Skov DOL 339 Manuale utente

DOL 339 Climate and
Production Computer
Technical Manual


Technical Manual
DOL 339 Climate and Production Computer
Program Version
The product described in this manual holds software. This manual corresponds to:
•Software version 6.1
It was released in 2010.
Product and Documentation Changes
SKOV A/S reserve the right to change this manual and the product described herein without further
notice. In case of doubt, please contact SKOV A/S.
Date of change appears from the back page.
IMPORTANT
NOTES CONCERNING THE ALARM SYSTEM
Where climatic control is used in livestock buildings, breakdowns, malfunctions or faulty settings
may cause substantial damage and financial losses. It is therefore essential to install a separate,
independent alarm system, which monitors the house concurrently with the climate computer.
According to EU directives 98/58/EU an alarm system must be installed in any house that is
mechanically ventilated.
Please note that the product liability clause of SKOV A/S' general terms and conditions of sale and
delivery specifies that an alarm system must be installed.
In case of misoperation or improper use, ventilation systems can result in production loss
or cause loss of lives among animals.
SKOV A/S recommend that ventilation systems should be mounted, operated and serviced
only by trained staff and that a separate emergency opening unit and an alarm system be
installed as well as maintained and tested at regular intervals, according to SKOV A/S’s
terms and conditions of sale and delivery.
Note
•All rights reserved. No part of this manual may be reproduced in any manner whatsoever
without the express written permission of SKOV A/S in each case.
•SKOV A/S have made reasonable efforts to ensure the accuracy of the information
contained in this manual. Should any mistakes or imprecise information occur in spite of
this, SKOV A/S would appreciate being notified thereof.
•Irrespective of the above, SKOV A/S shall not have any liability with respect to loss or
damage caused or alleged to be caused by reliance on any information contained herein.
•Copyright 2010 by SKOV A/S.

Technical Manual
DOL 339 Climate and Production Computer
PRODUCT DESCRIPTION 7
PROCEDURE 7
MOUNTING GUIDE 8
1Mounting of DOL 339 together with DOL 278.......................................... 10
2Mounting of DOL 339................................................................................. 11
3Mounting of Auxiliary Contactor .............................................................. 12
4Mounting of DOL 278 Emergency Opening ............................................. 12
5Mounting of Climate Sensors ................................................................... 13
INSTALLATION GUIDE 14
6Electric Connection ................................................................................... 14
6.1 Connecting Cables ............................................................................................................... 14
6.2 Setting of Mains Voltage ..................................................................................................... 14
7Technical Menus ........................................................................................ 15
7.1 Selecting Components.......................................................................................................... 16
7.1.1 Menu for Installation.............................................................................................................. 17
7.1.2 One- and Two-Zone Control.................................................................................................. 19
7.1.3 Air Intake ............................................................................................................................... 19
7.1.3.1 Zone controlled Air Inlets...................................................................................................... 19
7.1.4 Active Functions when the Control Fails............................................................................... 20
7.1.5 Slave Relays........................................................................................................................... 20
7.1.6 De-icing Air Inlet................................................................................................................... 21
7.2 Connecting Components ..................................................................................................... 22
7.2.1 Menu for Show Connection ................................................................................................... 22
7.2.2 Manual I/O Allocation ........................................................................................................... 23
7.2.3 Connecting a UPS (Uninterruptable Power Supply) to DOL 339 ........................................ 23
7.2.4 Settings for Winch Motor ...................................................................................................... 24
7.2.5 Setting of CAN Addresses ..................................................................................................... 25
7.2.6 Setting of CAN Termination Jumpers (max. 1 meter)........................................................... 26
7.2.7 Setting of CAN Termination Jumpers (max. 200 meters) ..................................................... 27
7.2.8 Extra Supply to HI-power Relay Modules/Switch Modules ................................................. 28
7.3 Adjustment ........................................................................................................................... 29
7.3.1 Menu for Adjustment............................................................................................................. 29
7.3.1.1 Setting of Temperature Sensor............................................................................................... 30
7.3.1.2 Setting of Brooding Zone....................................................................................................... 30

Technical Manual 5
DOL 339 Climate and Production Computer
7.3.1.3 Drum Scale ............................................................................................................................ 30
7.4 Calibration............................................................................................................................ 31
7.4.1 Menu for Calibration.............................................................................................................. 31
7.4.1.1 Calibrating the Air Inlet and Air Outlet................................................................................. 32
7.4.1.2 Calibrating the Temperature Sensors..................................................................................... 32
7.4.1.3 Calibrating the Humidity Sensors.......................................................................................... 32
7.4.1.4 Calibrating the Electronic Silo Weighing Module................................................................. 33
7.4.1.5 Calibration of Drum Scale ..................................................................................................... 36
7.5 User Setup............................................................................................................................. 37
7.5.1 Menu for User Setup.............................................................................................................. 37
7.5.1.1 Setting of Measuring Units .................................................................................................... 37
7.5.1.2 Setting of Screen.................................................................................................................... 37
7.6 Service Information ............................................................................................................. 38
7.6.1 Menu for Service Information ............................................................................................... 38
7.6.1.1 Operation log ......................................................................................................................... 38
7.7 Testing................................................................................................................................... 39
7.7.1 Testing Basic Components .................................................................................................... 39
7.7.1.1 Testing the Inside Temperature and Air Humidity Sensors................................................... 39
7.7.1.2 Testing the Auxiliary Sensor ................................................................................................. 39
7.7.1.3 Testing the Alarm .................................................................................................................. 39
7.7.1.4 Testing the DOL 278 Emergency Opening Unit ................................................................... 39
7.7.2 Testing Optional Components: Manual Control.................................................................... 40
7.7.3 Menu for Manual/Auto .......................................................................................................... 40
7.7.3.1 Testing Climate Functions ..................................................................................................... 42
7.7.3.2 Testing Emergency Air Inlet.................................................................................................. 45
7.7.3.3 Reading of ventilation status.................................................................................................. 45
7.7.3.4 Testing Production Functions ................................................................................................ 45
7.8 Setting the System................................................................................................................ 48
7.8.1 Menu for Setting .................................................................................................................... 48
7.8.2 Climate................................................................................................................................... 51
7.8.2.1 Setting Exhaustion (MultiStep®)............................................................................................ 51
7.8.2.2 Setting of Ventilation............................................................................................................. 53
7.8.2.3 Setting of Fan......................................................................................................................... 54
7.8.2.4 Setting of Heating .................................................................................................................. 54
7.8.2.5 Setting of Stand Alone Heaters.............................................................................................. 55
7.8.2.6 Setting of Spray Cooling........................................................................................................ 55
7.8.2.7 Setting of Pad Cooling........................................................................................................... 55
7.8.2.8 Setting of Pressure Sensor ..................................................................................................... 55
7.8.2.9 Adjusting the CO2Sensor ...................................................................................................... 55

6 Technical Manual
DOL 339 Climate and Production Computer
7.8.2.10 Adjusting the Auxiliary Sensor.............................................................................................. 56
7.8.2.11 Setting of Night Setback ........................................................................................................ 56
7.8.3 Production.............................................................................................................................. 57
7.8.3.1 Setting of Bird Weighers ....................................................................................................... 57
7.8.3.2 Setting of Silo Change ........................................................................................................... 57
7.8.3.3 Setting calibration values for silo and day silo ...................................................................... 58
7.8.3.4 Setting accept values for silo and day silo ............................................................................. 58
7.8.3.5 Setting of Light Dimmer........................................................................................................ 58
7.8.3.6 Setting the raising of feeding system ..................................................................................... 58
7.8.3.7 Setting of feed........................................................................................................................ 58
7.8.4 Info Matic .............................................................................................................................. 59
7.8.5 Password ................................................................................................................................ 59
7.8.6 View Levels ........................................................................................................................... 59
7.9 Compact Flash Card............................................................................................................ 65
7.9.1 Menu for CF-card .................................................................................................................. 65
7.9.1.1 Updating Software ................................................................................................................. 66
7.10 Control Parameters ............................................................................................................. 68
7.10.1 Menu for Control Parameters................................................................................................. 68
7.10.1.1 Cycle Time............................................................................................................................. 70
7.11 Adjustment of Pressure ....................................................................................................... 71
7.11.1 Menu for Adjust Negative Pressure....................................................................................... 71
7.11.1.1 Setting Change Between Roof and Side Mode ...................................................................... 75
7.11.1.2 Setting of Minimum Air Inlet ................................................................................................ 75
7.11.1.3 Adjusting the Active Pressure................................................................................................ 75
7.12 Adjustment of Stepless Unit................................................................................................ 76
8Troubleshooting Guide ............................................................................. 77
8.1 Table for Temperature Sensor Control ............................................................................. 77
TECHNICAL DATA 78

Technical Manual 7
DOL 339 Climate and Production Computer
PRODUCT DESCRIPTION
This technical manual deals with the installation of the DOL 339 climate and production computer and
is primarily aimed at electricians who are to mount, install and test the computer.
A certified electrician must carry out the installation in accordance with applicable national rules and
in Europe in accordance with applicable EU rules.
DOL 339 is available in three different hardware and four different software variants (Combi-Tunnel,
Tunnel, LPV, Production) and it can regulate and monitor the climate and production in all types of
livestock houses.
PROCEDURE
1. Mounting
□Climate and production computer
□Emergency opening
□Climate sensors
2. Installation
□Connect cables according to the wiring diagram for the emergency opening of the system
□Set voltage in the computer
□Connect mains voltage to the computer
□Select components in the Installation menu of the computer
□Connect the individual components by means of the Show connection menu of the
computer and the wiring diagrams
□Adjust the system (e.g. selection of operation form)
□Test the system
3. Startup
□Setting and calibration

8 Technical Manual
DOL 339 Climate and Production Computer
MOUNTING GUIDE
Figure 1: Outline of connections DOL 339 Combi-Tunnel
Figure 2: Outline of connections DOL 339 Tunnel

Technical Manual 9
DOL 339 Climate and Production Computer
Figure 3: Outline of connections DOL 339 LPV
Figure 4: Outline of connections DOL 339 production

10 Technical Manual
DOL 339 Climate and Production Computer
1 Mounting of DOL 339 together with DOL 278
Figure 5: Mounting of DOL 339 together with DOL 278 and wiring box
DOL 278
DOL 339
Indice
Altri manuali Skov Scrivania