
II Quick Guide 1. Overview2
1. Overview
1.1. Overview
These instructions guide the user of the Techman Robot through the boot process for the first time. The
user must thoroughly read and understand Volume 1 "I. Hardware Setup Instructions" before performing the
operations of this Chapter. Otherwise, failure to do so may cause serious danger.
The subsequent chapters of this guide will describe how to install the Techman Robot. If this is your
first time using the Techman Robot, but the robot is not newly unpacked from the carton,especially
when the robot has been installed in the working environment, follow the following instructions to per-
form installation and initial boot according to this Guide:
1. To avoid changes to the original working environment and settings, resulting in risks when returning
to work, verify and retain all necessary setting records together with the person responsible for the
working environment, such as software settings and all hardware wiring.
2. Remove all of the control box's external I/O connections including the analog I/O, EtherCAT port and
network port.
3. Remove all of the control box's connections to external devices / external storage devices through
USB interface, Serial port, and network interface.
4. Unload any object/end effector attached to the end flange, and any electrical connection between
the end effector and end module / control box of the robot.
5. Unload any hardware attached to the robot arm.
Warning
2. Unboxing
2.1 Carton Types
The Techman Robot product is packed in 2 cartons: the robot arm carton and the control box carton, as
shown below:
Robot arm carton