
5
1
2
~15mm | 0.59’’
Remove the oor panels and the 3 PET layers from the oor structure.
Unscrew the oor levelers to half their length (about 15 mm - 0.59 in), with exception of the center one, that should
stay fully retracted.
Level the oor structure using the 5mm Hex Key (X) - adjust the center leveler last and make sure it stays in
contact with the oor.
Step’s Material
X5mm Bubble Level
up down
!
The precise leveling of the oor structure is crucial for the correct assembly and operation of the VicBooth - use a
bubble level. Make sure the oor structure is in its nal position - once assembled, the VicBooth should not be moved.
!When walking on top of the VicBooth frame, be careful to only step on the periphery frames.
Avoid placing your feet in the interior of the oor modules.