
4
DESCRIPTION OF AIR TREATMENT UNIT
1.1. COMPOSITION
In its most compl t v rsion, th unit, in its monoblock
or brok n down configuration, compris s:
-On or mor air lock intak s ction
-Filtration s ction
-R cov ry s ction
-H at xchang r s ction (h ating, cooling, post-
h ating)
-Humidifi r s ction
-V ntilation s ction (d liv ry, intak —outl t)
-Sil ncing s ction.
1.2. PERMITTED USE
TCF Air Tr atm nt Units ar d sign d xclusiv ly for
CIVIL AND INDUSTRIAL AIR TREATMENT
In th cas of CORROSIVE and/or EXPLOSIVE air flows
a numb r of sp cial t chnical modifications must b
mad at th d sign stag which, tog th r, adapt th
machin for th tr atm nt of sp cial typ s of flow.
Th Air Tr atm nt Unit must at all tim s b us d
strictly in accordanc with th d sign conditions
stablish d at th tim of contract in agr m nt with
th custom r. ANY OTHER USE SHALL CONSTITUTE
IMPROPER USE AND IS THEREFORE DANGEROUS.
THE MANUFACTURER MAY NOT BE HELD LIABLE
FOR DAMAGE CAUSED BY NON—STANDARD USE OR
ANY USE NOT ENVISAGED IN THE CONTRACT
2. CONTROL, PACKING, TRANSPORTATION
2.1. INSPECTION OF SUPPLY AT THE FIRM
Prior to shipping, ach TCF Air Tr atm nt Unit is
subj ct d to all th functional t sts list d on th attach d
UNIT INSPECTION SHEET (Form E.1.).
Th ch cks p rform d r gard:
- g n ral machin dim nsions
- corr ct ass mbly of th various parts and s ctions
- complianc with th various saf ty rul s in forc
- int grity of all th syst m‘s compon nt parts
- application of th id ntification, op ration and saf ty
notic s.
On compl tion of th Insp ction, th Chi f Insp ctor
appli s th EC mark d monstrating product complianc
with pr vailing Europ an Union machin dir ctiv s.
2.2. PACKING
Th Air Tr atm nt Units ar usually suppli d as fully-
ass mbl d monoblocks. Only if th custom r xpr ssly
r qu sts it can th units b brok n down into s v ral
s ctions to facilitat transportation and carriag through
narrow ap rtur s, stairs or corridors. Transportation of
th machin s, both monoblock and brok n down, can b :
- normal
- sp cial.
In th form r cas , TCF Srl do s not pack th machin . In
th cas of sp cial transportation, th packing r qu st d
is agr d at th tim of contract and is ntir ly for th
custom r's account.
Fragil compon nts suppli d s parat from th Unit,
such as humidifi rs, xchang rs, r cup rators, filt rs,
control boards, tc. ar always d liv r d pack d.
2.3. LOADING, TRANSPORTATION, UNLOADING
TCF Srl disclaims all liability for damag sustain d by th
Air Tr atm nt Units during loading, unloading and
transportation. W th r for r comm nd that sp cial
pr cautions b tak n, including:
- Th load must b firmly s cur d to nsur its int grity
during transportation
- Handling must b p rform d without x rting forc on
proj cting acc ssori s (hydraulic attachm nts, handl s,
hing s, air locks, prot ction roof)
- Do not ov rturn th s ctions as you may oth rwis
br ak int rnal supports, compon nts and damp rs
- Do not subj ct th Unit to viol nt impacts as you may
damag its int grity
- If a forklift truck is us d during th loading, unloading
and handling op rations, th forks of th truck must b
at l ast th sam l ngth as th unit to nsur stability
(fig. 1)
- if th Air Tr atm nt Unit is fitt d with a continuous
st l bas , handling may b accomplish d with a cran ,
using cabl s firmly s cur d to rods (suffici nt for th
str ss involv d) passing through th hol s provid d in
th bas .