Document #: BZ2400-045
5
Installation
An overview of Mechanical and Electrical
Installation instructions is contained in this
section. Details of steps to hang the Model
2400 from the ceiling or mount on a shelf
are contained in Appendix A.
Installation Guidelines
Place the Model 2400 in the room so that air
flow from the HVAC system, fans or other
air flow systems does not blow directly into
or pull air through the Model 2400 air inlet or
clean air outlet.
If the Model 2400 is installed with its air
inlets or clean air outlet directly in line with
the airflow from an HVAC outlet or fan,
ensure a minimum clearance instance of 5’
(1.5m) to avoid excessive air flow through
the unit.
Place the unit so that the control panel and
display are visible and accessible.
Each Model 2400 has the capacity to purify
up to 15,000 cubic feet (430 m3) of space.
For spaces greater than 15,000 cubic feet
(430 m3), multiple Model 2400 units will be
required.
If multiple Bluezone Model 2400 units are
being installed in a room, the following are
recommended guidelines for the placement
of the Bluezone units:
1. Distribute the units relatively evenly
throughout the space.
2. Generally spreading the locations
across the available space is good
practice.
3. Warning: Hang the units from the
ceiling, mount to the wall or on a
shelf/rack to avoid unintended bumping
of the units.
4. Units hung from the ceiling should be
hung to the level of the lights, but not
below lights to avoid blocking light to
the plants.
5. Warning: If the unit is located in an
area with foot traffic and there is a
concern that it could be bumped by
personnel, it should be labeled with
colored tape to make it more visible
and reduce the risk of collision.
6. Warning: Locate the junction
boxes for the units as close as possible
to the units to avoid the risk of hooking
the cord and pulling it out. If the
distance to the junction box is more
than 2’ (0.6 m), the cord should be tied
to the wall, rack, or ceiling to keep it
protected.