Richmond GTR169 Manuale utente

GTR169 Electric Lock Manual Rev 1 1
Electric Lock to Suit
Swing Gate Kits GTR169
Electric locks are designed to secure your gate rmly in place and add extra security.
For dual gate installations we highly recommend using our GTR164 gate stopper.
WARNING: Not Recommended for single or double gates with solid inll front panels in high wind areas
Important Information:
1. Before you install the Electric Lock please be sure the gate is level, moves freely, and does not bind or
block against barriers
2. For the Electric Lock to work correctly, the gate must close rmly engaging the lock catch against the
lock receiver.
3. The Electric Lock must be installed on the outside of the gate if the gate is Push-to-Open .
4. Due to the various mounting conditions , mounting hardware is not provided. Read this manual carefully
to determine the mounting hardware required for your condition.
5. For dual gate, the lock must be installed on the Master Gate (gate 1) which is near the Control Box, and
the lock receiver must be installed on the Slave Gate (gate 2).
(If the gate near the control box has been set up as slave gate, you can change the settings following
User's Manual for your gate automation kit)
Suits the Following Richmond Gate Motors: GTR058, GTR062, GTR078, GTR099

GTR169 Electric Lock Manual Rev 1 2
Installation for Single Swing Gate
Step 1:
Disengage the clutch of the swing arm with the Manual Release Key. Make sure you can move the gate
by hand, so the gate can swing freely during installation of the Electric Lock.
Step 2:
With the gate in the closed position, determine the best location for the lock and receiver. The lock and
receiver must be level and aligned with the opener. The lock and receiver should have a solid surface or
tube fence to provide stability
Step 3:
For a Metallic Tube gate, if the thickness of the fence post is bigger than or equal to 3mm, you can
thread on the fence post, and fasten the lock and receiver only using bolts (without nuts). Otherwise, drill
holes throughout the fence post and fasten the lock and receiver with bolts, lock washers and nuts. Of
course you could also weld them directly.
For a Chain Link gate, you will need U Bolts, saddles, lock washers and nuts for the lock and receiver.
Step 4:
Recheck the locks position and alignment, make sure the electric lock is working correctly.
Step 5:
Connect the power cables for the lock to the control board of swing gate opener and Lock plus board.
(See Figure E and F).
Note: Be sure that the clutch of the swing arm is engaged before you prepare to activate your
opener (Use the Manual Release Key)

GTR169 Electric Lock Manual Rev 1 3
Installation for Double Swing Gate
Step 1:
Disengage the clutch of the swing arms with the Manual Release Key. You can move the gate by
hand, so the gate can swing freely during installation of the Electric Lock.
Step 2:
With the gates in the closed position, determine the best location for the lock and receiver . The
lock and receiver must be level and aligned with the swing arms. The lock and receiver should
have a solid surface or tube fence to provide stability.
Step 3:
For Metallic Tube Gates, if the thickness of the fence post is bigger than or equal to 3mm, you
can thread on the fence post, and fasten the lock and receiver only using bolts (without nuts).
Otherwise, drill holes throughout the fence post and fasten the lock and receiver with bolts, lock
washers and nuts. Of course you could also weld them directly.
For a Chain Link Gates, you will need U Bolts, saddles, lock washers and nuts for the lock and
receiver.
Step 4:
Recheck the locks position and alignment, make sure the electric lock is working correctly.
Step 5:
Connect the power cables for the lock to the control board of swing gate opener and Lock plus
board. (See Figure E and F).
Note: Be sure that the clutch of the swing arms is engaged before you prepare to activate
your opener (Use the Manual Release Key)

GTR169 Electric Lock Manual Rev 1 4

GTR169 Electric Lock Manual Rev 1 5
Connecting the Lock to the
GTR099, GTR062 and GTR078 Automatic Gate Kits
The electric lock has been connected with the E-Plus board. Disconnect the terminals so that the electric
lock wires can be fed through the access port and reconnected to the E-Plus board.
The other wires of the electric lock should be connected to the control board using the following wiring
diagram, or the wiring diagram in the swing arm manual.

GTR169 Electric Lock Manual Rev 1 6
Connecting the Lock to the
GTR058 and GTR100 Automatic Gate Kits
The wires of the electric lock should be connected to the control board as the following
wiring diagram and the wiring diagram in thein the swing arm manual.
Indice