slots of the chassis to
prevent foreign objects from entering the chassis and causing faults.
Indice
Manuali Hardware per computer popolari di altre marche

EMC2
EMC2 VNX Series Manuale del proprietario

Panasonic
Panasonic DV0PM20105 Manuale utente

Mitsubishi Electric
Mitsubishi Electric Q81BD-J61BT11 Manuale utente

Gigabyte
Gigabyte B660M DS3H AX DDR4 Manuale utente

Raidon
Raidon iT2300 Manuale utente

National Instruments
National Instruments PXI-8186 Manuale utente