tel: 888-923-9813 | info@leisurecraft.com| web: www.leisurecraft.com
Manufactured by:
5
Gather your tongue and groove floorboards.
Insert the floorboards into the frame ensuring that
they are tight by tapping them together with a rubber
mallet.
Fasten the floorboards into the outer floor joists with
1 ½” (38mm) screws.
For aesthetic purposes, don’t secure the floorboards
to the first inner joist from the front of the sauna.
The benches will cover the first 2 rows of screws.
Continue adding the floorboards in the same manner.
When you are down to the last 4 or 5 floorboards, do
not secure them at this point.
Place your last floorboard into place.
You may use the rubber mallet to gently finesse the
last board into place.
Fasten the remaining floorboards.
Sauna Assembly
CU570/CU572 Pure Cube
Outdoor Sauna Assembly Instructions