
3 3/6/2016
Author: Eric Hazen
Date: 2017/02/19
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R02
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
ZC6 / ZN6 Street Front Splitter and Race Upgrade –Install Manual
1. Introduction
1.1. Overview: Detailed instructions on installing the two piece front splitter with supplied
support rod kit for the ZN6 ZC6 chassis.
1.2. Difficulty: Beginner to Moderate
1.3. Time Required: 2.5-4 hours
1.4. Tools Needed:
1.4.1.Splitter Install
1.4.1.1. Jack and Jack Stands
1.4.1.2. Screwdriver
1.4.1.3. 10mm Socket
1.4.1.4. 4mm Allen Wrench
1.4.1.5. 5mm Allen Wrench
1.4.1.6. 9/16” wrench
1.4.2. Race Install
1.4.2.1. Center Punch
1.4.2.2. 1/8” or starter drill bit
1.4.2.3. 1/4” drill bit
1.4.2.4. Drill
1.4.2.5. Spray paint/touch up paint
1.4.2.6. Flat Head
1.4.2.7. Small Philips
1.5. Splitter Components
1.5.1. Front Splitter
1.5.2. Hardware Bag
1.5.2.1. (2) M6 x 1.0 Button Head Cap Screw (BHCS) x 16mm Long
1.5.2.2. (12) M6 x 1.0 BHCS x 30mm Long
1.5.2.3. (2) M6 x 1.0 BHCS x 60mm Long
1.5.2.4. (2) M6 Aluminum Spacer
1.5.2.5. (12) M6 x 38mm Diameter Fender Washer
1.5.2.6. (2) M6 x 18mm Diameter Washer
1.5.2.7. (10) M6 x 1.0 Plastic Rivets
1.5.2.8. (8) 3/8” ID Rivet Nut Backing Washers
1.5.2.9. (1) Rivet Nut Install Tool
1.5.2.10. (2) Rivet Nut Install Bolts
1.5.2.11. (4) 10mm Nylong Spacers
1.5.2.12. (2) M6 x 1.0 Flanged Nuts
1.6. Splitter Race Components
1.6.1. (2) Splitter Rods
1.6.2. (2) Left-hand rod ends
1.6.3. (2) Right-hand rod ends