
PASO 3: CABLEADO DE LA PANTALLA
STEP 3: WIRING OF THE LED DISPLAY
PASO 3: CABLEADO DE LA PANTALLA
STEP 3: WIRING OF THE LED DISPLAY
3.1 CABLEADO DE DATOS
3.1 DATA WIRING
CADA ARMAZON TIENE 2 PUERTOS DE RED.
EL CABLEADO DE DATOS CONSISTE EN INTERCONEC
TAR LOS ARMAZONES DE SU PANTALLA CON CABLE
DE RED ETHERNET.
LONGITUD MÁXIMA DE CABLE DE
RED ENTRE EL REPRODUCTOR Y LA
PANTALLA: 15 METROS
PUERTO DATOS
CABLE DE RED AL
PUERTO DE DATOS
DEL SIGUIENTE
ARMAZÓN
EACH CABINET HAS 2 ETHERNET PORTS.
DATA WIRING CONSISTS OF INTERCONNECTING YOUR
DISPLAY CABINETS WITH RJ45 ETHERNET CABLE.
MAXIMUM NETWORK CABLE LENGTH
BETWEEN PLAYER AND DISPLAY: 15
METERS DATA PORT
NETWORK CABLE TO
THE DATA PORT OF
THE NEXT CABINET
LOS ARMAZONES SE DEBEN INTERCONECTAR EN UN ORDEN ESPECÍFICO.
PIDA SU DIAGRAMA DE CABLEADO ESPECÍFICO PARA SU PANTALLA A
NUESTRO SERVICIO TÉCNICO ANTES DEL MONTAJE
LED CABINETS MUST BE INTERCONNECTED IN A SPECIFIC ORDER. PLEASE
ASK OUR TECHNICAL SUPPORT FOR YOUR SPECIFIC WIRING DIAGRAM
BEFORE ASSEMBLY.
REPRODUCTOR*
PUERTO HDMI DE ENTRADA OPCIONAL
CABLE DE RED
ADAPTADOR DE
CABLE RED
HEMBRA HEMBRA
CONTENT PLAYER*
HDMI INPUT PORT IS OPTIONAL
NETWORK CABLE
NETWORK CABLE
ADAPTOR
FEMALE TO FEMALE