
Preparing the Installation
Preparation
Specifications regarding the individual screen dimensions,
weight, mounting type, and controls are provided by the
factory when the unit is ordered. Before beginning the
installation:
♦Check the specifications for the frame and the
mounting to be used.
♦Prepare for electrical access
♦Check the size and weight of the screen to be installed
so that you can plan for the number of people required
for the mounting procedure. You need at least two
people to mount the frame and attach the screen.
You will need:
♦Gloves, for handling the screen.
♦Ladders for the personnel supporting the screen during
the mounting process, as needed.
♦A level.
♦Fasteners appropriate for the surface on which the
screen is being mounted.
♦Drills for making holes to attach brackets to the
mounting surface, as needed.
♦Tools for tightening fasteners, including 7/16” and ½”
hex head wrench.
Note: Bolts and other fasteners for the screen are standard
gauge and sizes used in the U.S., regardless of where
they will be installed. For this reason, the sizes are
expressed in inches rather than metric measurements.
Unpacking
Be sure to unpack carefully in a clean area. Use
special care when handling the screen so that it does
not become soiled or damaged.
Inspect contents of this container immediately upon
receipt. All damage claims must be made within 24
hours after receipt of goods.