
(3) Pre-start up
①Checking before pre-start up
●Check if the water pipe are connected well and if there is any
leakage. The water supply valve are open.
●Make sure the water flow is enough and meet the demand of the
heat pump selected and water flow smoothly without air . In cold area,
pls make sure that the water flow is without freezing
●Check if the power cable is connected well and properly grounded.
●Check if fan blade is blocked by the fixing plate of fan blade and fan
blade protecting grill.
●Check if the tank has been filled with water or enough water volume
that can meet the demand of heat pump running
②Pre-start up
●After check completely and confirm no problem for installation, the
unit can be power to start up .
●After connect power supply, heat pump delay 3mins to start. Check
carefully is there is some abnormal noise or vibration or if the
working current is normal or if water temp increasing is normal.
●After the unit is working properly for 10 minutes without any
problem, then the pre-start up is usefully completed. If not, pls refer to
Service and Maintenance Chapter to solve the problem.
If everything above is OK, the unit can start up. If any of them fails, please improve it.