
POLYKEG PRO WITH BAG
Filling instructions with PolyKeg®manual kit
7. Sanitizing
9. Counter-pressure
regulation
10. Filling 11. End of lling
8. Connection and Counter-Pressure Check
Before lling, sanitize the parts in
contact with the product as indicated
in the “Sanitizing instructions”
section.
Work with the gas valve until the
desired counter pressure is reached
(approx. 0.5 bar lower than the
product lling pressure).
Open the product valve to start
lling and work with the
counterpressure regulator to set
and/or change the lling speed.
Once the nominal lling volume is
reached, close the product valve. Do
not exceed the nominal lling volume
to prevent the product from leaking
out of the bag.
Make sure the lling head is properly connected to the valve, lower the lever and
check the internal pressure of the keg.
FIG. 9
FIG. 8.1 - A-M VALVES FIG. 8.2 - S-D VALVES FIG. 8.3 - G-K VALVES
FILLING
FIG. 10
1.5 BAR
FIG. 11
FIG. 7
This document is property of PolyKeg® S.r.l. - Unauthorized copying and use is strictly forbidden.
PolyKeg S.r.l - Via L. Da Vinci, 5/9 24064 Grumello del Monte (BG) - Italy - Ph. +39 035 4522245 - E-mail:
[email protected] - www.polykeg.com
Rev. 01 dated 19/03/2021