Ruijie RG-WS7005-A(V2) Manuale di installazione e funzionamento

Ruijie RG-WS7005-A(V2) Wireless Access
Controller
Hardware Installation and Reference Guide
Document Version: V1.3
Date: August 16, 2023
Copyright © 2023 Ruijie
Networks

Copyright
Copyright © 2023 Ruijie Networks
All rights are reserved in this document and this statement.
Any reproduction, excerption, backup, modification, transmission, translation or
commercial use of this document or any portion of this document, in any form or by any
means, without the prior written consent of Ruijie Networks is prohibited.
Trademark and are owned by Ruijie
Networks.
All other trademarks or registered trademarks mentioned in this document are owned by
their respective owners.
Disclaimer
The products, services, or features you purchase are subject to commercial contracts and
terms. Some or all of the products, services or features described in this document may
not be within the scope of your purchase or use. Unless otherwise agreed in the contract,
Ruijie Networks does not make any express or implied statement or guarantee for the
content of this document.
Due to product version upgrades or other reasons, the content of this document will be
updated from time to time. Ruijie Networks reserves the right to modify the content of
the document without any notice or prompt.
This manual is for reference only. Ruijie Networks endeavors to ensure content accuracy
and will not shoulder any responsibility for losses and damages caused due to content
omissions, inaccuracies or errors.

I
Preface
Intended Audience
This document is intended for:
Network engineers
Technical support and servicing engineers
Network administrators
Technical Support
Ruijie Networks Website: https://www.ruijienetworks.com/
Technical Support Website: https://ruijienetworks.com/support
Case Portal: https://caseportal.ruijienetworks.com
Community: https://community.ruijienetworks.com
Technical Support Email: service_rj@ruijienetworks.com
Live Chat: https://www.ruijienetworks.com/rita
Conventions
1. Conversions
Convention
Description
Bold font
Commands, command options, and keywords are in bold font.
Italic font
Arguments for which you supply values are in italic font.
[ ]
Elements in square brackets are optional.
{ x | y | z }
Alternative keywords are grouped in braces and separated by
vertical bars.
[ x | y | z ]
Optional alternative keywords are grouped in brackets and
separated by vertical bars.
&<1-n>
The argument before the sign (&) can be input for consecutive 1-
n times.
//
Double slashes at the beginning of a line of code indicate a
comment line.

II
2. Signs
The signs used in this document are described as follows:
Warning
An alert that calls attention to important rules and information that if not understood or
followed can result in data loss or equipment damage.
Caution
An alert that calls attention to essential information that if not understood or followed
can result in function failure or performance degradation.
Note
An alert that contains additional or supplementary information that if not understood or
followed will not lead to serious consequences.
Specification
An alert that contains a description of product or version support.
3. Note
The manual offers configuration information (including model, port type and command
line interface) for indicative purpose only. In case of any discrepancy or inconsistency
between the manual and the actual version, the actual version prevails.

i
Contents
Preface...................................................................................................................................................I
1 Product Overview .............................................................................................................................1
1.1 About the RG-WS7005-A(V2)....................................................................................................1
1.2 Hardware Features...................................................................................................................1
1.3 Package Contents.....................................................................................................................5
1.4 Technical Specifications...........................................................................................................5
1.4.1 Dimensions and Weight...............................................................................................5
1.4.2 Ports ..............................................................................................................................6
1.4.3 Power Supply and Consumption ................................................................................6
1.4.4 Environment and Reliability ........................................................................................7
1.5 LED and Button.........................................................................................................................7
2 Preparing for Installation...............................................................................................................10
1.6 Safety Precautions..................................................................................................................10
1.6.1 General Safety Precautions .......................................................................................10
1.6.2 Handling Safety ..........................................................................................................11
1.6.3 Electric Safety..............................................................................................................11
1.6.4 Storage Security .........................................................................................................11
1.7 Installation Environment Requirements..............................................................................12
1.7.1 Bearing Requirements...............................................................................................12

ii
1.7.2 Ventilation Requirements..........................................................................................12
1.7.3 Clearance Requirements ...........................................................................................12
1.7.4 Temperature and Humidity Requirements..............................................................12
1.7.5 Cleanliness Requirements.........................................................................................13
1.7.6 Grounding Requirement ...........................................................................................14
1.7.7 ESD Protection Requirements...................................................................................15
1.7.8 Anti-interference Requirements ...............................................................................15
1.7.9 Surge Protection Requirements................................................................................16
1.7.10 Others........................................................................................................................16
1.8 Tools ........................................................................................................................................16
2 Installing the Device.......................................................................................................................17
2.1 Installation Procedure ...........................................................................................................17
2.2 Checking Before Installation.................................................................................................18
2.3 Precautions.............................................................................................................................19
2.4 Installing the Device...............................................................................................................19
2.4.1 Securing a Device .......................................................................................................19
2.4.2 Installing a Power Module.........................................................................................20
2.4.3 Grounding Installation...............................................................................................20
2.5 Bundling Cables......................................................................................................................20
2.5.1 Notes ...........................................................................................................................20
2.5.2 Bundling Steps............................................................................................................20

iii
2.6 Verifying Installation..............................................................................................................21
2.6.1 Checking the AC .........................................................................................................21
2.6.2 Checking Cable Connections.....................................................................................21
2.6.3 Checking the Power Supply.......................................................................................21
3 Commissioning ...............................................................................................................................22
3.1 Setting Up the Configuration Environment .........................................................................22
3.1.1 Environment Preparations ........................................................................................22
3.1.2 Connecting an Ethernet Cable ..................................................................................22
3.1.3 Setting Terminal Parameters ....................................................................................23
3.2 Powering on the Device.........................................................................................................25
3.2.1 Checklist Before Power-On........................................................................................25
3.2.2 Checklist After Power-on ...........................................................................................25
4 Monitoring and Maintenance........................................................................................................26
4.1 Monitoring ..............................................................................................................................26
4.1.1 LED...............................................................................................................................26
4.1.2 CLI commands............................................................................................................26
4.2 Remote Maintenance.............................................................................................................26
4.3 Hardware Maintenance .........................................................................................................26
5 FAQs.................................................................................................................................................27
5.1 Troubleshooting Flowchart ...................................................................................................27
5.2 Common Faults ......................................................................................................................27

iv
5.2.1 Ethernet Port Is Not Working After the Ethernet Cable Is Plugged In..................27
5.2.2 LED Is Off for a Long Time.........................................................................................27
5.2.3 System LED Blinks Green for a Long Time...............................................................27
5.2.4 Troubleshooting Power Failures...............................................................................28
5.2.5 Troubleshooting System Failures .............................................................................28
6 Appendix .........................................................................................................................................30
6.1 Connectors and Media...........................................................................................................30
6.2 Cabling ....................................................................................................................................32
6.3 Power Supply Specifications..................................................................................................36

Hardware Installation and Reference Guide Product Overview
1
1 Product Overview
1.1 About the RG-WS7005-A(V2)
The RG-WS7005-A(V2) is a next-generation Gigabit wireless access controller (AC)
launched by Ruijie Networks. It is mainly applied in small- and medium-sized wireless
local area networks (WLANs) to provide powerful access control and radio management
functions. The RG-WS7005-A(V2) supports 54 V DC power supply. With one Gigabit WAN
port and four Gigabit LAN ports powered by PoE, it can uniformly manage Ruijie wireless
access points (APs) and supply power for them. It simplifies wireless networking and
supports the expansion of 4G LTE universal I/O modules. The RG-WS7005-A(V2) can be
deployed on a Layer 2 or Layer 3 network and maintain communications with APs. It
supports interconnection with the WIS system to realize wireless network control on the
mobile end. It can manage up to 64 APs.
1.2 Hardware Features
The front panel of the RG-WS7005-A(V2) accommodates 5 x GE ports, 1 x USB 2.0 port, 1 x
console port, 1 x button, and 1 x DC power connector. The rear panel provides one 4G
module slot.
Figure 1-1Front View of the RG-WS7005-A(V2)

Hardware Installation and Reference Guide Product Overview
2
Figure 1-2Top View of the RG-WS7005-A(V2)
Figure 1-3Front Panel of the RG-WS7005-A(V2)
Table 1-1 Buttons and Ports on the Front Panel
No.
Buttons and
Ports
Description
1
Reset button
Used to reboot the device or restore the device to factory
settings
2
PWR LED
Used to indicate the working status of power supply
3
WAN status LED
Used to indicate the working status of the WAN port
Indice
Altri manuali Ruijie Controllori di accesso IP


















