GTD10DIM
Steps
1. Remove all sources of power.
2. Remove ballast channel cover.
3. Mount GTD10DIM as shown in Figures A and B.
4. Wire the GTD10DIM using an illustration from the
“Typical Applications” section on page 4 or similar setups
for different application.
5. Before applying power, review the Important Safeguards at
the beginning of this document.
6. Finish installation as required by the NEC, NFPA, state,
local, and other codes. Test the GTD10DIM using the “Test
Procedure” on page 6.
INSTALLATION
3
FIGURE B
BLCD16DIM
Steps
1. Remove all sources of power.
2. Remove ballast channel cover.
3. Mount BLCD16DIM (a couple of mounting options are
shown in Figures C and D ).
4. Wire the BLCD16DIM using an illustration from the
“Typical Applications” section on page 4 or similar setups
for different application.
5. Before applying power, review the Important Safeguards at
the beginning of this document.
6. Finish installation as required by the NEC, NFPA, state,
local, and other codes. Test the BLCD16DIM using the
“Test Procedure” on page 6.
ALL SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL
The GTD10DIM and the BLCD16DIM will activate an emergency lighting load automatically upon the loss of normal power. If
normal power is absent, the status of the load cannot be overridden. However, if the normal power is present, the emergency
lighting load can be controlled by other means in order to use it as a normal lighting load, depending on the wiring setup.
When used as normal lighting, a two second delay will keep the load on, even after wall switch is turned off, to perform
a self-test on the unit. When normal power is present, a status contact will automatically close. Therefore, when normal
power is absent, the status contact will open (perfect for 0-10V dimming controls). A red LED indicates the emergency
power is available. A green LED indicates that normal power is present. A yellow LED copies the status of the load; if the
LED is on, the load is on.
OPERATION
MAINTENANCE
No routine maintenance is required for the GTD10DIM or BLCD16DIM. However, it should be checked periodically to ensure that
it is working properly. Note: Make sure to disconnect both the normal and emergency panel circuit breakers before servicing.