
9
ATTACH HARNESSES
1.B) Install venture RS-232 data harness
(VE1019772) into the designated
2.B) Nest the temperature probe
(VE1015669) around the EVAP coil
inside the cabinet .
1.F) If using a cellular modem , connect
the modem to the venture board in
ignore this step.
1.C)
(VE6822
1.D)
sensor board (VE6822) stays upwards
and doesnt short.
2.C) Feed the temperature probe
(VE1015669) and extension
(VE1016368) into the side cabinet.
Connect extension to the control
board as shown.
1.A) Install venture power harness
(VE1020737) into the designated
2.A) Connect UCB temperature
sensor extension (VE1016368)
to temperature cable with probe
(VE1015669).
1.E) Install venture speaker
(VE1019798) into the designated
port on the back of the venture as
shown.
CAUTION
!
powering up machine.
Step 1: Install Venture Harnessing
Step 2: Install Other Harnessing
VE1021164 - BEVMAX - MEDIA PANEL INSTALLATION MANUAL
INSTALL DOOR
DIAGRAMS REMOVE DOOR
ATTACH HARNESSES
Board must point up
Board must point up
www.veii.com