4 | P a g e
If no floor option was purchased, go to step 2.0 (Wall Assembly)
STEP 1.0
FLOOR KIT
Double Joist 1730mm (42x35mm part of DJ goes at the top inside)
100mm Batten screw (Heavy Duty Floor Only)
75mm Nail (Rebated Floor Only)
Fasten through EP into DJ using 3 x 100BS per join (75N on Rebated Floor)
Fasten through EP into SJ using 2 x 100BS per join (75N on Rebated Floor)
Once first floor in position and logs are in place butt second floor in to mark the hole
positions –when ready using 6 –65HHS screw through EP into EP holding flush on top.
HEAVY DUTY FLOOR KIT
Heavy duty floor can be installed on unlevelled ground –use supplied logs to level your floor
by digging them into the ground.
Install heavy duty floor kit using (L) 4 logs –1 in each corner (position shown above) screw
through frame into log using 4 x 100BS per corner