ESI 3~6K-S1-HA1~6 user manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
Installation and maintenance personnel requirements
When the product is in the running state, some parts may be electrified and hot.
Improper use, improper installation or operation may result in serious injury to
person or property. Transport, loading, unloading, installation, start-up and
maintenance operations must be performed by a qualified electrical engineer (all
accident precautions in force in the user's country must be followed!)
SOFARSOLAR will not be responsible for any personal injury or property injury
caused by improper use.
Installation location requirement
Please install the product according to the following section. Place inverter in an
appropriate bearing capacity objects (such as solid brick wall, or strength
equivalent mounting surface, etc.) and make sure inverter vertical placed. A
proper installation location must have enough space for fire engine access in
order for maintenance if faulty occur. Ensure the inverter is installed in a wall
ventilated environment and have enough air cooling cycle. Air humidity should
less than 90%.
Transportation Requirement
Inverter is in the good electrical and physical condition when it ship out from factory.
During transport, inverter must be placed in its original package or other proper
package. Transportation company should responsible for any damage during transport
period.
If you find any packing problems that may cause the damage of inverter or any visible
damage, please notice the responsible transportation company immediately. You can
ask your installer or SOFARSOLAR for help is necessary.
This product contains battery module through UN38.3, belongs to the ninth category
of dangerous goods. Therefore, loading and unloading must comply with local laws
and regulations and industry standards during transportation. Rough loading and
unloading may cause short circuit or damage to batteries in containers, which may