
4
DPG5019
FILL VALVE INSTALLATION
1. WORK PREPARATION
Remove the inoperative tank ttings and carefully clean the water cistern/tank.
Make sure all debris has been removed prior to installing new tank ttings.
WARNING
Do notuse or drop any chlorine or any chemical related components. Use of such products will:
Result in damage to tank components and may cause ooding and property damage and void warranty.
Do not overtighten nuts, or tank/bowl may crack.
2. FILL VALVE INSTALLATION AND WATER LEVEL ADJUSTMENT
1. Please read carefully the following installation instructions in
order to avoid component damage or injury to the installer.
2. The instructions have been composed based in the latest product
specications. We reserve the right to make modications to the
packaging and specications without providing prior notication.
3. When installing the ll valve,the critical level on the ll valve
(identied on the valve marked ”CL”) should be at least 1”)
above the top of the overow pipe of the ush valve.This is a
plumbing code.
4. We shall not be responsible for failures that are contributed to the
use of parts other than those specied.
5. Water Temperature: 2°C to 45°C.
6. Water Pressure Range: 0.2 Bar to 8 Bar.
Rell tube
overow pipe
bracket
bracket
bolt
overow
pipe
tank overow
pipe
water supply
pipe
inlet adaptor
water supply
switch
screw rod
bolt
1. Unscrew the bracket bolt and locate/install the ll valve onto overow pipe of ush valve.
2. Then tighten the bracket bolt.
3. Connect water supply into inlet shank , turn on the water supply valve (angle stop) (Make sure that rell tube has
been inserted in the ush valve overow pipe in the event the toilet requires rell to the bowl).
4. Check if the inlet valve is under normal operation and adjust the inlet valve oat adjustment thumbscrew clockwise
(for higher oat & water level) or anticlockwise (for lower oat & water level) according to the requirements.
u v w x