
ABS1476/A 3/48
OUTDROP 2+
5.4. PRÉPARATION ET MISE EN PLACE DES JOINTS D’ÉTANCHÉITÉ
PREPARING AND INSTALLING THE CABLE SEALS .....................................................21
5.4.1. JOINT D’ÉTANCHÉITÉ PRINCIPAL
MAIN CABLE SEAL ......................................................................................21
5.4.2. JOINTS D’ÉTANCHÉITÉ LATÉRAUX (OPTION)
LATERAL SEALS (OPTIONNAL).....................................................................22
6. PRÉPARATION DES CASSETTES
PREPARING THE SPLICING TRAYS .................................................................23
6.1. OUVERTURE FERMETURE DE L’ORGANISEUR CASSETTES
OPENING AND CLOSING THE ORGANIZER............................................................23
6.2. PRÉPARATION DES CASSETTES POUR LA VERSION 2 X 36 FO STANDARD
PREPARING THE SPLICE TRAYS - 2X36 OF STANDARD VERSION...............................24
7. PRÉPARATION ET INSTALLATION DU CÂBLE RÉSEAU
PREPARING AND INSTALLING THE NETWORK CABLE ...................................25
7.1. PRÉPARATION DU CÂBLE PRINCIPAL
MAIN CABLE PREPARATION ....................................................................................25
8. RACCORDEMENT DU CÂBLE PRINCIPAL
CONNECTING THE MAIN CABLE ....................................................................27
8.1. FIXATION DU CABLE
CLAMPING THE CABLE ...........................................................................................27
8.1.1. MISE EN PLACE DES PORTEURS DANS L’ÉTRIER
INSTALLING THE STRENGHT MEMBERS IN THE CLAMP ASSEMBLY...............27
8.2. LOVAGE DES MICROMODULES
COILING THE MICROBUNDLES...............................................................................29
8.2.1. VERSION MICROBUNDLE
MICROBUNDLE CONFIGURATION .............................................................29
8.2.2. VERSION LOOSETUBE
LOOSETUBE CONFIGURATION ..................................................................31
9. PRÉPARATION ET RACCORDEMENT DES CÂBLES DE DISTRIBUTION
PREPARING AND INSTALLING THE DISTRIBUTION CABLES...........................33
9.1. ORDRE DE RACCORDEMENT DES CÂBLES DE DISTRIBUTION
DISTRIBUTION CABLES CONNECTION ORDER........................................................34
9.2. CHEMINEMENT DES CÂBLES DE DISTRIBUTION
ROUTING THE DISTRIBUTION CABLES ..................................................................35
9.2.1. CONFIGURATION CÂBLE MICROBUNDLE
MICROBUNDLE CABLE CONFIGURATION...................................................35
9.2.2. CONFIGURATION CÂBLE LOOSE TUBE
LOOSE TUBE CABLE CONFIGURATION.......................................................36
10. EPISSURAGE
SPLICING .......................................................................................................38