rollease acmeda ZIPSCREEN Manuale utente

Page 1of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
COVER ASSEMBLY
STEP 1 –DRILL CLEARANCE HOLES IN ‘END PLATE’ TO FACILITATE INSTALLATION FIXINGS
FACE FIX INSTALLATION OPTION
TOP FIX INSTALLATION OPTION
RECESS FIX INSTALLATION OPTION
NOTE: Holes are marked on end plate for drilling,
For balanced installation drill holes at corresponding opposite sides of plate.

Page 2of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
BOX INSTALLATION
STEP 1 –INSTALL BOX TO WALL/CEILING
Note: Use appropriate fixings to suit application. Ensure Box is Aligned and Level.
COVER INSTALLATION
STEP 1 –INSTALL END PLATES TO WALL/CEILING USING APPROPRIATE FIXINGS TO SUIT APPLICATION
Note: 1. Use appropriate fixings to suit application. 2. Ensure End Plates are Aligned and Level. 3. Measure brackets end to end to confirm measurement is
correct

Page 3of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
OPEN BRACKET INSTALLATION
STEP 1 –INSTALL BRACKETS TO WALL/CEILING USING APPROPRIATE FIXINGS TO SUIT APPLICATION
Note: 1. Use appropriate fixings to suit application. 2. Ensure brackets are Aligned and Level. 3. Measure brackets end to end to confirm measurement is
correct
BLIND INSTALLATION
STEP 1 –INSERT BLIND INTO BOX
User effort will be required to push the booster head/Idler pin into the adapter, a noticeable “click” will indicate that the component is correctly
located.

Page 4of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
BLIND INSTALLATION
STEP 2 –INSERT RETAINER CLIP MKII ONTO IDLER ADAPTER
IDLER END CONTROL END
Ensure pin is clipped in securely SPRING ONLY: Insert Retainer Clip MKII at spring end
Tighten the Screw SPRING ONLY: Insert Retainer Clip MKII at spring end
and tighten the screw to secure.
STEP 3 –UNLOCK PRE-TENSION HEAD AT SPRING END STEP 4 –FEED THROUGH MOTOR CABLE
(FOR SPRING ONLY) (FOR MOTOR ONLY)

Page 5of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
BLIND INSTALLATION
STEP 5 –RUN BLIND DOWN + CENTRE
STEP 6 –TEST BLIND OPERATION
For spring operation, blind should creep up slowly when pulled down.
If blind does not creep up, add more pre-turns. For motor operation,
ensure wiring is correct and motor is operating correctly.
For gear operation, ensure operation is smooth.
ADJUSTING PRE-TURNS (SPRING OPERATED BLINDS ONLY)
STEP 1 –TO ADJUST PRE-TURNS, LOCK STEP 2 –DISENGAGE THE SPRING HEAD
PRE-TENSION HEAD FROM ADAPTER
Note: Ensure spring is locked by lifting weight bar until fabric bunches up. Loosen the screw then lever the Retainer Clip MKII outwards.

Page 6of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
STEP 3 –ADD ADDITIONAL PRE-TURNS REQUIRED
Note: Gradually increase the number of pre-turns required. Only remove the pre-tension spanner when the spring tension is held by the internal
mechanism, immediately after a ‘click’ is heard.
STEP 4 –UNLOCK PRE-TENSION HEAD STEP 5 –RE-INSTALL AND TEST BLIND
Note: When the weight bar is pulled down, the tension in
the spring will be released.
If too many pre-turns are added, the blind will automatically raise.
Note: Re-install and secure Retainer Clip when complete.
PART I –SIDE GUIDE INSTALLATION
STEP 1 –MARK OUT SIDE GUIDE POSITION AND ALIGN RAIL (FOR OPEN BRACKET ONLY)
Note: Use Open Bracket Template (RE01- Use thickness of Open Bracket Template Rail to sit flush to bracket
3012-033000) to assist

Page 7of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
STEP 2 –MOUNT L-FIXING RAIL TO WALL ON BOTH SIDES (FOR FACE FIX ONLY)
STEP 3 –INSERT U-MOUNTING RAIL/FACE FIX U-MOUNTING RAIL
STEP 4 –SECURE U-MOUNTING RAIL TO SIDE FIX SURFACE OR L-FIXING RAIL
FACE FIX: L –FIXING RAIL

Page 8of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
SIDE FIX
STEP 5 –REMOVE THE STOPS FROM THE FUNNEL IN THE INNER RAILS
Use flat head screw driver to pry both stops out.
STEP 6 –SWING INNER RAIL INTO THE U MOUNTING RAIL ON AN ANGLE ON BOTH SIDES
Ensure weight bar is 50-100mm from box
Feed zip into funnel

Page 9of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
STEP 7 –PUT STOPS BACK INTO FUNNEL
If there is inadequate access to the back of the blind to attach stops, add only one to the front of the blind on both ends
STEP 8 –OPERATE BLIND MULTIPLE TIMES TO ALLOW INNER RAIL TO MOVE INTO NATURAL POSITION
The inner rail should sit parallel with the zip to avoid strain or jamming of blind during
operation.
Ensure the zip is running inside the inner rail on both sides.
When using the Ultra-Lock, the Latch Housings must be level with each other to ensure
the Ultra-Lock Pins lock simultaneously.
Adjust the position of the Inner Rails as required.
STEP 9 –SECURE THE INNER RAILS

Page 10 of 14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
STEP 10 –TEST OPERATION AND APPEARANCE OF BLIND
STEP 11 –(NOT FOR ULTRA-LOCK) –SET MOTOR LIMITS (MOTOR CONTROL ONLY)
Altri manuali per ZIPSCREEN
4
Indice

















