Centurion SECTOR II Manuale utente

Centurion Systems (Pty) Ltd
www.centsys.com
SECTOR II RECTANGULAR BOOM POLE
JACK-KNIFE LED INSTALLATION MANUAL
TRAFFIC BARRIERS

After-sales
multi-language
Technical Support
Manufactures to
international
quality standard
ISO 9001:2015
100%
testing of
products
In-house
R&D
development
team
Centurion Systems (Pty) Ltd reserves the right to make changes to the product described in this
manual without notice and without obligation to notify any persons of any such revisions or changes.
Additionally, Centurion Systems (Pty) Ltd makes no representations or warranties with respect to
this manual. No part of this document may be copied, stored in a retrieval system or transmitted in any
form or by any means electronic, mechanical, optical or photographic, without the express prior written
consent of Centurion Systems (Pty) Ltd.
1986 1990 1995 1999 Today
Sales and technical support
to Africa, Europe, Asia,
the Americas, Australia
and the Pacic
Call Centre Operating Times
Monday to Friday
08h00 to 17h00 GMT+2,
Saturdays
08h00 to 14h00 GMT+2
Company Prole
ISO 9001:2015

Contents
1. INTRODUCTION
2. PRODUCT IDENTIFICATION
3. PHYSICAL INSTALLATION
3.1. Mounting the PSU and Relay
3.2. Boom pole modications
4. COMPLETING THE INSTALLATION
4.1. Wiring the Control Card
4.1.1. Option 1
4.1.2. Option 2
4.2. New Controller setup
4.2.1. Settings for Option 1
4.2.2. Settings for Option 2
4.3. Old Controller setup
4.3.1. Settings for Option 1
5. INSTALLATION HANDOVER
Icons used in this manual
This icon indicates tips and other information that could be useful during the
installation.
This icon denotes variations and other aspects that should be considered during
installation.
This icon indicates warning, caution or attention! Please take special note of
critical aspects that MUST be adhered to in order to prevent injury.
Page 4
Page 6
Page 7
Page 7
Page 9
Page 15
Page 15
Page 15
Page 16
Page 17
Page 17
Page 17
Page 17
Page 17
Page 18

page 4 www.centsys.com
1. Introduction
INTRODUCTIONSECTION 1
ATTENTION!
To ensure the safety of people and possessions, it is important that
you read all of the following instructions.
Incorrect installation or incorrect use of the product could cause
serious harm to people.
The installer, being either professional or DIY, is the last person on
the site who can ensure that the operator is safely installed and that
the whole system can be operated safely.
Warnings for the Installer
CAREFULLY READ AND FOLLOW ALL INSTRUCTIONS before installing the
product.
• All installation, repair, and service work to this product must be carried out by a
suitably qualied person
• Do not activate your barrier unless you can see it and can determine that its area of
travel is clear of people, pets, or other obstructions
• NO ONE MAY CROSS THE PATH OF A MOVING BARRIER. Always keep people and
objects away from the barrier and its area of travel
• NEVER LET CHILDREN OPERATE OR PLAY WITH THE BARRIER CONTROLS
• Secure all easily-accessed barrier controls in order to prevent unauthorised use of the
barrier
• Do not in any way modify the components of the automated system
• Do not install the equipment in an explosive atmosphere: the presence of ammable
gasses or fumes is a serious danger to safety
• Before attempting any work on the system, cut electrical power to the operator and
disconnect the batteries
• Always ensure that the boom pole is in the raised position before disconnecting AC
and DC power to the Trac barrier to prevent damage to the controller
• The mains power supply of the automated system must be tted with an all-pole
switch with contact opening distance of 3mm or greater. Use of a 5A thermal breaker
with all-pole circuit break is recommended
• Make sure that an earth leakage circuit breaker with a threshold of 30mA is tted
upstream of the system
• Never short-circuit the battery and do not try to recharge the batteries with power
supply units other than that supplied with the product, or manufactured by Centurion
Systems (Pty) Ltd
• Make sure that the earthing system is correctly constructed, and that all metal parts
of the system are suitably earthed

page 5 www.centsys.com
INTRODUCTIONSECTION 1
• Safety devices must be tted to the installation to guard against mechanical
movement risks, such as crushing, dragging and shearing
• It is recommended that at least one warning indicator light be tted to every system
• Always t the warning signs visibly to the inside and outside of the barrier
• The installer must explain and demonstrate the manual operation of the barrier in
case of an emergency, and must hand over the user guide to the user
• Explain these safety instructions to all persons authorised to use this barrier, and be
sure that they understand the hazards associated with trac barriers
• Do not leave packing materials (plastic, polystyrene, etc.) within reach of children as
such materials are potential sources of danger
• Dispose of all waste products like packing materials, worn-out batteries, etc.
according to local regulations
• Always check the obstruction detection system and safety devices for correct
operation
• Neither Centurion Systems (Pty) Ltd, nor its subsidiaries, accepts any liability caused
by improper use of the product, or for use other than that for which the automated
system was intended
• This product was designed and built strictly for the use indicated in this
documentation. Any other use, not expressly indicated here, could compromise the
service life/operation of the product and/or be a source of danger
• Anything that has not been specied in these instructions may be considered a risk
to your safety, and the safety of others. If you are unsure of an installation matter,
please contact your nearest distributor
WARNING! WARNING! WARNING! WARNING! WARNING!
MOVING BARRIER CAN CAUSE SERIOUS INJURY OR DEATH!
KEEP AWAY! THE BARRIER MAY MOVE AT ANY TIME!
DO NOT ALLOW CHILDREN TO PLAY IN THE AREA
OR OPERATE THE BARRIER.
SAFETY
FIRST

page 6 www.centsys.com
SECTION 2
FIGURE 1. PRODUCT IDENTIFICATION
1. LED strip (x2)
2. Boom pole harness
3. Cable gland
4. Mounting bracket
5. LED power supply
6. Multi-function relay
7. Jack-knife boom pole harness
8. LED PSU harness
9. Relay wiring harness
2. Product Identication
PRODUCT IDENTIFICATION
1
2
3
5 46
98
7

page 7 www.centsys.com
PHYSICAL INSTALLATIONSECTION 3
3. Physical Installation
The following steps should only be performed once the rectangular
boom pole Jack-knife has been successfully tted onto the SECTOR II.
Disconnect both AC and DC power to the SECTOR II before doing any work.
3.1. Mounting the PSU and Relay
8mm
76mm31mm
FIGURE 2
FIGURE 3
3. Drill two 6mm holes.
1. Open the SECTOR II cabinet.
2. From the top of the inner ap,
mark and centre punch hole
positions at 76mm and 107mm.
Ensure that both holes are
8mm away from the edge.
4. Repeat steps 2 and 3 on the
other inner ap.
6mm
hole
Always ensure that the boom pole is in the raised position before
disconnecting AC and DC power to the Trac barrier to prevent damage
to the controller.

page 8 www.centsys.com
PHYSICAL INSTALLATIONSECTION 3
5. Bend the metal tabs on the
mounting bracket outwards.
FIGURE 4
FIGURE 5
6. Fit the mounting bracket into the
four newly-drilled holes on the
inner aps of the cabinet.
Metal
tab
Mounting
bracket
View once the tabs
have been bent
outwards
View once the mounting
bracket has been tted

page 9 www.centsys.com
PHYSICAL INSTALLATIONSECTION 3
3.2. Boom pole modications
4. Route the LED harness through
the 12mm hole, making sure that
the cable can reach the end of
the pole.
30mm
FIGURE 7
FIGURE 8
FIGURE 6
3. Drill one 12mm hole.
The hole must be drilled
through only one wall of
the boom pole.
1. Remove the silicone plug
and plastic bumper from the
rectangular boom pole.
2. Mark and centre punch a hole
position 30mm away from the
end of the Coupling.
Ensure that the hole is
facing the direction of
trac.
12mm
hole
LED harness

page 10 www.centsys.com
PHYSICAL INSTALLATIONSECTION 3
50mm
FIGURE 9
FIGURE 10
FIGURE 11
LED strip
5. Stick the LED strip to the boom
pole by removing the backing.
Start from the side nearest to
the 12mm hole.
Only the blue backing
should be peeled o the
LED strip.
6. Remove the silicone plug, plastic
bumper and end cap from the
Jack-knife boom pole.
7. Mark and centre punch a hole
position 50mm away from the
edge of the Jack-knife boom
pole.
Ensure that the hole is
facing the direction of
trac.
8. Drill one 12mm hole.
The hole must be drilled
through only one wall of
the boom pole.
12mm
hole
Indice
Altri manuali Centurion Barriera automatica



















