Spectur STA6 Manuale utente

1300 802 960 | www.spectur.com.au
STA6 Installation
Guide

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
2
Contents
A Message From the CEO: Gerard Dyson ............................................................................................. 4
Getting Started ................................................................................................................................. 5
What you need .............................................................................................................................. 5
Installing a SIM card in the Spectur Modem ............................................................................. 5
Step 1: ......................................................................................................................................... 5
Step 2: ........................................................................................................................................ 6
Step 3: ........................................................................................................................................ 6
Step 4: ........................................................................................................................................ 7
Assembling the solar panel ........................................................................................................... 8
What you need: ........................................................................................................................ 8
Step 1: ......................................................................................................................................... 8
Step 2: ........................................................................................................................................ 8
Step 3: ........................................................................................................................................ 9
Pole installation .............................................................................................................................. 10
Picking a spot: ............................................................................................................................. 10
In-ground ..................................................................................................................................... 10
What you need: ...................................................................................................................... 10
Step 1: ....................................................................................................................................... 11
Step 2: ...................................................................................................................................... 11
Step 3: ...................................................................................................................................... 11
Step 4: ...................................................................................................................................... 11
Completing the installation ...................................................................................................... 12
What you need ....................................................................................................................... 12
Step 1: ....................................................................................................................................... 12
Step 2: ...................................................................................................................................... 13
Step 3: ...................................................................................................................................... 13
Step 4: ...................................................................................................................................... 14
Step 5: ...................................................................................................................................... 14
Attaching the panel ....................................................................................................................... 15
Step 1: ....................................................................................................................................... 15
Step 2: ...................................................................................................................................... 15

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
3
Step 3: ...................................................................................................................................... 15
Step 4: ...................................................................................................................................... 16
Step 5: ...................................................................................................................................... 16
Outboard battery box ................................................................................................................ 17
Step 1: ....................................................................................................................................... 17
Step 2: ...................................................................................................................................... 17
Step 3: ...................................................................................................................................... 18
Step 4: ...................................................................................................................................... 18
Other Base Options ....................................................................................................................... 19
Mobile Base installation ............................................................................................................ 19
What you need: ...................................................................................................................... 19
Step 1: ....................................................................................................................................... 19
Step 2: ...................................................................................................................................... 20
Step 3: ...................................................................................................................................... 20
Step 4: ...................................................................................................................................... 21
Step 5: ...................................................................................................................................... 21
Trailer installation ....................................................................................................................... 22
Step 1: ....................................................................................................................................... 22
Non-standard installation ......................................................................................................... 23
Setup and checking system .................................................................................................... 23
Step 1: ....................................................................................................................................... 23
Step 2: ...................................................................................................................................... 23
Leaving sites orderly ................................................................................................................. 24
Step 1: ....................................................................................................................................... 24
Step 2: ...................................................................................................................................... 24
Step 3: ...................................................................................................................................... 24
How to ensure customers know how to use services and get assistance .................. 25
Step 1: ....................................................................................................................................... 25
Step 2: ...................................................................................................................................... 25
Notes: ............................................................................................................................................... 25
Number of bags of concrete to use: ................................................................................. 25

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
4
A Message From the CEO: Gerard Dyson
Hi, I am Gerard Dyson, the CEO of Specur Ltd. Congratulations on your purchase of one of our Spectur
Systems. Please read the installation manual fully prior to conducting an installation. We strongly
recommend the use of PPE throughout the installation and a site-specific job hazard assessment.
Good luck and be safe
Gerard Dyson
CEO

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
5
Getting Started
What you need
○ Solar panel
○ Solar panel mount and bracket
○ Main camera system
○ Battery
○ Mounting screw
○ Sim pin
Installing a SIM card in the Spectur Modem
Step 1:
Locate the side of the system where the plug shown below is on the right corner. This is the
side where the Spectur Modem can be accessed.
Commented [GP1]: This I different for 3 & 4 camera
systems as the DLINK ethernet switch will need to be
removed to give access.
Commented [MD2R1]: Show how to install sim card in 3
and 4 camera system.
Commented [MD3R1]:

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
6
Step 2:
Remove the black glass and the blue panel above it.
Step 3:
If the STA6 system contains less than 3 cameras skip this step and proceed to step 4.
Unscrew the screws at the below the D-link. Shift it to the side to reveal the modem.

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
7
Step 4:
Use a SIM Pin to remove the sim tray from the modem. Then proceed to place the Sim in the
tray and insert it in the modem. Note how the Sim is oriented as shown below.

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
8
Assembling the solar panel
What you need:
Step 1:
Lay out the parts above as shown in the image below.
Step 2:
Screw the brackets into the panel. On top it should be an M6x20 bolt followed by an M6
washer. On the bottom it should be an M6 washer,
M6 spring washer, then M6 nut. Do this for all the
bracket arms.
○ 12 x M6x20 bolts
○ 12 x M6 Washers
○ Socket set
○ 6 x M6 Spring washers
○ 6 x M6 Nuts

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
9
Step 3:
Attach the bracket plate to the brackets from step 2. The bolts screw in from below with a
washer on top. With the completion of this step, the panel is ready to be used in the next
steps.

Spectur Guide for STA6 Installation
1300 802 960 | www.spectur.com.au
10
Pole installation
There are many ways a pole can be installed. Namely, in ground, mobile base, or non-
standard.
Picking a spot:
The system should be installed at a location:
• With direct access to full sunlight. If there is even 10% shade over the panel it
will lose 90% of its energy generation.
• Away from other assets such as Power lines and utility pipes (electrical, gas,
water)
• Not pointed at areas that may lead to privacy breaches.
In-ground
What you need:
○ Post-hole digger
○ 2 x kwikset concrete
○ Spirit level
○ At least 4.4L of water
○ Pole
○ Measuring tape
Commented [GP4]: Apply same comments as HD5. But
obviously tailor for anything STA6 specific.
Altri manuali per STA6
1
Indice
Altri manuali Spectur Telecamera di sicurezza

















